223
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

Public procurement practice to enhance technology and innovation development in Ethiopian construction industry

, &
Pages 1145-1154 | Received 16 Oct 2022, Accepted 28 Mar 2023, Published online: 10 May 2023

References

  • Acheamfour VK, Adjei-Kumi T, Kissi E. 2023. Contractor selection: a review of qualification and pre-qualification systems. Int J Construct Manage. 23(2):338–348.
  • Adinew BT. 2020. Design management using building information modeling: In case of projects in Addis Ababa [MSc. thesis]. Addis Ababa University.
  • Boadu EF. 2022. A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana [PhD thesis]. Australia: University of New South Wales Sydney.
  • Caerteling JS, Halman J, Song IM, Dorée M, Bij AG, Van Der H. 2013. How relevant is government championing behavior in technology development? J Prod Innov Manag. 30(2):349–363.
  • Chan DWM, Chan APC, Choi TNY. 2010. An empirical survey of the benefits of implementing pay for safety scheme (PFSS) in the Hong Kong construction industry. J Safety Res. 41(5):433–443.
  • Choi S, Jang H, Hyun J. 2009. Correlation between innovation and performance of construction firms. Can J Civ Eng. 36(11):1722–1731.
  • [EC] European Commission. 2021. Commission notice, guidance on innovation procurement. Brussels, 18.6.2021, C(2021) 4320 final.
  • El-Sayegh SM, Basamji M, Haj Ahmad A, Zarif N. 2021. Key contractor selection criteria for green construction projects in the UAE. Int J Construct Manage. 21(12):1240–1250.
  • FDRE. 2009. The Ethiopian Federal Government Procurement and Property Administration Proclamation, Proclamation No.649/2009, p. 4858–4910.
  • [FIDIC] The International Federation of Consulting Engineers. 2011. Procurement procedures guide. 1st ed.
  • [FIDIC] The International Federation of Consulting Engineers. 2017. Conditions of contract for construction: for building and engineering works designed by the employer. 2nd ed.
  • Fong PSW, Choi SKY. 2000. Final contractor selection using the analytical hierarchy process. Construct Manage Econ. 18(5):547–557.
  • [FPPA] Federal Public Procurement and Property Administration Agency. 2011a. Standard bid document for procurement of consultancy services. The Federal Democratic Republic of Ethiopia.
  • [FPPA] Federal Public Procurement and Property Administration Agency. 2011b. Standard bid document for procurement of works. The Federal Democratic Republic of Ethiopia.
  • Gambatese JA, Hallowell M. 2011. Factors that influence the development and diffusion of technical innovations in the construction industry. Construct Manage Econ. 29(5):507–517.
  • Goel A. 2018. Analysing contractor prequalification criteria in construction: new insights through interpretive structural modelling. IJPM. 11(6):667–683.
  • Hair JF, Black WC, Babin BJ, Anderson RE. 2010. Multivariate data analysis. 7th ed. London: Pearson Prentice Hall.
  • Holt G. 2010. Contractor selection innovation: examination of two decades’ published research. Construct Innov. 10(3):304–328.
  • Kebede M. 2021. Assessment of quality management system practices on ISO 9001:2015 certified contractors in Addis Ababa, Ethiopia [MSc. Thesis]. Addis Ababa University. (Issue September).
  • Kulatunga K, Kulatunga U, Amaratunga D, Haigh R. 2011. Client’s championing characteristics that promote construction innovation. Construct Innov. 11(4):380–398.
  • Kumaraswamy MM. 1998. Industry development through creative project packaging and integrated management. Eng, Const and Arch Man. 5(3):228–237.
  • Lenderink B, Halman JIM, Boes H, Voordijk H. 2020. A method to encourage and assess innovations in public tenders for infrastructure and construction projects. CI. 20(2):171–189.
  • Lenderink B, Halman JIM, Boes J, Voordijk H, Dorée AG. 2022. Procurement and innovation risk management: how a public client managed to realize a radical green innovation in a civil engineering project. J Purchasing and Supply Manage. 28(1):100747.
  • Loganathan S, Srinath P, Kumaraswamy M, Kalidindi S, Varghese K. 2017. Identifying and addressing critical issues in the Indian construction industry: Perspectives of large building construction clients. JCDC. 22(suppl. 1):121–144.
  • Love PED, Holt GD, Li H. 2002. Triangulation in construction management research. Engin Construct Architect Manage. 9(4):294–303.
  • Lukhele TM, Botha B, Mbanga S. 2022. Content analysis and ranking of irregularities in public sector construction procurement in South Africa. IJCSCM. 12(1):50–71.
  • McKim CA. 2017. The value of mixed methods research: a mixed methods study. J Mixed Methods Res. 11(2):202–222.
