593
Views
1
CrossRef citations to date
0
Altmetric
Articles

How to front the physical distancing requirement within workforce scheduling: empirical investigation through an optimization model

, & ORCID Icon
Pages 546-568 | Received 28 Sep 2021, Accepted 28 Jun 2022, Published online: 19 Jul 2022

References

  • Ahmed, F., Zviedrite, N., & Uzicanin, A. (2018). Effectiveness of workplace social distancing measures in reducing influenza transmission: A systematic review. BMC Public Health, 18(1), 1–13.https://doi.org/10.1186/s12889-018-5446-1
  • Alfares, H. K., Bailey, J. E., & Lin, W. Y. (1999). Integrated project operations and personnel scheduling with multiple labour classes. Production Planning and Control, 10(6), 570–578. https://doi.org/10.1080/095372899232867
  • Algethami, R. L. P., & Landa-Silva, D. (2019). A genetic algorithm for a workforce scheduling and routing problem. IEEE Congress on Evolutionary Computation (CEC) (pp. 927–934). https://doi.org/10.1109/CEC.2016.7743889.
  • Ammar, A., & Elkosantin, S. (2013). Worker assignment problems in manufacturing systems: A literature analysis. International Conference on Industrial Engineering and Systems Management (IESM), 1(7), 1–7. https://ieeexplore.ieee.org/abstract/document/6761486.
  • Armenta, J. M. L., Josafat, R. C., Macam, F. J. L., Minas, C., Austin, T., & Cabal, E. M. (2022). Perception of Employees in the Implementation of a Safe Workplace in the Municipal Offices of a Local Government in Zambales. 6(4), 18–23.
  • Aroui, K., Alpan, G., & Frein, Y. (2017). Minimising work overload in mixed-model assembly lines with different types of operators: A case study from the truck industry. International Journal of Production Research, 55(21), 1–22. https://doi.org/10.1080/00207543.2017.1346313
  • Battaia, O., & Dolgui, A. (2012). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142(2), 259–277. https://doi.org/10.1016/j.ijpe.2012.10.020
  • Cagliano, R., Caniato, F., Longoni, A., & Spina, G. (2014). Alternative uses of temporary work and new forms of work organisation. Production Planning and Control, 25(9), 762–782. https://doi.org/10.1080/09537287.2012.750387
  • Chircop, K., & Zammit-Mangion, D. (2013). On epsilon-constraint based methods for the generation of pareto frontiers. David Publishing.
  • Costa, A., Fichera, S., & Cappadona, F. A. (2013). A genetic algorithm for scheduling both jobs families and skilled workforce. International Journal of Operations and Quantitative Management, 19(4), 221–247.
  • Cristani, M., Del Bue, A., Murino, V., Setti, F., & Vinciarelli, A. (2020). The visual social distancing problem. IEEE Access, 8, 126876–126886. https://doi.org/10.1109/ACCESS.2020.3008370
  • Dolgui, A., & Proth, J. M. (2010). Supply chain engineering: Useful methods and techniques (Vol. 539). Springer.
  • Felan, J. T., & Fry, T. D. (2001). Multi-level heterogeneous worker flexibility in a dual resource constrained (DRC) job-shop. International Journal of Production Research, 39(14), 3041–3059. https://doi.org/10.1080/00207540110047702
  • Gebennini, E., Zeppetella, L., Grassi, A., & Rimini, B. (2016). Minimizing operators’ walking times into a linear system layout. IFAC-PapersOnLine, 49(12), 1709–1714. https://doi.org/10.1016/j.ifacol.2016.07.828
  • Golbabaei, F., & Kalantari, S. (2020). A review of the strategies and policies for the prevention and control of the COVID-19 at workplaces. International Journal of Occupational Hygiene, 12(1), 60–65.
  • Güner, H. R., Hasanoğlu, İ., & Aktaş, F. (2020). COVID-19: Prevention and control measures in community. Turkish Journal of Medical Sciences, 50(SI–1), 571–577. https://doi.org/10.3906/sag-2004-146
  • Haimes, Y. Y., Lasdon, L. S., & Wismer, D. A. (1971). On a bicriterion formulation of the problems of integrated system identification and system optimization. IEEE Transactions on Systems, Man, and Cybernetics, 1(3), 296–297 https://doi.org/10.1109/TSMC.1971.4308298.
  • Huremovic, D. (2019). Psychiatry of Pandemics. Springer International Publishing.
  • Islam, N., Sharp, S. J., Chowell, G., Shabnam, S., Kawachi, I., Lacey, B., Massaro, J. M., D’Agostino, R. B., & White, M. (2020). Physical distancing interventions and incidence of coronavirus disease 2019: Natural experiment in 149 countries. British Medical Journal, 370. https://doi.org/10.1136/bmj.m2743
  • Kim, E. A. (2020). Social distancing and public health guidelines at workplaces in Korea: Responses to coronavirus Disease-19. Safety and Health at Work, 11(3), 275–283. https://doi.org/10.1016/j.shaw.2020.07.006
  • Lagodimos, A. G., & Paravantis, J. A. (2006). Improved heuristic for manpower shift planning with modified shift priorities. Production Planning and Control, 17(3), 301–310. https://doi.org/10.1080/09537280500285631
  • Moussavi, S. E., Zare, M., Mahdjoub, M., & Grunder, O. (2019). Balancing high operator's workload through a new job rotation approach: Application to an automotive assembly line. International Journal of Industrial Ergonomics, 71, 136 144.
