A heuristic method for production scheduling of an open pit mining operation

, ORCID Icon &
Pages 293-305 | Received 28 Aug 2023, Accepted 01 Nov 2023, Published online: 16 Nov 2023

References

  • Z. Fu, M.W.A. Asad, and E. Topal, A new model for open-pit production and waste-dump scheduling, Eng. Optim. 51 (4) (2019), pp. 718–732. doi:10.1080/0305215X.2018.1476501.
  • S. Li, Y.A. Sari, and M. Kumral, Optimization of mining–mineral processing integration using unsupervised machine learning algorithms, Nat. Resour. Res. 29 (5) (2020), pp. 3035–3046. doi:10.1007/s11053-020-09628-0.
  • K. Fathollahzadeh, M.W.A. Asad, E. Mardaneh, and M. Cigla, Review of solution methodologies for open pit mine production scheduling problem, Int. J. Min. Reclam. Environ. 35 (8) (2021), pp. 564–599. doi:10.1080/17480930.2021.1888395.
  • G. Nelis, F. Meunier, and N. Morales, Column generation for mining cut definition with geometallurgical interactions, Nat. Resour. Res. 31 (1) (2021), pp. 131–148. doi:10.1007/s11053-021-09976-5.
  • L. Caccetta and S.P. Hill, An application of branch and cut to open pit mine scheduling, J. Global Optim. 27 (2–3) (2003), pp. 349–365. doi:10.1023/A:1024835022186.
  • M. Deutsch, K. Dağdelen, and T. Johnson, An open-source program for efficiently computing ultimate pit limits: Mineflow, natural Resources research, Nat. Resour. Res. 31, 3, (Mar 2022), pp. 1175–1187. doi:10.1007/s11053-022-10035-w
  • K. Dagdelen and T.B. Johnson, Open pit mine production scheduling by lagrangian parameterization, in Proceeding of the 19th International Symposium on Application of Computers and Operations Research in the Mineral Industry, R. V. Ramani, ed., Society of Mining Engineers, Littleton, Colorado, USA, 1986, pp. 127–142.
  • S. Ramazan, The new fundamental tree algorithm for production scheduling of open pit mines, Eur. J. Oper. Res. 177 (2) (2007), pp. 1153–1166. doi:10.1016/j.ejor.2005.12.035.
  • A. Akaike and K. Dagdelen, A strategic production scheduling method for an open pit mine, in Proceeding of the 28th International Symposium on Application of Computers and Operations Research in the Mineral Industry, K. Dagdelen, ed., Society of Mining Engineers, Littleton, Colorado, USA, 1999, pp. 729–738.
  • K. Kawahata, A new algorithm to solve large scale mine production scheduling problems by using the Lagrangian relaxation method, PhD Thesis, Colorado School of Mines, Golden, Colorado, 2006.
  • C. Cullenbine, R.K. Wood, and A. Newman, A sliding time window heuristic for open pit mine block sequencing, Optim. Lett. 5 (3) (2011), pp. 365–377. doi:10.1007/s11590-011-0306-2.
  • W.B. Lambert and A.M. Newman, Tailored lagrangian relaxation for the open pit block sequencing problem, Ann. Oper. Res. 222 (1) (2014), pp. 419–438. doi:10.1007/s10479-012-1287-y.
  • S. Ramazan and R. Dimitrakopoulos, Production scheduling with uncertain supply: A new solution to the open pit mining problem, Optim. Eng. 14 (2) (2013), pp. 361–380. doi:10.1007/s11081-012-9186-2.
  • A. Onur and P. Dowd, Open-pit optimization, part 2: Production scheduling and inclusion of roadways, mining Technology - transactions of the institution of mining and metallurgy, Section A 102 (1993), pp. 105–113.
  • B. Elevli, Open pit mine design and extraction sequencing by use of or and ai concepts, Int. J. Surf. Min. Reclam. Environ. 9 (4) (1995), pp. 149–153. doi:10.1080/09208119508964741.
  • M. De Lara, N. Morales, and N. Beeker, Adaptive strategies for the open-pit mine optimal scheduling problem, Available online at http://arxiv.org/abs/1706.08264 accessed on January 19, 2022 (2017).
  • A.M. Newman, E. Rubio, R. Caro, A. Weintraub, and K. Eurek, A review of operations research in mine planning, Interfaces 40 (3) (2010), pp. 222–245. doi:10.1287/inte.1090.0492.
  • N. Boland, I. Dumitrescu, G. Froyland, and A.M. Gleixner, LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, Comput. Oper. Res. 36 (4) (2009), pp. 1064–1089. doi:10.1016/j.cor.2007.12.006.
  • A. Bley, N. Boland, C. Fricke, and G. Froyland, A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Comput. Oper. Res. 37 (9) (2010), pp. 1641–1647. doi:10.1016/j.cor.2009.12.008.
