Publication Cover
Mining Technology
Transactions of the Institutions of Mining and Metallurgy
Volume 132, 2023 - Issue 3
413
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

Review of recent developments in short-term mine planning and IPCC with a research agenda

, &
Pages 179-201 | Received 19 Nov 2022, Accepted 22 May 2023, Published online: 08 Jun 2023

References

  • 2018 Global Fuel Prices Chart. Pp. IEA, Global fuel price changes, 2005-2018, IEA, Paris. https://www.iea.org/data-and-statistics/charts/global-fuel-price-changes-2005-2018.
  • 2022a Petroleum and Other Liquids. U.S. Energy Information Administration. https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=EMD_EPD2D_PTE_NUS_DPG&f=M.
  • 2022b US Average Retail Price of Electricity (I:USARPE). USA: YCHARTS. https://ycharts.com/indicators/us_average_retail_price_of_electricity_total.
  • 2023a Average Fuel Prices in the USA. USA: U.S. Department of Energy. https://afdc.energy.gov/data/10326.
  • 2023b Putting Price on Carbon Pollution. Canada: Government of Canada. https://www.canada.ca/en/environment-climate-change/services/climate-change/pricing-pollution-how-it-will-work/putting-price-on-carbon-pollution.html.
  • Abbaspour H, Drebenstedt C. 2020. Determination of transition time from truck-shovel to an IPCC system considering economic viewpoint by system dynamics modelling. 28th International Symposium on Mine Planning and Equipment Selection, MPES 2019, Perth, WA, Australia, December 2–4, 2019. Springer. p. 289–295.
  • Abbaspour H, Drebenstedt C, Dindarloo SR. 2018. Evaluation of safety and social indexes in the selection of transportation system alternatives (truck-shovel and IPCCs) in open pit mines. Saf Sci. 108:1–12.
  • Awuah-Offei K, Askari-Nasab H. 2009. Valuation of belt conveyor and truck haulage systems in an open pit mine using life cycle assessment. The Canadian Institute of Mining. Metall Pet Bull. 102:1–6.
  • Bektaş T, Laporte G. 2011. The pollution-routing problem. Transp Res B Methodol. 45(8):1232–1250.
  • Ben-Awuah E, Pourrahimian Y, Askari-Nasab H. 2010. Hierarchical mine production scheduling using discrete-event simulation. Int J Min Miner Eng. 2:137–158.
  • Bernardi L, Kumral M, Renaud M. 2020. Comparison of fixed and mobile in-pit crushing and conveying and truck-shovel systems used in mineral industries through discrete-event simulation. Simul Model Pract Theory. 103:102100.
  • Blom M, Pearce AR, Stuckey PJ. 2016. Short-term scheduling of an open-pit mine with multiple objectives. Eng Optim. 49:1–19.
  • Blom M, Pearce AR, Stuckey PJ. 2017. Short-term scheduling of an open-pit mine with multiple objectives. Eng Optim. 49(5):777–795.
  • Blom M, Pearce AR, Stuckey PJ. 2018. Short-term planning for open pit mines: a review. Int J Min Reclam Environ. 33(5): 1–22.
  • Blom ML, Burt CN, Stuckey PJ. 2014. A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines. Informs J Comput. 26(4):658–676.
  • Bodon P, Sandeman T, Stanford C. 2011. Modeling the mining supply chain from mine to port: a combined optimization and simulation approach. J Min Sci. 47:202–211.
  • Both C, Dimitrakopoulos R. 2020. Joint stochastic short-term production scheduling and fleet management optimization for mining complexes. Optim Eng. 21(4):1717–1743.
  • Bozorgebrahimi E, Hall RA, Blackwell GH. 2003. Sizing equipment for open pit mining - a review of critical parameters. Inst Min Metall Trans Sect A Min Technol. 112(3):A171–A179.
  • Can L, Grossmann IE. 2021. A review of stochastic programming methods for optimization of process systems under uncertainty. Front Chem Eng. 2(1). doi:10.3389/fceng.2020.622241.
  • Chilès JP, Delfiner P. 2012. Geostatistics: modeling spatial uncertainty. 2 vols. Volume 2. Paris, France, John Wiley & Sons, Inc. doi:10.1002/9781118136188
  • Curran M,A. 2014. Strengths and limitations of life cycle assessment. In: W. Klöpffer, editor. Background and future prospects in life cycle assessment. Dordrecht: Springer Netherlands; p. 189–206.
  • Dean M, Knights P, Nehring M. 2015. Selection and planning of fully mobile IPCC systems for deep open-pit metalliferous applications. AusIMM 2015 3rd International Future Mining Conference; Sydney, Australia.
  • Dellino G, Meloni C, Pierreval H. 2014. Simulation-optimization of complex systems: methods and applications. Simul Model Pract Theory. 46:1–3.
