255
Views
0
CrossRef citations to date
0
Altmetric
Articles

Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: a system dynamics model

, , , , &
Pages 230-248 | Received 03 Sep 2023, Accepted 16 Nov 2023, Published online: 30 Nov 2023

References

  • Assaad, R. H., El-Adaway, I. H., Hastak, M., & Needy, K. L. (2022). The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7), 04022056.
  • Ay, I., & Ayalp, G. G. (2021). Factors affecting the design, manufacturing, storage, transportation, and construction processes of prefabricated buildings. Teknik Dergi, 32(3), 10907–10917.
  • Ayalp, G. G., & Ay, I. (2019). Identifying the factors affecting the use of prefabricated constructions system in Turkey. International Journal of Technology and Engineering Studies, 5(1), 1–8.
  • Benachio, G. L. F., Freitas, M. D. D., & Tavares, S. F. (2021). Interactions between lean construction principles and circular economy practices for the construction industry. Journal of Construction Engineering and Management, 147(7), 04021068.
  • Berndt, B. C., & Kim, S. (2015). Logarithmic means and double series of Bessel functions. International Journal of Number Theory, 11(05), 1535–1556.
  • Cai, Y. N., & Huang, Q. J. (2020). Relevant standards and quality management of the mould for reinforced concrete segments of shield tunnels. Modern Tunnelling Technology, 57(1), 70–75.
  • de Assis, R. F., de Santa-Eulalia, L. A., Ferreira, W. D., Armellini, F., Anholon, R., Rampasso, I. S., & dos Santos, J. G. C. L. (2021). Translating value stream maps into system dynamics models: A practical framework. The International Journal of Advanced Manufacturing Technology, 114(11–12), 3537–3550.
  • Dong, Y. H., Jaillon, L., Chu, P., & Poon, C. S. (2015). Comparing carbon emissions of precast and cast-in-situ construction methods – A case study of high-rise private building. Construction and Building Materials, 99, 39–53.
  • Gao, Y., Casasayas, O., Wang, J. Y., & Xu, X. X. (2022). Factors affecting the blockchain application in construction management in China: An ANP-SWOT hybrid approach. Architectural Engineering and Design Management, 19, 665–680.
  • Hong, J. K., Shen, G. Q., Mao, C., Li, Z. D., & Li, K. J. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207.
  • Hong, J. K., Shen, G. Q. P., Li, Z. D., Zhang, B. Y., & Zhang, W. Q. (2018). Barriers to promoting prefabricated construction in China: A cost–benefit analysis. Journal of Cleaner Production, 172, 649–660.
  • Ismaeel, W. S. E. (2022). Sustainable site selection using system dynamics; case study LEED-certified project. Architectural Engineering and Design Management, 18, 368–386.
  • Kasperzyk, C., Kim, M. K., & Brilakis, I. (2017). Automated re-prefabrication system for buildings using robotics. Automation in Construction, 83, 184–195.
  • Kim, M. K., Cheng, J. C. P., Sohn, H., & Chang, C. C. (2015). A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning. Automation in Construction, 49, 225–238.
  • Kong, D. Q. (2022). Application of BIM technology in solving the problem of water leakage of prefabricated exterior walls. Building Structure, 52(S2), 1751–1755.
  • Kupec, V., Lukáč, M., Písař, P., & Gubíniová, K. (2020). Increasing personnel competencies in museums with the use of auditing and controlling. Sustainability, 12(24), 10343.
  • Li, C. Z., Hong, J. K., Fan, C., Xu, X. X., & Shen, G. Q. (2018). Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach. Journal of Cleaner Production, 195, 1533–1545.
  • Li, C. Z., Shen, G. Q., Xu, X. X., Xue, F., Sommer, L., & Luo, L. Z. (2017). Schedule risk modeling in prefabrication housing production. Journal of Cleaner Production, 153, 692–706.
  • Li, T. Z. H., & You, X. Y. (2022). Impact factors analysis on prefabricated building quality based on Apriori algorithm. Journal of Tongji University (Natural Science), 50(02), 147–152.
  • Li, X. J., Wang, C., Kassem, M. A., Alhajlah, H. H., & Bimenyimana, S. (2022). Evaluation method for quality risks of safety in prefabricated building construction using SEM-SDM approach. International Journal of Environmental Research and Public Health, 19(9), 5180.
  • Love, P. E. D., Edwards, D. J., & Smith, J. (2016). Rework causation: Emergent theoretical insights and implications for research. Journal of Construction Engineering and Management, 142(6), 04016010.
