1,017
Views
0
CrossRef citations to date
0
Altmetric
Research Article

A New Approach to Z-number Based Earned Value Management

ORCID Icon &
Pages 361-378 | Received 01 Jun 2021, Accepted 09 Sep 2022, Published online: 15 Dec 2022

References

  • Cleden, D. (2017). Managing project uncertainty. In Managing Project Uncertainty. doi:10.4324/9781315249896
  • Joly M, Lebissonnais J, Muller J-LG. Matrisez le cout de vos projets manuel de coutenance. Paris: Afnor; 1995.
  • Kuchta, D. (2021). Qualitative factors in the fuzzy earned value method. Advances in Intelligent Systems and Computing. doi:10.1007/978-3-030-51156-2_84
  • Fleming, Q. W., & Koppelman, J. M. (1997). Earned value project management. Cost Engineering (Morgantown, West Virginia). doi:10.1016/s0263-7863(97)82251-x
  • Zadeh, L. A. (1978). Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets Syst. doi:10.1016/0165-0114(78)90029-5
  • Abdelazeem, A. S., & Ibrahim, A. H. (2020). Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. Int J Construct Manag, 1–13. doi:10.1080/15623599.2020.1809061
  • Doskocil R. Fuzzy logic: An instrument for the evaluation of project status || La lógica difusa: un instrumento para la evaluación del estado del proyecto. Revista de Métodos Cuantitativos Para La Economía y La Empresa. 2015;19(1):5–23.
  • Eshghi A, Mousavi SM, Mohagheghi V. A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study). Neural Comput Appl. 2019;31(9):5109–5133. doi:10.1007/s00521-018-04002-x.
  • Moradi N, Mousavi SM, Vahdani B. A new version of earned value analysis for mega projects under interval-valued fuzzy environment. J Opt Indust Eng. 2020;13(2):57–72. doi:10.22094/joie.2016.267.
  • Mortaji STH, Bagherpour M, Noori S. Fuzzy earned value management using L-R fuzzy numbers. J Intell Fuzzy Syst. 2013;24(2):323–332. Available from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84873585671&doi=10.3233%2FIFS-2012-0556&partnerID=40&md5=e5ff52d190b2aa35c58f7c71da26b769.
  • Moslemi Naeni L, Salehipour A. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Syst Appl. 2011;38(7):8193–8198. Available from https://www.scopus.com/inward/record.uri?eid=2-s2.0-79952441224&doi=10.1016%2Fj.eswa.2010.12.165&partnerID=40&md5=23b5e58441ffa6e151a2737aea113e97.
  • Naeni LM, Shadrokh S, Salehipour A. A fuzzy approach for the earned value management. Int J Project Manage. 2011;29(6):764–772. Available from https://www.scopus.com/inward/record.uri?eid=2-s2.0-79960069130&doi=10.1016%2Fj.ijproman.2010.07.012&partnerID=40&md5=571aba0a240fa14f808272e8cb4afcc1.
  • Salari M, Bagherpour M, Kamyabniya A. Fuzzy extended earned value management: A novel perspective. Journal of Intelligent and Fuzzy Systems. 2014a;27(3):1393–1406. doi:10.3233/IFS-131106.
  • Zareei, A., Zaerpour, F., Bagherpour, M., Noora, A. A., & Vencheh, A. H. (2011). A new approach for solving fuzzy critical path problem using analysis of events. Expert Syst Appl. doi:10.1016/j.eswa.2010.06.018
  • Zohoori B, Verbraeck A, Bagherpour M, et al. Monitoring production time and cost performance by combining earned value analysis and adaptive fuzzy control. Comput Indus Eng. 2019;127:805–821. Available from https://www.scopus.com/inward/record.uri?eid=2-s2.0-85057290667&doi=10.1016%2Fj.cie.2018.11.019&partnerID=40&md5=9540f90ed455072ffa154b6e83fa9781.
  • Korenkova D. (2020). Fuzzy-interval modification of the earned value method in manufacturing digitalization project management. MATEC Web of Conferences, 311.
