References
- Competitiveness Agenda for British Columbia’s Forest Sector. 2016. [accessed 2023 Jan 24]. https://www2.gov.bc.ca/assets/gov/farming-natural-resources-and-industry/forestry/competitive-forest-industry/print_version_bcfs_agenda_final_lrsingles_r2.pdf
- AIMMS 2021. AIMMS [Internet]. [accessed 2022 Feb 14]. https://www.aimms.com/
- Arora R, Sowlati T, Mortyn J. 2023. Detailed scheduling of forest harvesting at the operational level incorporating decisions on multiple machine assignment. Int J For Eng [Internet]. 1–13. doi: 10.1080/14942119.2023.2185181.
- Arora R, Sowlati T, Mortyn J, Roeser D, Griess VC. 2022. Optimization of forest harvest scheduling at the operational level, considering precedence relationship among harvesting activities. Int J For Eng. 34(1):1–12. doi: 10.1080/14942119.2022.2085464.
- Basnet CB, Foulds LR, Wilson JM. 2006. Scheduling contractors’ farm-to-farm crop harvesting operations. Int T Oper Res. 13(1):1–15. doi: 10.1111/j.1475-3995.2006.00530.x.
- Church M 2018. 2018 Contractor survey: regional view - BC interior - wood business. Wood business [Internet]. [accessed 2021 Aug 30]. https://www.woodbusiness.ca/2018-contractor-survey-regional-view-bc-interior-5292/
- CPLEX 2021. CPLEX optimizer | IBM [internet]. [accessed 2021 Mar 17]. https://www.ibm.com/analytics/cplex-optimizer
- Edwards G, Sørensen CG, Bochtis DD, Munkholm LJ. 2015. Optimised schedules for sequential agricultural operations using a Tabu search method. Comput Electron Agric. 117:102–113. doi:10.1016/j.compag.2015.07.007.
- Epstein R, Weintraub A, Sapunar P, Nieto E, Sessions JB, Sessions J, Bustamante F, Musante H. 2006. A combinatorial heuristic approach for solving real-size machinery location and road design problems in forestry planning. Oper Res. 54(6):1017–1027. doi: 10.1287/opre.1060.0331.
- Forest Economic Advisors. 2020. Central European beetle & windstorm timber disaster report. Forest Economic Advisors [Internet]. [accessed 2023 Jan 24]. https://getfea.com/publication/central-european-beetle-windstorm-timber-disaster
- Frisk M, Flisberg P, Rönnqvist M, Andersson G. 2016. Detailed scheduling of harvest teams and robust use of harvest and transportation resources. Scand J For Res. 31(7):681–690. doi: 10.1080/02827581.2016.1206144.
- German Federal Statistical Office. 2023. [accessed 2023 Jan 24]. https://www.destatis.de/EN/Press/2021/05/PE21_N031_51.html
- Girvan J, Taylor R. 2020. Can stumpage reform save the BC interior forest industry? Truck Logger BC [Internet]. [accessed 2021 Aug 30]:26–29. https://mydigitalpublication.com/publication/?m=66280&i=707506&p=26&ver=html5
- Guan S, Shikanai T, Nakamura M, Fukami K, Takahashi K. 2018. Practical scheduling problem for sugarcane-farming corporations and its solution. Eng In Agric Environ Food. 11(4):211–219. doi: 10.1016/j.eaef.2018.07.002.
- Karlsson J, Rönnqvist M, Bergström J. 2003. Short-term harvest planning including scheduling of harvest crews. Int T Oper Res. 10(5):413–431. doi: 10.1111/1475-3995.00419.
- Legües AD, Ferland JA, Ribeiro CC, Vera JR, Weintraub A. 2007. A tabu search approach for solving a difficult forest harvesting machine location problem. Eur J Oper Res. 179(3):788–805. doi: 10.1016/j.ejor.2005.03.071.
- MacDonald JA. 1999. Harvesting systems and equipment in British Columbia. FERIC handbook, no. HB-12. [Internet]. Victoria, BC: B.C. Ministry of Forests; [accessed 2021 Aug 30]. https://www.for.gov.bc.ca/hfd/pubs/docs/sil/sil468.htm
- Marques AS, Audy JF, D’Amours S, Rönnqvist M. 2014. Tactical and operational harvest planning. In: Borges J, Diaz-Balteiro L, McDill M, and Rodriguez L, editors. The management of industrial forest plantations: theoretical foundations and applications. Dordrecht, Netherlands: Springer; p. 239–267. doi:10.1007/978-94-017-8899-1_7.
- Murray J, Hiesl P, Hagan D, Baldwin R. 2022. Assessing productivity and cost of timber harvesting during longleaf pine ecosystem restoration. Int J For Eng. (2):117–129. doi:10.1080/14942119.2022.2157184.
- Orfanou A, Busato P, Bochtis DD, Edwards G, Pavlou D, Sørensen CG, Berruto R. 2013. Scheduling for machinery fleets in biomass multiple-field operations. Comput Electron Agric. 94:12–19. doi:10.1016/j.compag.2013.03.002.
- Santos PAVH, da Silva ACL, Arce JE, Augustynczik ALD. 2019. A mathematical model for the integrated optimization of harvest and transport scheduling of forest products. Forests. 10(12):1110. doi: 10.3390/F10121110.
- Schiess P, Krogstad F. 2004. Forest harvest and transportation. In: Northcote T, and Hartman G, editors. Fishes and forestry. Oxford, UK: Wiley; p. 193–215. doi:10.1002/9780470995242.ch10.
- Vera JR, Weintraub A, Koenig M, Bravo G, Guignard M, Barahona F. 2003. A Lagrangian relaxation approach for a machinery location problem in forest harvesting. Pesqui Operacional. 23(1):111–128. doi: 10.1590/s0101-74382003000100009.
- Viana V, Cancela H, Rojas LP. 2018. Optimizing scheduling and routing of forest harvesting equipment. Brazilian Symposium on Operations Research (SBPO 2018); August 06–09; Rio De Janerio. https://proceedings.science/sbpo/sbpo-2018/trabalhos/otimizacao-de-agendamento-e-roteamento-de-equipamentos-de-colheita-florestal?lang=pt-br
- Visser R. 2010. Methodologies for setting timber harvesting (logging) rates. New Zealand Journal of Forestry. 55(3):10–11.
- Working Forest Staff. 2020. 2019 Global timber & sawmill cost benchmarking report released | the working forest. The Working Forest [Internet]. [accessed 2021 Aug 30]. https://www.workingforest.com/2019-global-timber-sawmill-cost-benchmarking-report-released/