Figures & data
Table 1. Three groups of indicators (E, I, and U) with weight criteria for relative performance.
Table 2. = 100.
Table 3. Cj values (0–10) for TAPEIU calculation.
Table 4. Twenty-six mixed-use projects assessed from 0 to 10 for a given TAPEIU.
Table 5. Taikoo Hui Cj and TEIU parameters for TAPEIU calculation.
Figure 1. HKRI Taikoo Hui project opened in Jing’An District in 2017. Image available at https://www.hkri.com/, Accessed August, 2023.
![Figure 1. HKRI Taikoo Hui project opened in Jing’An District in 2017. Image available at https://www.hkri.com/, Accessed August, 2023.](/cms/asset/f7342622-8201-4082-b6ef-369594ec4b22/oabm_a_2332500_f0001_c.jpg)
Supplemental Material
Download MS Word (3.4 MB)Data availability statement
The author confirms that the data supporting the findings of this study are available within the article [and/or] its Supplementary Materials. The data that support the findings of this study are available from the corresponding author, [AV], upon reasonable request.