References
- AIMMS. 2021. AIMMS [Internet]. [accessed 2022 Feb 14]. https://www.aimms.com/
- Arora R, Sowlati T, Mortyn J, Roeser D, Griess VC. 2022. Optimization of forest harvest scheduling at the operational level, considering precedence relationship among harvesting activities. Int J for Eng. 34:1–12. doi:10.1080/14942119.2022.2085464.
- Basnet CB, Foulds LR, Wilson JM. 2006. Scheduling contractors’ farm-to-farm crop harvesting operations. Int Trans Oper Res. 13(1):1–15. doi:10.1111/j.1475-3995.2006.00530.x.
- Bredström D, Jönsson P, Rönnqvist M. 2010. Annual planning of harvesting resources in the forest industry. Int Trans Oper Res. 17(2):155–177. doi:10.1111/j.1475-3995.2009.00749.x.
- Corner JL, Foulds LR. 2005. Scheduling the harvesting operations of a forest block: a case study. Asia-Pac J Oper Res. 22(3):377–390. doi:10.1142/S0217595905000674.
- CPLEX. 2021. CPLEX Optimizer | IBM [Internet]. [accessed 2021 Mar 17]. https://www.ibm.com/analytics/cplex-optimizer
- Edwards G, Sørensen CG, Bochtis DD, Munkholm LJ. 2015. Optimised schedules for sequential agricultural operations using a Tabu Search method. Comput Electron Agric. 117:102–113. doi:10.1016/j.compag.2015.07.007.
- Epstein R, Weintraub A, Sapunar P, Nieto E, Sessions JB, Sessions J, Bustamante F, Musante H. 2006. A combinatorial heuristic approach for solving real-size machinery location and road design problems in forestry planning. Oper Res. 54(6):1017–1027. doi:10.1287/opre.1060.0331.
- Frisk M, Flisberg P, Rönnqvist M, Andersson G. 2016. Detailed scheduling of harvest teams and robust use of harvest and transportation resources. Scand J for Res. 31(7):681–690. doi:10.1080/02827581.2016.1206144.
- Girvan J, Taylor R 2020. Can stumpage reform save the BC Interior Forest Industry? Truck Logger BC [Internet]. [accessed 2021 Aug 30]:26–29. https://mydigitalpublication.com/publication/?m=66280&i=707506&p=26&ver=html5
- Guan S, Shikanai T, Nakamura M, Fukami K, Takahashi K. 2018. Practical scheduling problem for sugarcane-farming corporations and its solution. Eng Agric Environ Food. 11(4):211–219. doi:10.1016/j.eaef.2018.07.002.
- Industrial Forestry Services. 2018. A review of aspen/hardwood resources in Northeast British Columbia [Internet]. [accessed 2022 Jul 23]. https://nr.civicweb.net/document/144452/
- Karlsson J, Rönnqvist M, Bergström J. 2003. Short-term harvest planning including scheduling of harvest crews. Int Trans Oper Res. 10(5):413–431. doi:10.1111/1475-3995.00419.
- Kozan E, Liu SQ. 2017. An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. Int J Min Reclam Environ. 31(7):457–474. doi:10.1080/17480930.2016.1160818.
- Legües AD, Ferland JA, Ribeiro CC, Vera JR, Weintraub A. 2007. A tabu search approach for solving a difficult forest harvesting machine location problem. Eur J Oper Res. 179(3):788–805. doi:10.1016/j.ejor.2005.03.071.
- MacDonald JA 1999. Harvesting systems and equipment in British Columbia. FERIC handbook, no. HB-12. [Internet]. Victoria, BC: B.C. Ministry of Forests; [accessed 2021 Aug 30]. https://www.for.gov.bc.ca/hfd/pubs/docs/sil/sil468.htm
- Marques AS, Audy JF, D’amours S, Rönnqvist M. Tactical and operational harvest planning. In: Borges J, Diaz-Balteiro L, McDill M Rodriguez L, editors. The Management of industrial forest plantations: theoretical foundations and applications. Dordrecht: Springer Netherlands; 2014. pp. 239–267. doi:10.1007/978-94-017-8899-1_7.
- Orfanou A, Busato P, Bochtis DD, Edwards G, Pavlou D, Sørensen CG, Berruto R. 2013. Scheduling for machinery fleets in biomass multiple-field operations. Comput Electron Agric. 94:12–19. doi:10.1016/j.compag.2013.03.002.
- Santos PAVH, da Silva ACL, Arce JE, Augustynczik ALD. 2019. A mathematical model for the integrated optimization of harvest and transport scheduling of forest products. Forests. 10(12):1110. doi:https://doi.org/10.3390/F10121110.
- Schiess P, Krogstad F. Forest harvest and transportation. In: Northcote T Hartman G, editors. Fishes and forestry. Oxford UK: Wiley; 2004. pp. 193–215. doi:10.1002/9780470995242.ch10.
- UNECE/FAO. 2021. Forest products market review [Internet]. [accessed 2022 Jul 23]. https://unece.org/sites/default/files/2021-11/2114516E_Inside_Final_web.pdf
- Vera JR, Weintraub A, Koenig M, Bravo G, Guignard M, Barahona F. 2003. A lagrangian relaxation approach for a machinery location problem in forest harvesting. Pesquisa Operacional. 23(1):111–128. doi:10.1590/s0101-74382003000100009.
- Victor V, Cancela H. 2018. Optimizing scheduling and routing of forest harvesting equipment Optimizing scheduling and routing of forest harvesting equipment. In: Brazilian Symposium on Operations Research (SBPO 2018). Rio de Janerio.
- Visser R. 2010. Methodologies for setting timber harvesting (logging) rates. N Z J for. 55(3):10–11.
- Working Forest Staff. 2020. 2019 Global timber & sawmill cost benchmarking report released | the working forest. The Working Forest [Internet]. [accessed 2021 Aug 30]. https://www.workingforest.com/2019-global-timber-sawmill-cost-benchmarking-report-released/