Publication Cover
Mining Technology
Transactions of the Institutions of Mining and Metallurgy
Volume 132, 2023 - Issue 4
172
Views
0
CrossRef citations to date
0
Altmetric
Research Articles

A Genetic algorithm scheme for large scale open-pit mine production scheduling

, ORCID Icon &
Pages 225-236 | Received 10 Jan 2023, Accepted 07 Jun 2023, Published online: 30 Jun 2023
 

ABSTRACT

Due to the large size of open-pit mines’ long-term production scheduling (OPMPS) problem in large-scale deposits, it is challenging to solve that problem as the mixed integer linear programming (MILP) model. This study used an approach of the genetic algorithm (GA) to tackle this challenge. So, in a small hypothetical deposit, based on the blocks in the ultimate pit limit and scenarios with 2–6 phases, net present values (NPV) and computational times obtained from the GA and MILP model were compared to evaluate the GA. Also, the GA was applied to a large-scale deposit to determine the efficiency of the GA in real deposits. The maximum NPV was obtained for the four-phase scenario in the hypothetical deposit and the six-phase scenario in the large-scale deposit. Although the GA’s NPV decreased slightly compared to the global optimum solution from the MILP model, the computational time was significantly reduced.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Log in via your institution

Log in to Taylor & Francis Online

There are no offers available at the current time.

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.