311
Views
15
CrossRef citations to date
0
Altmetric
Research Article

An integrated reliable four-level supply chain with multi-stage products under shortage and stochastic constraints

, &
Article: 1958023 | Received 15 Mar 2021, Accepted 15 Jul 2021, Published online: 11 Aug 2021

References

  • Alfalla-Luque, R., Marin-Garcia, J. A., & Medina-Lopez, C. (2015). An analysis of the direct and mediated effects of employee commitment and supply chain integration on organisational performance. International Journal of Production Economics, 162, 242–257. https://doi.org/10.1016/j.ijpe.2014.07.004
  • Amjadian, A., & Gharaei, A. (2021). An integrated reliable five-level closed-loop supply chain with multi-stage products under quality control and Green policies: Generalised outer approximation with exact penalty. International Journal of Systems Science: Operations & Logistics, 1–21. https://doi.org/10.1080/23302674.2021.1919336
  • Aryanezhad, M. B., Jabbarzadeh, A., & Zareei, A. (2009, December). Combination of genetic algorithm and LP-metric to solve single machine bi-criteria scheduling problem. In 2009 IEEE international conference on industrial engineering and engineering management (pp. 1915–1919). IEEE.
  • Azadeh, A., Shafiee, F., Yazdanparast, R., Heydari, J., & Fathabad, A. M. (2017). Evolutionary multi-objective optimization of environmental indicators of integrated crude oil supply chain under uncertainty. Journal of Cleaner Production, 152, 295–311.
  • Bilir, C., Ekici, S. O., & Ulengin, F. (2017). An integrated multi-objective supply chain network and competitive facility location model. Computers and Industrial Engineering, 108, 136–148.
  • Boukherroub, T., Lebel, L., & Lemieux, S. (2017). An integrated wood pellet supply chain development: Selecting among feedstock sources and a range of operating scales. Applied Energy, 198, 385–400.
  • Chakraborty, D., Jana, D. K., & Roy, T. K. (2015). Multi-item integrated supply chain model for deteriorating items with stock dependent demand under fuzzy random and bifuzzy environments. Computers and Industrial Engineering, 88, 166–180.
  • Christopher, M., Peck, H., & Towill, D. (2006). A taxonomy for selecting global supply chain strategies. The International Journal of Logistics Management, 17(2), 277–287. https://doi.org/10.1108/09574090610689998
  • Cui, J., