101
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Proactive project scheduling using GPU-accelerated simulations under uncertainty environment

&
Pages 612-629 | Received 11 May 2022, Accepted 07 May 2023, Published online: 23 Jun 2023

References

  • Aghaie, A., and H. Mokhtari. 2009. “Ant Colony Optimization Algorithm for Stochastic Project Crashing Problem in PERT Networks Using MC Simulation.” The International Journal of Advanced Manufacturing Technology 45 (11–12): 1051–1067. https://doi.org/10.1007/s00170-009-2051-6.
  • Al-Fawzan, M. A., and M. Haouari. 2005. “A Bi-Objective Model for Robust Resource-Constrained Project Scheduling.” International Journal of Production Economics 96 (2): 175–187. Elsevier. https://doi.org/10.1016/j.ijpe.2004.04.002.
  • Artigues, C., R. Leus, and F. Talla Nobibon. 2013. “Robust Optimization for Resource-Constrained Project Scheduling with Uncertain Activity Durations.” Flexible Services and Manufacturing Journal 25 (1): 175–205. Springer. https://doi.org/10.1007/s10696-012-9147-2.
  • Ashtiani, B., G.-R. Jalali, M.-B. Aryanezhad, and A. Makui. 2007. “A New Approach for Buffer Sizing in Critical Chain Scheduling.” In 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 1037–1041. IEEE.
  • Ashtiani, B., R. Leus, and M.-B. Aryanezhad. 2011. “New Competitive Results for the Stochastic Resource-Constrained Project Scheduling Problem: Exploring the Benefits of Pre-Processing.” Journal of Scheduling 14 (2): 157–171. Springer. https://doi.org/10.1007/s10951-009-0143-7.
  • Atkinson, R., L. Crawford, and S. Ward. 2006. “Fundamental Uncertainties in Projects and the Scope of Project Management.” International Journal of Project Management 24 (8): 687–698. Elsevier. https://doi.org/10.1016/j.ijproman.2006.09.011.
  • Baradaran, S., S. F. Ghomi, M. Ranjbar, and S. S. Hashemin. 2012. “Multi-Mode Renewable Resource-Constrained Allocation in PERT Networks.” Applied Soft Computing 12 (1): 82–90. Elsevier. https://doi.org/10.1016/j.asoc.2011.09.007.
  • Bie, L., N. Cui, and X. Zhang. 2012. “Buffer Sizing Approach with Dependence Assumption Between Activities in Critical Chain Scheduling.” International Journal of Production Research 50 (24): 7343–7356. Taylor & Francis. https://doi.org/10.1080/00207543.2011.649096.
  • Creemers, S. 2015. “Minimizing the Expected Makespan of a Project with Stochastic Activity Durations Under Resource Constraints.” Journal of Scheduling 18 (3): 263–273. Springer. https://doi.org/10.1007/s10951-015-0421-5.
  • Davari, M., and E. Demeulemeester. 2019. “The Proactive and Reactive Resource-Constrained Project Scheduling Problem.” Journal of Scheduling 22 (2): 211–237. https://doi.org/10.1007/s10951-017-0553-x.
  • Deblaere, F., E. Demeulemeester, and W. Herroelen. 2011. “Proactive Policies for the Stochastic Resource-Constrained Project Scheduling Problem.” European Journal of Operational Research 214 (2): 308–316. Elsevier. https://doi.org/10.1016/j.ejor.2011.04.019.
  • De Meyer, A., C. H. Loch, and M. T. Pich. 2002. “Managing Project Uncertainty: From Variation to Chaos.” MIT Sloan Management Review 43 (2): 60. Sloan Management Review Association.
  • Fallah, M., B. Ashtiani, and M. B. Aryanezhad. 2010. “Critical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing.” International Journal of Research and Reviews in Applied Sciences 3 (3): 280–289.
  • Fu, N., H. Chuin Lau, and P. Varakantham. 2015. “Robust Execution Strategies for Project Scheduling with Unreliable Resources and Stochastic Durations.” Journal of Scheduling 18 (6): 607–622. Springer. https://doi.org/10.1007/s10951-015-0425-1.
  • Fu, N., H. Chuin Lau, P. Varakantham, and F. Xiao. 2012. “Robust Local Search for Solving Rcpsp/Max with Durational Uncertainty.” Journal of Artificial Intelligence Research 43:43–86. https://doi.org/10.1613/jair.3424.