  • Man, Q. P., Zheng, M. H., Chang, Y., Yang, X. L., Yuan, Z. M., & Ma, C. F. (2023). Construction worker allocation optimization of prefabricated buildings based on intelligent simulation: A case study of flow construction mode. China Civil Engineering Journal, 56(9), 178–188.
  • Mandoki, R., & Orr, J. (2023). The social acceptance of mass produced residential buildings among Hungarian young adults. Architectural Engineering and Design Management, 19(2), 148–162.
  • Okada, A., Okamoto, Y., Clare, A., & Uno, Y. (2014). Fundamental study on releasability of molded rubber from mold tool surface. The International Journal of Advanced Manufacturing Technology, 70(5–8), 1515–1521.
  • Oti-Sarpong, K., Shojaei, R. S., Dakhli, Z., Burgess, G., & Zaki, M. (2022). How countries achieve greater use of offsite manufacturing to build new housing: Identifying typologies through institutional theory. Sustainable Cities and Society, 76, 103403.
  • Polat, G. (2008). Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management, 134(3), 169–178.
  • Pundir, M., & Anciaux, G. (2021). Numerical generation and contact analysis of rough surfaces in concrete. Journal of Advanced Concrete Technology, 19(7), 864–885.
  • Pungercar, V., Zhan, Q. S., Xiao, Y. Q., Musso, F., Dinkel, A., & Pflug, T. (2021). A new retrofitting strategy for the improvement of indoor environment quality and energy efficiency in residential buildings in temperate climate using prefabricated elements. Energy and Buildings, 241, 110951.
  • Quale, J., Eckelman, M. J., Williams, K. W., Sloditskie, G., & Zimmerman, J. B. (2012). Construction matters: Comparing environmental impacts of building modular and conventional homes in the United States. Journal of Industrial Ecology, 16(2), 243–253.
  • Shi, X. H., Chen, X., Han, L., & Zhou, Z. J. (2023). The mechanism and test of the impact of environmental regulation and technological innovation on high quality development. Journal of Combinatorial Optimization, 45(1), 52.
  • Sutrisna, M., Ramanayaka, C. D. D., & Goulding, J. S. (2018). Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), 381–397.
  • Sutrisna, M., Ramnauth, V., & Zaman, A. (2022). Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders. Architectural Engineering and Design Management, 18(3), 165–183.
  • Tan, Y., Li, S. L., & Wang, Q. (2020). Automated geometric quality inspection of prefabricated housing units using BIM and LiDAR. Remote Sensing, 12(15), 2492.
  • Tchidi, M. F., He, Z., & Li, Y. B. (2012). Process and quality improvement using six sigma in construction industry. Journal of Civil Engineering and Management, 18(2), 158–172.
  • Valinejadshoubi, M., Bagchi, A., & Moselhi, O. (2022). Damage detection for prefabricated building modules during transportation. Automation in Construction, 142, 104466.
  • Wang, J. W., Song, Y. H., Yuan, C. B., Guo, F., Huangfu, Y. R., & Liu, Y. P. (2022). Research on the training and management of industrializing workers in prefabricated building with machine vision and human behaviour modelling based on industry 4.0 era. Computational Intelligence and Neuroscience, 2022, 9230412.
  • Wang, Q. K., Guo, Z., Mei, T. T., Li, Q. Y., & Li, P. (2018a). Labor crew workspace analysis for prefabricated assemblies’ installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), 374–411.
  • Wang, Y. W., Yuan, Z. M., & Sun, C. S. (2018b). Research on assembly sequence planning and optimization of precast concrete buildings. Journal of Civil Engineering and Management, 24(2), 106–115.
  • Wen, Y. F. (2021). Research on the intelligent construction of prefabricated building and personnel training based on BIM5D. Journal of Intelligent & Fuzzy Systems, 40(4), 8033–8041.
  • Wu, G. B., Yang, R., Li, L., Bi, X., Liu, B. S., Li, S. Y., & Zhou, S. X. (2019). Factors influencing the application of prefabricated construction in China: From perspectives of technology promotion and cleaner production. Journal of Cleaner Production, 219, 753–762.
  • Xia, M. M., Zhao, L., Qiao, Y. N., Yuan, Z. M., Cui, Y. L., Zhao, L. M., & Li, J. L. (2022). Analysis of factors affecting the quality of precast components based on structural equation modeling. Arabian Journal for Science and Engineering, 47(4), 4171–4185.