  • D. Bienstock and M. Zuckerberg, Solving LP relaxations of large-scale precedence constrained problems, in: Proceedings of the Integer Programming and Combinatorial Optimization 14th International Conference, Lausanne, Switzerland, June 9-11, 2010, pp. 1–14.
  • R. Chicoisne, D. Espinoza, M. Goycoolea, E. Moreno, and E. Rubio, A new algorithm for the open-pit mine production scheduling problem, Oper Res 60 (3) (2012), pp. 517–528. doi:10.1287/opre.1120.1050.
  • T.W. Vossen, R.K. Wood, and A.M. Newman, Hierarchical benders decomposition for open-pit mine block sequencing, Oper Res 64 (4) (2016), pp. 771–793. doi:10.1287/opre.2016.1516.
  • M. Samavati, D. Essam, M. Nehring, and R. Sarker, A methodology for the large-scale multi-period precedence-constrained knapsack problem: An application in the mining industry, Int. J. Prod. Econ. 193 (2017), pp. 12–20. doi:10.1016/j.ijpe.2017.06.025.
  • O.R. Letelier, D. Espinoza, M. Goycoolea, E. Moreno, and G. Muñoz, Production scheduling for strategic open pit mine planning: A mixed-integer programming approach, Oper Res 68 (5) (2020), pp. 1425–1444. doi:10.1287/opre.2019.1965.
  • S.Q. Liu and E. Kozan, New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems, Expert Syst Appl 43 (2016), pp. 59–65. doi:10.1016/j.eswa.2015.08.044.
  • H. Eivazy and H. Askari-Nasab, A hierarchical open-pit mine production scheduling optimisation model, Int. J. Min. Eng. 4 (2) (2012), pp. 89–115. doi:10.1504/IJMME.2012.052436.
  • E. Jélvez, N. Morales, P. Nancel-Penard, J. Peypouquet, and P. Reyes, Aggregation heuristic for the open-pit block scheduling problem, Eur. J. Oper. Res. 249 (3) (2016), pp. 1169–1177. doi:10.1016/j.ejor.2015.10.044.
  • D. Espinoza, M. Goycoolea, E. Moreno, and A. Newman, Minelib: A library of open pit mining problems, Ann. Oper. Res. 206 (1) (2013), pp. 93–114. doi:10.1007/s10479-012-1258-3.
  • B. Denby and D. Schofiled, Open-pit design and scheduling by use of genetic algorithms, mining Technology - transactions of the institution of mining and metallurgy, Section A 103 (1994), pp. A21–A26.
  • M.S. Shishvan and J. Sattarvand, Long term production planning of open pit mines by ant colony optimization, Eur. J. Oper. Res. 240 (3) (2015), pp. 825–836. doi:10.1016/j.ejor.2014.07.040.
  • J. Sattarvand and C. Niemann-Delius, A New Metaheuristic Algorithm for Long-Term Open-Pit Production Planning / Nowy meta-heurystyczny algorytm wspomagający długoterminowe planowanie produkcji w kopalni odkrywkowej, Arch. Min. Sci. 58 (1) (2013), pp. 107–118. doi:10.2478/amsc-2013-0007.
  • R.C. Goodfellow and R. Dimitrakopoulos, Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines, Mining Tech. Trans. Ins. Mini. & Metallurgy 122 (2) (2013), pp. 67–77. doi:10.1179/147490013X13639459465736.
  • R.C. Goodfellow and R. Dimitrakopoulos, Global optimization of open pit mining complexes with uncertainty, Appl. Soft. Comput. 40 (2016), pp. 292–304. doi:10.1016/j.asoc.2015.11.038.
  • A. Lamghari and R. Dimitrakopoulos, Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty, Eur. J. Oper. Res. 250 (1) (2016), pp. 273–290. doi:10.1016/j.ejor.2015.08.051.
  • M. Osanloo, J. Gholamnejad, and B. Karimi, Long-term open pit mine production planning: A review of models and algorithms, Int. J. Min. Reclam. Environ. 22 (1) (2008), pp. 3–35. doi:10.1080/17480930601118947.
  • M.W.A. Asad and R. Dimitrakopoulos, Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles, Resour. Policy 37 (1) (2012), pp. 81–89. doi:10.1016/j.resourpol.2011.12.002.
  • M.W.A. Asad and R. Dimitrakopoulos, A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams, Resour. Policy 38 (4) (2013), pp. 591–597. doi:10.1016/j.resourpol.2013.09.008.
  • K.F. Lane, The economic definition of ore: Cutoff grade in theory and practice, in Mining Journal Books, Mining Journal Books Limited London, London, 1988.
  • F. Sotoudeh, M. Nehring, M. Kizil, P. Knights, and A. Mousavi, A new mathematical formulation for underground cut-off grade determination in the presence of pre-concentration systems, Nat. Resour. Res. 30 (5) (2021), pp. 3241–3259. doi:10.1007/s11053-021-09892-8.
  • IBM, High-performance optimization solver for linear, mixed-integer and quadratic programming. https://www.ibm.com/analytics/cplex-optimizer ( Analytics) accessed on 1/02/2022.