  • Ghoddousi, P., R. Ansari, and A. Makui. 2017. “An Improved Robust Buffer Allocation Method for the Project Scheduling Problem.” Engineering Optimization 49 (4): 718–731. Taylor & Francis. https://doi.org/10.1080/0305215X.2016.1206534.
  • Goldratt, E. M. 2017. Critical Chain: A Business Novel. Routledge.
  • Hazır, Ö., E. Erel, and Y. Günalay. 2011. “Robust Optimization Models for the Discrete Time/Cost Trade-Off Problem.” International Journal of Production Economics 130 (1): 87–95. Elsevier. https://doi.org/10.1016/j.ijpe.2010.11.018.
  • Hu, X., N. Cui, and E. Demeulemeester. 2015. “Effective Expediting to Improve Project Due Date and Cost Performance Through Buffer Management.” International Journal of Production Research 53 (5): 1460–1471. Taylor & Francis. https://doi.org/10.1080/00207543.2014.948972.
  • Ke, H., H. Liu, and G. Tian. 2015. “An Uncertain Random Programming Model for Project Scheduling Problem.” International Journal of Intelligent Systems 30 (1): 66–79. https://doi.org/10.1002/int.21682.
  • Khemakhem, M. A., and H. Chtourou. 2013. “Efficient Robustness Measures for the Resource-Constrained Project Scheduling Problem.” International Journal of Industrial and Systems Engineering 14 (2): 245–267. Inderscience Publishers Ltd. https://doi.org/10.1504/IJISE.2013.053738.
  • Lamas, P., and E. Demeulemeester. 2016. “A Purely Proactive Scheduling Procedure for the Resource-Constrained Project Scheduling Problem with Stochastic Activity Durations.” Journal of Scheduling 19 (4): 409–428. https://doi.org/10.1007/s10951-015-0423-3.
  • Lambrechts, O., E. Demeulemeester, and W. Herroelen. 2008a. “Proactive and Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities.” Journal of Scheduling 11 (2): 121–136. https://doi.org/10.1007/s10951-007-0021-0.
  • Lambrechts, O., E. Demeulemeester, and W. Herroelen. 2008b. “A Tabu Search Procedure for Developing Robust Predictive Project Schedules.” International Journal of Production Economics 111 (2): 493–508. Elsevier. https://doi.org/10.1016/j.ijpe.2007.02.003.
  • Leach, L. P. 2014. Critical Chain Project Management. Boston: Artech House.
  • Leus, R., and W. Herroelen. 2004. “Stability and Resource Allocation in Project Planning.” IIE Transactions 36 (7): 667–682. Taylor & Francis. https://doi.org/10.1080/07408170490447348.
  • Ma, W., Y. Che, H. Huang, and H. Ke. 2016. “Resource-Constrained Project Scheduling Problem with Uncertain Durations and Renewable Resources.” International Journal of Machine Learning and Cybernetics 7 (4): 613–621. Springer. https://doi.org/10.1007/s13042-015-0444-4.
  • Ma, G., A. Wang, L. Nan, L. Gu, and Q. Ai. 2014. “Improved Critical Chain Project Management Framework for Scheduling Construction Projects.” Journal of Construction Engineering and Management 140 (12): 04014055. American Society of Civil Engineers. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000908.
  • Minguillon, F. E., and N. Stricker. 2020. “Robust Predictive–Reactive Scheduling and Its Effect on Machine Disturbance Mitigation.” CIRP Annals 69 (1): 401–404. Elsevier. https://doi.org/10.1016/j.cirp.2020.03.019.
  • Mokhtari, H., A. Aghaie, J. Rahimi, and A. Mozdgir. 2010. “Project Time–Cost Trade-Off Scheduling: A Hybrid Optimization Approach.” International Journal of Advanced Manufacturing Technology 50 (5–8): 811–822. Springer. https://doi.org/10.1007/s00170-010-2543-4.
  • Morita, D., and H. Suwa. 2015. “A Method of Workload Estimation Directing Schedule Stability in Project Management.” Transactions of the Institute of Systems, Control and Information Engineers 28 (9): 384–391. https://doi.org/10.5687/iscie.28.384.
  • Negri, E., V. Pandhare, L. Cattaneo, J. Singh, M. Macchi, and J. Lee. 2021. “Field-Synchronized Digital Twin Framework for Production Scheduling with Uncertainty.” Journal of Intelligent Manufacturing 32 (4): 1207–1228. Springer. https://doi.org/10.1007/s10845-020-01685-9.