  • De Werk M, Ozdemir B, Kumral M. 2017. Cost analysis of material handling systems in open pit mining: case study on an iron ore prefeasibility study. Eng Econ. 62(4):369–386.
  • Dimitrakopoulos R, Jewbali A. 2013. Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine. Trans Inst Min Metall Sect A Min Technol. 122(2):110–123.
  • Dzakpata I, Knights P, Nehring M. 2016. Truck and shovel versus In-Pit conveyor systems: a comparison Of The valuable operating time. Proceedings of the 16th Coal Operators’ Conference, Univeristy of Wolongong. p. 463–476.
  • Eivazy H, Askari-Nasab H. 2012. A mixed integer linear programming model for short-term open pit mine production scheduling. Trans Inst Min Metall Sect A Min Technol. 121(2):97–108.
  • Elkan C, Noto K. 2008. Learning classifiers from only positive and unlabeled data. Proceedings of the 14th ACM SIGKDD International Conference on Knowledge Discovery and Data Mining. p. 213–220.
  • Erkayaoğlu M, Demirel N. 2016. A comparative life cycle assessment of material handling systems for sustainable mining. J Env Manag. 174:1–6.
  • Errico F, Desaulniers G, Rousseau LM. 2016. A priori optimization with recourse for the vehicle routing problem with hard time windows and stochastic service times. Eur J Oper Res. 249(1):55–66.
  • Feld S, Roch C, Gabor T. 2019. A hybrid solution method for the capacitated vehicle routing problem using a quantum annealer. Frontiers in ICT. 6(13):1–13.
  • Feng Y, Zhang RQ, Jia G. 2017. Vehicle routing problems with fuel consumption and stochastic travel speeds. Math Probl Eng. 2017:6329203.
  • Figliozzi M. 2010. Emissions minimization vehicle routing problem. Transp Res Rec J Transp Res Board. 2197:1–21.
  • Fioroni MM, Franzese LAG, Bianchi TJ. 2008. Concurrent simulation and optimization models for mining planning. Proceedings of 40th Conference on Winter Simulation. p. 759–767.
  • Franceschetti A, Honhon D, Bektaş T. 2013. The time-dependent pollution-routing problem. Transp Res B, Methodol. 56:265–293.
  • Fu MC. 2015. Handbook of simulation optimization, Vol. 216. New York, NY: Springer. doi:10.1007/978-1-4939-1384-8S.
  • Fuming L, Qingxiang C, Shuzhao C. 2015. A comparison of the energy consumption and carbon emissions for different modes of transportation in open-cut coal mines. Int J Min Sci Technol. 25(2):261–266. doi:10.1016/j.ijmst.2015.02.015.
  • Gholamnejad J. 2008. A zero-one integer programming model for open pit mining sequences. J South African Inst Min Metall. 108:759–762.
  • Grodzevich O, Romanko O. 2006. Normalization and other topics in multi­objective optimization. Proceedings of the First. Fields-MITACS. Industrial Problems Workshop. p. 89–101.
  • Hay E, Nehring M, Knights P. 2020. Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study. Int J Min Reclam Environ. 34(7):498–518.
  • Jabali O, Van Woensel T, De Kok T. 2012. Analysis of travel times and CO2 emissions in time-dependent vehicle routing. Prod Oper Manage. 21(6):1060–1074. doi:10.1111/j.1937-5956.2012.01338.x.
  • Jewbali A, Dimitrakopoulos R. 2018. Stochastic mine planning-example and value from integrating long-and short-term mine planning through simulated grade control, Sunrise Dam, Western Australia. Advances in Applied Strategic Mine Planning. p. 173–190.
  • Klanfar M, Vrkljan D. 2012. Benefits of using mobile crushing and screening plants in quarrying crushed stone. AGH J Min Geoeng. 36:167–175.
  • Koehler F. 2003. In-pit crushing system the future mining option. Proceedings of Mine Planning and Equipment Selection (MPES); Melbourne, Australasian Institute of Mining and Metallurgy. p. 371–376.
  • Konak G, Onur AH, Karakus D. 2007. Selection of the optimum in-pit crusher location for an aggregate producer. J South Afr Inst Min Metall. 107(3):161–166.
  • Kozan E, Liu S, Wolff R. 2013. A short-term production scheduling methodology for open-pit mines. Proceedings of the 36th Application of Computers and Operations Research in the Mineral Industry (APCOM) Symposium. p. 465–473.
  • Kozan E, Liu SQ. 2016. A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations. Min Technol. 125(1):47–53.
  • L'Heureux G, Gamache M, Soumis F. 2013. Mixed integer programming model for short term planning in open-pit mines. Trans Inst Min Metall, Sect A: Min Technol. 122(2):101–109.