  • Moussavi, S. E., Zare, M., Grunder, O., & Mahdjoub, M. (2019). Balancing high operator’s workload through a new job rotation approach: Application to an automotive assembly line. International Journal of Industrial Ergonomics, 71, 136–144. https://doi.org/10.1016/j.ergon.2019.03.003
  • Nakade, K., & Nishiwaki, R. (2008). Optimal allocation of heterogeneous workers in a U- shaped production line. Journal of Computers and Industrial Engineering, 54(3), 432–440. https://doi.org/10.1016/j.cie.2007.08.007
  • Niemi, E. (2009). Worker allocation in make-to-order assembly cells. Robotics and Computer Integrated Manufacturing, 25(6), 932–936. https://doi.org/10.1016/j.rcim.2009.04.008
  • Othman, M., Bhuiyan, N., & Gouw, G. J. (2012). Integrating workers’ differences into workforce planning. Computers & Industrial Engineering, 63(4), 1096–1106. https://doi.org/10.1016/j.cie.2012.06.015
  • Qu, S., Wang, J., Govil, S., & Leckie, J. O. (2016). Optimized adaptive scheduling of a manufacturing process system with multi-skill workforce and multiple machine types: An ontology-based, multi-agent reinforcement learning approach. 9th CIRP Conference on Manufacturing Systems - Procedia CIRP 57, 55–60. https://doi.org/10.1016/j.procir.2016.11.011.
  • Safaei, N., Banjevic, D., & Jardine, A. K. S. (2009). Multi-objective maintenance workforce scheduling in a steel company. IFAC Proceedings, 42(4), 1049–1054. https://doi.org/10.3182/20090603-3-RU-2001.0106.
  • Savino, M. M., & Neubert, G. (2009). Flow shop operator scheduling through constraint satisfaction and constraint optimization techniques. International Journal of Productivity and Quality Management, 4(5), 549–568. https://doi.org/10.1504/IJPQM.2009.025185
  • Savino, M. M., Brun, A., & Mazza, A. (2014). Dynamic workforce allocation in a constrained flow shop with multi-agent system. Computers in Industry, 65(6), 967–975. https://doi.org/10.1016/j.compind.2014.02.016
  • Savino, M. M., Riccio, C., & Menanno, M. (2019). Empirical study to explore the impact of ergonomics on workforce scheduling. International Journal of Production Research, 58(2), 415–433. https://doi.org/10.1080/00207543.2019.1591645
  • Sennott, L. I., Van Oyen, M. P., & Iravani, S. M. R. (2006). Optimal dynamic assignment of a flexible worker on an open production line with specialists. European Journal of Operational Research, 170(2), 541–566. https://doi.org/10.1016/j.ejor.2004.06.030
  • Setti, L., Passarini, F., De Gennaro, G., Barbieri, P., Perrone, M. G., Borelli, M., Palmisani, J., Di Gilio, A., Piscitelli, P., & Alessandro Miani, A. (2020). Airborne transmission route of COVID-19: Why 2 meters/6 feet of inter-personal distance could not be enough. International Journal of Environmental Research and Public Health, 17(8), 2932. https://doi.org/10.3390/ijerph17082932
  • Singh Arora, J. (2017). Introduction to optimum design (Fourth ed.). Elsevier.
  • Sirovetnukul, R., & Chutima, P. (2010). The impact of walking time on U-shaped assembly line worker allocation problems. Engineering Journal, 14(2), 53–78. https://doi.org/10.4186/ej.2010.14.2.53
  • Sun, C., & Zhai, Z. (2020). The efficacy of social distance and ventilation effectiveness in preventing COVID-19 transmission. Sustainable Cities and Society, 62, 102390. https://doi.org/10.1016/j.scs.2020.102390
  • Techawiboonwong, A., & Yenradee, P. (2003). Aggregate production planning with workforce transferring plan for multiple product types. Production Planning and Control, 14(5), 447–458. https://doi.org/10.1080/09537280310001597343
  • Techawiboonwong, A., Yenradeea, P., & Dasb, S. K. (2006). A master scheduling model with skilled and unskilled temporary workers. International Journal of Production Economics, 103(2), 798–809. https://doi.org/10.1016/j.ijpe.2005.11.009
  • Teslya, A., Pham, T. M., Godijk, G. N., Kretzschmar, M. E., Bootsma, M. C. J., Rozhnova, G., & Guo, Y. (2020). Impact of self-imposed prevention measures and short-term government-imposed social distancing on mitigating and delaying a COVID-19 epidemic: A modelling study. PLoS Medicine, 17(7), e1003166. https://doi.org/10.1371/journal.pmed.1003166
  • Thompson, G. M., & Goodaleb, J. C. (2006). Variable employee productivity in workforce scheduling. European Journal of Operational Research, 170(2), 376–390. https://doi.org/10.1016/j.ejor.2004.03.048
  • Visentin, V., Sgarbossa, F., Calzavara, M., & Persona, A. (2018). Fatigue accumulation in the assignment of manual material handling activities to operators. IFAC-PapersOnLine, 51(11), 826–831. https://doi.org/10.1016/j.ifacol.2018.08.441
  • Wang, Q., Lassalle, S., Mileham, A. R., & Owen, G. W. (2009). Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches. Journal of Manufacturing Systems, 28(2–3), 64–70. https://doi.org/10.1016/j.jmsy.2009.12.001
  • Wang, S., & McLaren, J. (2020). Effects of reduced workplace presence on COVID-19 deaths: An instrumental-variables approach. National Bureau of Economic Research.
  • Xu, J., Xu, S., & Xie, S. Q. (2015). Recent developments in Dual Resource Constrained (DRC) system research. European Journal of Operational Research, 215(2), 309–318. https://doi.org/10.1016/j.ejor.2011.03.004