  • Peng, W., and M. Huang. 2014. “A Critical Chain Project Scheduling Method Based on a Differential Evolution Algorithm.” International Journal of Production Research 52 (13): 3940–3949. Taylor & Francis. https://doi.org/10.1080/00207543.2013.865091.
  • Project Management Institute. 2017. A Guide to the Project Management Body of Knowledge. 6th ed. Pennsylvania: Project Management Institute.
  • Roghanian, E., M. Alipour, and M. Rezaei. 2018. “An Improved Fuzzy Critical Chain Approach in Order to Face Uncertainty in Project Scheduling.” International Journal of Construction Management 18 (1): 1–13. Taylor & Francis. https://doi.org/10.1080/15623599.2016.1225327.
  • Rostami, S., S. Creemers, and R. Leus. 2018. “New Strategies for Stochastic Resource-Constrained Project Scheduling.” Journal of Scheduling 21 (3): 349–365. Springer. https://doi.org/10.1007/s10951-016-0505-x.
  • Song, W., D. Kang, J. Zhang, Z. Cao, and H. Xi. 2019. “A Sampling Approach for Proactive Project Scheduling Under Generalized Time-Dependent Workability Uncertainty.” Journal of Artificial Intelligence Research 64 (February): 385–427. https://doi.org/10.1613/jair.1.11369.
  • Suwa, H., and D. Morita. 2016. “Reactive Project Scheduling Method to Enhance Project Progress Under Uncertainty.” Journal of Advanced Mechanical Design Systems and Manufacturing 10 (3): 1–8. https://doi.org/10.1299/jamdsm.2016jamdsm0051.
  • Trietsch, D. 2005. “The Effect of Systemic Errors on Optimal Project Buffers.” International Journal of Project Management 23 (4): 267–274. Elsevier. https://doi.org/10.1016/j.ijproman.2004.12.004.
  • Tukel, O. I., W. O. Rom, and S. Duni Eksioglu. 2006. “An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling.” European Journal of Operational Research 172 (2): 401–416. Elsevier. https://doi.org/10.1016/j.ejor.2004.10.019.
  • Van de Vonder, S., F. Ballestin, E. Demeulemeester, and W. Herroelen. 2007. “Heuristic Procedures for Reactive Project Scheduling.” Computers & Industrial Engineering 52 (1): 11–28. Elsevier. https://doi.org/10.1016/j.cie.2006.10.002.
  • Van de Vonder, S., E. Demeulemeester, and W. Herroelen. 2007. “A Classification of Predictive-Reactive Project Scheduling Procedures.” Journal of Scheduling 10 (3): 195–207. https://doi.org/10.1007/s10951-007-0011-2.
  • Van de Vonder, S., E. Demeulemeester, and W. Herroelen. 2008. “Proactive Heuristic Procedures for Robust Project Scheduling: An Experimental Analysis.” European Journal of Operational Research 189 (3): 723–733. Elsevier. https://doi.org/10.1016/j.ejor.2006.10.061.
  • Van de Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2005. “The Use of Buffers in Project Management: The Trade-Off Between Stability and Makespan.” International Journal of Production Economics 97 (2): 227–240. Elsevier. https://doi.org/10.1016/j.ijpe.2004.08.004.
  • Van de Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2006. “The Trade-Off Between Stability and Makespan in Resource-Constrained Project Scheduling.” International Journal of Production Research 44 (2): 215–236. Taylor & Francis. https://doi.org/10.1080/00207540500140914.
  • Walȩdzik, K., and J. Mańdziuk. 2018. “Applying Hybrid Monte Carlo Tree Search Methods to Risk-Aware Project Scheduling Problem.” Information Sciences 460–461 (August): 450–468. https://doi.org/10.1016/j.ins.2017.08.049.
  • Zhang, J., S. Jia, and E. Diaz. 2015. “A New Buffer Sizing Approach Based on the Uncertainty of Project Activities.” Journal of Concurrent Engineering 23 (1): 3–12. https://doi.org/10.1177/1063293X14561871.
  • Zhou, G., C. Zhang, L. Zhi, K. Ding, and C. Wang. 2020. “Knowledge-Driven Digital Twin Manufacturing Cell Towards Intelligent Manufacturing.” International Journal of Production Research 58 (4): 1034–1051. Taylor & Francis. https://doi.org/10.1080/00207543.2019.1607978.
  • Zhu, G., J. F. Bard, and G. Yu. 2005. “Disruption Management for Resource-Constrained Project Scheduling.” The Journal of the Operational Research Society 56 (4): 365–381. Taylor & Francis. https://doi.org/10.1057/palgrave.jors.2601860.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.