  • Liu D, Pourrahimian Y. 2021. A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor. Mining. 1(1):59–79.
  • Liu SQ, Kozan E. 2017. Integration of mathematical models for ore mining industry. Int J Syst Sci Oper Logist. 6:1–14.
  • Londoño JG, Knights PF, Kizil MS. 2013. Modelling of in-pit crusher conveyor alternatives. Min Technol. 122(4):193–199.
  • Manriquez F, González H, Nelson MV. 2019. Short-term open-pit mine production scheduling with hierarchical objectives. 39th International Symposium on Application of Computers and Operations Research in the Mineral Industry.Wroclaw, Poland.
  • Manríquez F, Pérez J, Morales N. 2020. A simulation–optimization framework for short-term underground mine production scheduling. Optim Eng. 21(3):939–971.
  • Marinaki M, Marinakis Y. 2016. A glowworm swarm optimization algorithm for the vehicle routing problem with stochastic demands. Expert Syst Appl. 46:145–163.
  • Matamoros MEV, Dimitrakopoulos R. 2016. Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. Eur J Oper Res. 255(3):911–921.
  • McCarthy RJ. 2011. In-pit crushing and conveying: fitting a square peg in a round open pit: Canadian Institute of Mining. Metallurgy and Petroleum.
  • Moradi Afrapoli A, Askari-Nasab H. 2017. Mining fleet management systems: a review of models and algorithms. Int J Min Reclam Environ. 33(1):1–19. doi:10.1080/17480930.2017.1336607.
  • Morris P. 2008. Key production drivers in in pit crushing and conveying (IPCC) studies. South Afr Inst Min Metall:12.
  • Mousavi A, Kozan E, Liu SQ. 2016a. Comparative analysis of three metaheuristics for short-term open pit block sequencing. J Heuristics. 22(3):301–329.
  • Mousavi A, Kozan E, Liu SQ. 2016b. Open-pit block sequencing optimization: a mathematical model and solution technique. Eng Optim. 48:1–19.
  • Nehring M, Knights PF, Kizil MS. 2018. A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems. Int J Min Sci Technol. 28(2):205–214.
  • Nelis G, Morales N. 2022. A mathematical model for the scheduling and definition of mining cuts in short-term mine planning. Optim Eng. 23(1):233–257.
  • Norgate T, Haque N. 2013. The greenhouse gas impact of IPCC and ore-sorting technologies. Miner Eng. 42:13–21.
  • Nunes R, Junior H, Tomi G. 2019. A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project. REM Int Eng J. 72:285–291.
  • Osanloo M, Paricheh M. 2020. In-pit crushing and conveying technology in open-pit mining operations: a literature review and research agenda. Int J Min Reclam Environ. 34(6):430–457.
  • Paduraru C, Dimitrakopoulos R. 2018. Adaptive policies for short-term material flow optimization in a mining complex. Min Technol Trans Inst Min Metall. 127(1):56–63.
  • Paricheh M, Osanloo M. 2016. Determination of the optimum in-pit crusher location in open-pit mining under production and operating cost uncertainties. 6th International Conference on Computer Applications in the Minerals Industries; Istanbul, Turkey.
  • Paricheh M, Osanloo M. 2019a. Concurrent open-pit mine production and in-pit crushing–conveying system planning. Eng Optim. 52(3):1–16.
  • Paricheh M, Osanloo M. 2019b. A new search algorithm for finding candidate crusher locations inside open pit mines. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection.
  • Paricheh M, Osanloo M. 2020. A new search algorithm for finding candidate crusher locations inside open pit mines. Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES, Cham, Springer International Publishing. p. 10–25.
  • Paricheh M, Osanloo M, Rahmanpour M. 2016. A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining. Int J Min Reclam Environ. 32(1):35–55.
  • Paricheh M, Osanloo M, Rahmanpour M. 2017. In-pit crusher location as a dynamic location problem. The South Afr Inst Min Metall. 117(6):599–607.
  • Quigley M, Dimitrakopoulos R. 2019. Incorporating geological and equipment performance uncertainty while optimising short-term mine production schedules. Int J Min Reclam Environ. 34(5):362–383.
  • Rahmanpour M, Osanloo M, Adibi N. 2013. An approach to determine the location of an in pit crusher in open pit mines. 23rd International Mining Congress and Exhibition of Turkey, IMCET, Vol. 1. p. 141–149.
  • Ritter R. 2016. Contribution to the capacity determination of semi-mobile in-pit crushing and conveying systems. Faculty of Geosciences, Geoengineering and Mining Technische Universität Bergakademie Freiberg.
  • Ritter R, Drebenstedt C. 2019. Output prediction of semi mobile in pit crushing and conveying systems (SMIPPC). In: Litvinenko Vladimir, editor. Scientific and practical studies of raw material issues, Vol. 1. London: Taylor & Francis Group; p. 61–69.
