398
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Impacts of sustainable transport interventions: changes in perception over time and spatially towards a new bus rapid transit (BRT) infrastructure in Montréal, Canada

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Article: 2296707 | Received 16 Nov 2023, Accepted 05 Dec 2023, Published online: 13 Mar 2024

Figures & data

Figure 1. Status of construction of the Pie-IX BRT stations and their connection to Montréal’s metro lines.

Figure 1. Status of construction of the Pie-IX BRT stations and their connection to Montréal’s metro lines.

Figure 2. Distribution of home locations of those aware of the Pie-IX BRT project.

Figure 2. Distribution of home locations of those aware of the Pie-IX BRT project.

Table 1. Socio-demographic split over time and by proximity to the Pie-IX BRT line.

Table 2. Distribution of agreement to statements regarding the Pie-IX BRT over time and by proximity to the Pie-IX BRT line.

Table 3. Summary of themes regarding the Pie-IX BRT over time and by proximity to the Pie-IX BRT line.