Publication Cover
Bridge Structures
Assessment, Design and Construction
Volume 5, 2009 - Issue 4
69
Views
11
CrossRef citations to date
0
Altmetric
Articles

BrIM for project delivery and the life-cycle: state of the art

, , , , &
Pages 173-187 | Published online: 31 Mar 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Nizar Markiz & Ahmad Jrade. (2022) Integrating an expert system with BrIMS, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management 22:5, pages 913-928.
Read now
Chang-Su Shim, Son N. Dang & Seongjun Park. (2018) Three-Dimensional Information Delivery for Design and Construction of Prefabricated Bridge Piers. Structural Engineering International 28:1, pages 6-12.
Read now

Articles from other publishers (9)

Aly ElgayarAhmad Jrade. (2021) Integrating 3D modeling, sustainability and cost estimating at the conceptual design stage of bridges. Canadian Journal of Civil Engineering 48:12, pages 1694-1705.
Crossref
Ayaz Khan, Samad Sepasgozar, Tingting Liu & Rongrong Yu. (2021) Integration of BIM and Immersive Technologies for AEC: A Scientometric-SWOT Analysis and Critical Content Review. Buildings 11:3, pages 126.
Crossref
Akponanabofa Henry Oti & Henry Fonbeyin Abanda. 2020. Data-Driven Modeling for Sustainable Engineering. Data-Driven Modeling for Sustainable Engineering 161 174 .
Yiye Xu & Yelda Turkan. (2019) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management 27:3, pages 785-807.
Crossref
Aaron Costin, Alireza Adibfar, Hanjin Hu & Stuart S. Chen. (2018) Building Information Modeling (BIM) for transportation infrastructure – Literature review, applications, challenges, and recommendations. Automation in Construction 94, pages 257-281.
Crossref
J.H.M. Tah, A.H. Oti & F.H. Abanda. (2017) A state-of-the-art review of built environment information modelling (BeIM). Organization, Technology and Management in Construction: an International Journal 9:1, pages 1638-1654.
Crossref
Nizar Markiz & Ahmad Jrade. (2014) Integrating a fuzzy-logic decision support system with bridge information modelling and cost estimation at conceptual design stage of concrete box-girder bridges. International Journal of Sustainable Built Environment 3:1, pages 135-152.
Crossref
Yang JiAndré BorrmannJakob BeetzMathias Obergrießer. (2013) Exchange of Parametric Bridge Models Using a Neutral Data Format. Journal of Computing in Civil Engineering 27:6, pages 593-606.
Crossref
Arunprakash M. Shirolé. (2018) Bridge Management to the Year 2020 and Beyond. Transportation Research Record: Journal of the Transportation Research Board 2202:1, pages 159-164.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.