  • Xie, N., Dang, Y. D., & Shi, X. M. (2019). Construction risk control mechanism for fabricated concrete structure. Journal of Tongji University (Natural Science), 47(11), 1676–1682.
  • Xu, G. Y., Li, M., Luo, L. Z., Chen, C. H., & Huang, G. Q. (2018a). Cloud-based fleet management for prefabrication transportation. Enterprise Information Systems, 13(1), 87–106.
  • Xu, X. X., Wang, J. Y., Li, C. Z., Huang, W. K., & Xia, N. N. (2018b). Schedule risk analysis of infrastructure projects: A hybrid dynamic approach. Automation in Construction, 95, 20–34.
  • Xu, Y., Luo, Y., & Zhang, J. (2022). Laser-scan based pose monitoring for guiding erection of precast concrete bridge piers. Automation in Construction, 140, 104347.
  • Xu, Z., Zayed, T., & Niu, Y. M. (2020). Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore. Journal of Cleaner Production, 245, 118861.
  • Yan, X. Y., Wang, S. G., Huang, C. L., Qi, A., & Hong, C. (2018). Experimental study of a new precast prestressed concrete joint. Applied Sciences, 8(10), 1871.
  • Yang, B., Liu, B. D., Xiao, J. Z., Zhang, B. H., Wang, Z. C., & Dong, M. S. (2021). A novel construction scheduling framework for a mixed construction process of precast components and cast-in-place parts in prefabricated buildings. Journal of Building Engineering, 43, 103181.
  • Yang, S. L., Hou, Z. W., & Chen, H. B. (2022). Network model analysis of quality control factors of prefabricated buildings based on the complex network theory. Buildings, 12(11), 1874.
  • Ye, C. (2011). Plastic mold in a small application of precast concrete construction. Concrete, 3, 102–138.
  • Yeh, D. Y., Cheng, C. H., & Hsiao, S. C. (2011). Classification knowledge discovery in mold tooling test using decision tree algorithm. Journal of Intelligent Manufacturing, 22(4), 585–595.
  • Yi, W., Wang, S. A., & Zhang, A. (2020). Optimal transportation planning for prefabricated products in construction. Computer-Aided Civil and Infrastructure Engineering, 35(4), 342–353.
  • Yu, T., Man, Q. P., Wang, Y. W., Shen, G. Q., Hong, J. K., Zhang, J. S., & Zhong, J. (2019). Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model. Journal of Cleaner Production, 241, 118390.
  • Yuan, Z. M., Ni, G. D., Wang, L. X., Qiao, Y. N., Sun, C. S., Xu, N., … Wang, W. S. (2020a). Research on the barrier analysis and strength measurement of a prefabricated building design. Sustainability, 12(7), 2994.
  • Yuan, Z. M., Zhang, Z. Y., Ni, G. D., Chen, C., Wang, W. S., & Hong, J. K. (2020b). Cause analysis of hindering on-site lean construction for prefabricated buildings and corresponding organizational capability evaluation. Advances in Civil Engineering, 2020, 8876102.
  • Zhang, B., Li, K. Q., Zhang, S. Q., Hu, Y. F., & Han, B. (2022). Strength prediction and application of cemented paste backfill based on machine learning and strength correction. Heliyon, 8(8), e10338.
  • Zhang, J., Wang, M. T., Zhao, L. L., & Chen, M. (2023). Analysis of factors affecting prefabricated building quality based on ISM-BN. Sustainability, 15(12), 9682.
  • Zhang, K., & Tsai, J. S. (2021). Identification of critical factors influencing prefabricated construction quality and their mutual relationship. Sustainability, 13(19), 11081.
  • Zhao, W. J., Jiang, Y., Liu, Y. Y., & Shu, J. P. (2022). Automated recognition and measurement based on three-dimensional point clouds to connect precast concrete components. Automation in Construction, 133, 104000.
  • Zhou, Q. W., Deng, X. P., Hwang, B. G., & Yu, M. (2022). System dynamics approach of knowledge transfer from projects to the project-based organization. International Journal of Managing Projects in Business, 15(2), 324–349.
  • Zhu, L., & Malešević, B. (2019). Inequalities between the inverse hyperbolic tangent and the inverse sine and the analogue for corresponding functions. Journal of Inequalities and Applications, 2019, 93.
  • Zhu, W. X., Zhang, J., Wang, D., Ma, C. S., Zhang, J. F., & Chen, P. (2023). Study on the critical factors influencing high-quality development of green buildings for carbon peaking and carbon neutrality goals of china. Sustainability, 15(6), 5035.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.