References
- Abu Shanab, I., & Sorensen, A. (2022). Air emission pollutants of different partial depth concrete bridge deck repair techniques: A comparative study. Journal of Structural Integrity & Maintenance, 8(2), 100–8. https://doi.org/10.1080/24705314.2023.2167575
- ASCE. (2021). Bridge C. Retrieved August 6, 2022, from https://infrastructurereportcard.org/wp-content/uploads/2020/12/Bridges-2021.pdf
- ASTM International. (2013). ASTM C805/C805M Standard Test Method for Rebound Number of Hardened Concrete.
- ASTM International. (2016). ASTM C42/C42M Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.
- ASTM International. (2018). ASTM C39/C39M compressive strength of concrete cylinders.
- Darter, M. (2017). Concrete repair best practices: A series of case studies (No. cmr17-013). Department of Transportation. Construction & Materials Division.
- Frentress, D. P., & Harrington, D. S. (2012). Partial-depth Repair of Concrete Pavements. Iowa State University Institute for Transportation.
- Hu, Y. N., Wang, C. Y., Ding, H. N., & Wang, Z. W. (2006). Wear Mechanism of Diamond Saw Blades for Dry Cutting Concrete. In Key Engineering Materials (Vol. 304(305), pp. 315–319). Trans Tech Publications, Ltd. https://doi.org/10.4028/www.scientific.net/kem.304-305.315
- Inyang, N., Al-Hussein, M., El-Rich, M., & Al-Jibouri, S. (2012). Ergonomic analysis and the need for its integration for planning and assessing construction tasks. Journal of Construction Engineering and Management, 138(12), 1370–1376. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000556
- Johnson, B., Otieno, W., & Campbell-Kyureghyan, N. (2017). Influence of jackhammer weight on grip pressure, muscle activity, and hand–arm vibration of the operator. IISE Transactions on Occupational Ergonomics and Human Factors, 5(1), 12–22. https://doi.org/10.1080/24725838.2016.1269852
- Lachemi, M., Hossain, K. M. A., Ramcharitar, M., & Shehata, M. (2007). Bridge deck rehabilitation practices in North America. Journal of Infrastructure Systems, 13(3), 225–234. https://doi.org/10.1061/(ASCE)1076-0342(2007)13:3(225)
- Maguire, M., Sorensen Andrew, D., Thomas Robert, J., Pour, A. B., & Al Sarfin, M. A. (2021). Evaluation of commercially available concrete bridge deck repair materials (No. UT-17.105). Utah Department of Transportation-Research Division.
- Ramcharitar, M. (2005). Current bridge deck rehabilitation practices: Use and effectiveness (No MQ-94225 UMI). National Library of Canada.
- Rodriguez, J. (2019). How to safely use an electric or pneumatic jackhammer. Retrieved July 6, 2022, from https://www.thebalancesmb.com/how-to-use-a-jackhammer-844942
- Smith, K. D., Harrington, D. S., Pierce, L., Ram, P., & Smith, K. L. (2014). Concrete pavement preservation guide. United States. Federal Highway Administration.
- Vorster, M. C., Merrigan, J. P., Lewis, R. W., & Weyers, R. E. (1992). Techniques for concrete removal and bar cleaning on bridge rehabilitation projects (No. SHRP-S-336).Washington, D.C: National Research Council.
- Wilson, T. P., Smith, K. L., & Romine, A. R. (1999). Materials and Procedures for Rapid Repair of Partial-Depth Spalls in Concrete Pavements: Manual of Practice (Update). United States. Department of Transportation. Federal Highway Administration.
- Zhu, J., Zheng, W., Sneed, L. H., Xu, C., & Sun, Y. (2019). Green demolition of reinforced concrete structures: Review of research findings. Global Journal of Research In Engineering, 19(4), 1–18.