  • Mengesha WJ. 2006. Procurement and contract management, Addis Ababa University Department of Construction Technology and Management. Unpublished Lecture Note.
  • Mengistu DG, Mahesh G. 2020. Challenges in developing the Ethiopian construction industry. Afr J Sci Technol Innov Devel. 12(4):373–384.
  • Miller G, Furneaux C, Davis P, Love P, O’Donnell A. 2009. Built environment procurement practice: impediments to innovation and opportunities for changes. Curtin University of Technology, Australia, Western Australia, Perth.
  • [MoST] Ministry of Science and Technology. 2016a. Cement sector National Technology Roadmap. The Federal Democratic Republic of Ethiopia.
  • [MoST] Ministry of Science and Technology. 2016b. National Technology Roadmap (NTRM) for building sector. The Federal Democratic Republic of Ethiopia.
  • [MoST] Ministry of Science and Technology. 2016c. National Technology Roadmap (NTRM) for road sector. The Federal Democratic Republic of Ethiopia.
  • Motawa IA, Price ADF, Sher W. 1999. Implementing construction innovations. 15th Annual ARCOM Conference, 5–17 September 1999, Liverpool, John Moores University, 1, 65–74.
  • MUDC. 2020. Federal Democratic Republic of Ethiopia, Ministry of Urban Development and Construction sector 10 years plan.
  • MUDC. 2021a. Ministry of Urban Development and Construction, 30 Years Construction Industry Transformation Roadmap.
  • MUDC. 2021b. Ministry of Urban Development and Construction, Construction certification and registration directive, Directive number 648/2021.
  • Mulu YZ. 2018. Construction technology transfer for construction works in Ethiopia- the cases of grade one general contractors [MSc. thesis]. Addis Ababa Science and Technology University.
  • Noktehdan M, Shahbazpour M, Zare MR, Wilkinson S. 2019. Innovation management and construction phases in infrastructure projects. J Constr Eng Manage. 145(2):04018135.
  • [OECD] Organisation for Economic Co-operation and Development. 2016. Preventing corruption in public procurement.
  • [OECD] Organisation for Economic Co-operation and Development. 2017. Public governance reviews, public procurement for innovation: good practices and strategies.
  • Ofori G, Briffett C, Gang G, Ranasinghe M. 2000. Impact of ISO 14000 on construction enterprises in Singapore. Construct Manage Econ. 18(8):935–947.
  • Osei-Tutu E, Owusu-Manu D, Badu E. 2010. Exploring corruption practices in public procurement of infrastructural projects in Ghana. Int J Manag Projects in Business. 3(2):236–256.
  • Ozorhon B, Oral K. 2017. Drivers of innovation in construction projects. J Constr Eng Manage. 143(4):1–9.
  • [PMI] Project Management Institute. 2016. Construction extension: a guide to the Project Management Body of Knowledge (PMBOK® guide). Globalstandard.
  • Seaden G, Manseau A. 2001. Public policy and construction innovation. Build Res Inform. 29(3):182–196.
  • Solomon M. 2018. A framework to enhance the technology transfer for high rise building construction: A case study of commercial bank of Ethiopia head quarter project [MSc. thesis]. Addis Ababa University.
  • Suprun E, Stewart R. 2015. Construction innovation diffusion in the Russian Federation: barriers, drivers and coping strategies. Construct Innov. 15(3):278–312.
  • Tekleyohannes MT. 2022. Building performance simulation in design phase: a case for construction consultants in addis ababa [MSc. thesis]. Addis Ababa University. (Issue May).
  • Tessema MD. 2021. Assessment on selected prefabricated wall construction practices as an alternative materials and technology in the Ethiopian housing sector [MSc. thesis]. Addis Ababa University.
  • Tripathi KK, Jha KN. 2019. An empirical study on factors leading to the success of construction organizations in India. Int J Construct Manage. 19(3):222–239.
  • Uyarra E, Edler J, Garcia-Estevez J, Georghiou L, Yeow J. 2014. Barriers to innovation through public procurement: a supplier perspective. Technovation. 34(10):631–645.
  • Valence Gd. 2010. Innovation, procurement and construction industry development. Construct Econ Build. 10(4):50–59.
  • [WEF] World Economic Forum. 2016. Shaping the future of construction a breakthrough in mindset and technology. Prepared in collaboration with The Boston Consulting Group.
  • Weisheng l, Liu AMM, Hongdi W, Zhongbing W. 2013. Procurement innovation for public construction projects: a study of agent-construction system and public-private partnership in China. Engin Construct Architect Manage. 20(6):543–562.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.