  • Rodovalho EdC, Lima HM, De Tomi G. 2016. New approach for reduction of diesel consumption by comparing different mining haulage configurations. J Environ Manag. 172:177–185.
  • Roumpos C, Partsinevelos P, Vlachou A. 2014. The optimal location of the distribution point of the belt conveyor system in continuous surface mining operations. Simul Model Pract Theory. 47:19–27.
  • Samavati M, Essam D, Nehring M. 2020. Production planning and scheduling in mining scenarios under IPCC mining systems. Comput Oper Res. 115:104714.
  • Samavati M, Essam DL, Nehring M. 2018. Open-Pit mine production planning and scheduling: a research agenda. data and decision sciences in action. Cham: Springer International Publishing. p. 221–226.
  • Sandeman T, Fricke C, Bodon P. 2011. Integrating optimization and simulation - a comparison of two case studies in mine planning. Proceedings of the 2010 Winter Simulation Conference. p. 1898–1910.
  • Sarasola B, Doerner KF, Schmid V. 2016. Variable neighborhood search for the stochastic and dynamic vehicle routing problem. Ann Oper Res. 236(2):425–461.
  • Schroder DL. 2003. The use of in-pit crushing and conveying methods to significantly reduce transportation costs by truck. Coaltrans Asia Conference; Bali.
  • Shamsi M, Nehring M. 2021. Determination of the optimal transition point between a truck and shovel system and a semi-mobile in-pit crushing and conveying system. J South Afr Inst Min Metall. 121:497–504.
  • Shamsi M, Pourrahimian Y, Rahmanpour M. 2022. Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying. Int J Min Reclam Environ. 36(2):142–158.
  • Shishvan MS, Benndorf J. 2014. Performance optimization of complex continuous mining system using stochastic simulation. Engineering Optimization IV - Proceedings of the 4th International Conference on Engineering Optimization; Lisbon.
  • Shishvan MS, Benndorf J. 2016. The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation. J South Afr Inst Min Metall. 116:259–264.
  • Shishvan MS, Benndorf J. 2017. Operational decision support for material management in continuous mining systems: from simulation concept to practical full-scale implementations. Minerals. 7:116.
  • Smith ML. 1998. Optimizing short-term production schedules in surface mining: integrating mine modeling software with AMPL/CPLEX. Int J Surf Min, Reclam Environ. 12(4):149–155.
  • Taheri M, Irannajad M, Ataee P. 2009. An approach to determine the locations of in-pit crushers in deep open-pit mines. 9th International Multidicsciplinary Scientific Geoconference and EXPO, SGEM 2009, Albena, Bulgaria, Vol. 1. International Multidisciplinary Scientific Geoconference, June 14–19, 2009. p. 341–347.
  • Thomas A, Singh G, Krishnamoorthy M. 2013. Distributed optimisation method for multi-resource constrained scheduling in coal supply chains. Int J Prod Res. 51(9):2740–2759.
  • Thomas A, Venkateswaran J, Krishnamoorthy M. 2014. A resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain example. Eur J Oper Res. 236(3):946–956.
  • Topf A. 2017. In-pit crushing and conveying systems changing the way ore is moved: mining.com. https://www.mining.com/in-pit-crushing-systems-changing-the-way-ore-is-moved/.
  • Torkamani E, Askari-Nasab H. 2015. A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation. Int J Min Miner Eng. 6(2):97–118.
  • Upadhyay SP, Askari-Nasab H. 2016. Truck-shovel allocation optimisation: a goal programming approach. Trans Inst Min Metall, Sect A: Min Technol. 125(2):82–92.
  • Upadhyay SP, Askari-Nasab H. 2017. Dynamic shovel allocation approach to short-term production planning in open-pit mines. Int J Min Reclam Environ. 33(1):1–20.
  • Upadhyay SP, Doucette J, Askari-Nasab H. 2021. Short-term production scheduling in open pit mines with shovel allocations over continuous time frames. Int J Min Miner Eng. 12(4):292–308.
  • Urbanucci L. 2018. Limits and potentials of mixed integer linear programming methods for optimization of polygeneration energy systems. Energy Procedia. 148:1199–1205.
  • Utley RW. 2011. In-pit crsuhing. Volume 2: sme mining engineering handbook, Society for Mining, Metallurgy and Exploration, ISBN: 978-0-87335-264-2.
  • Wachira D, Githiria J, Onifade M. 2021. Determination of semi-mobile in-pit crushing and conveying (SMIPCC) system performance. Arab J Geosci. 14:1–13.
  • Xiao Y, Zhao Q, Kaku I. 2012. Development of a fuel consumption optimization model for the capacitated vehicle routing problem. Comput Oper Res. 39(7):1419–1431.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.