  • Kuchta D. Fuzzyfication of the earned value method. WSEAS Trans Syst. 2005;4:12.
  • Lock D. (2013). Project management. Available from http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=504684.
  • Feylizadeh MR, Hendalianpour A, Bagherpour M. A fuzzy neural network to estimate at completion costs of construction projects. Int J Indust Eng Comput. 2012;3(3):477–484.
  • Stanek S, Kuchta D. Increasing earned value analysis efficiency for IT projects. J Decision Syst. 2020: 1–9. doi:10.1080/12460125.2020.1783882.
  • Zadeh, Lotfi A. (2011). A note on Z-numbers. Inf Sci (Ny). doi:10.1016/j.ins.2011.02.022
  • Hendiani S, Bagherpour M, Mahmoudi A, et al. Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment. Comput Indust Eng. 2020;143; doi:10.1016/j.cie.2020.106430.
  • Salari, M., Bagherpour, M., & Wang, J. (2014b). A novel earned value management model using Z-number. Int J Appl Dec Sci. doi:10.1504/IJADS.2014.058037
  • Jaakkola, E. (2020). Designing conceptual articles: four approaches. AMS Rev. doi:10.1007/s13162-020-00161-0
  • Hirschheim R. Some guidelines for the critical reviewing of conceptual papers: some guidelines for the critical reviewing of conceptual papers overview of the IS research perspectives section. J Assoc Inform Syst. 2008.
  • Chaos Report. (2015). Available from https://www.standishgroup.com/sample_research_files/CHAOSReport2015-Final.pdf.
  • Kerzner H. Project management: A systems approach to planning, scheduling, and controlling. New York (NY): John Wiley & Sons, Inc; 2005.
  • Carvalho M. Risk and uncertainty in projects management: literature review and conceptual framework RECEBIDO. GEPROS. Gestão Da Produção, Operações e Sistemas. 2017;12:93–120. doi:10.15675/gepros.v12i2.1637.
  • Kerzner H. (2013). Project Management Metrics, KPIs, and Dashboards: KERZNER: PROJECT MANAGEMENT METRICS, KPIS, AND DASHBOARDS.
  • Larson, E. W., & Gray, C. F. (2011). Project management: The managerial process. McGraw-Hill Irwin International Edition, NY.
  • Basiura, B., Duda, J., Gaweł, B., Opiła, J., Pełech-Pilichowski, T., Rębiasz, B., & Skalna, I. (2015). Ordering of fuzzy numbers BT - advances in fuzzy decision making: theory and practice (I. Skalna, B. Rębiasz, B. Gaweł, B. Basiura, J. Duda, J. Opiła, & T. Pełech-Pilichowski, editors). doi:10.1007/978-3-319-26494-3_2
  • Kang B, Wei D, Li Y, et al. A method of converting Z-number to classical fuzzy number. Journal of Inform Comput Sci. 2012;9:703–709.
  • Bohlender, G., Kaufmann, A., & Gupta, M. M. (1986). Introduction to fuzzy arithmetic, theory and applications. Math Comput. doi:10.2307/2008199
  • Van Leekwijck, W., & Kerre, E. E. (1999). Defuzzification: criteria and classification. Fuzzy Sets Syst. doi:10.1016/s0165-0114(97)00337-0
  • Fleming Q, Koppelman J. (2000). Earned Value Project Management (Vol. 39).
  • Kuchta, D., & Zabor, A. (2021). Fuzzy uncertainty modelling in cost and cash flow forecasting in project. In Advances in intelligent systems and computing. doi:10.1007/978-3-030-51156-2_141
  • Zadeh, L. A. (1965). Fuzzy sets. Inf Control. doi:10.1016/S0019-9958(65)90241-X
  • Dałkowski TB, Kuchta D. Klasyczna i zmodyfikowana metoda earned value w zarządzaniu projektami. Badania Operacyjne i Decyzje. 2001;3/4:35–52.
  • Ponz-Tienda J, Pellicer E, Yepes V. Complete fuzzy scheduling and fuzzy earned value management in construction projects. Journal of Zhejiang University SCIENCE A. 2012;13; doi:10.1631/jzus.A1100160.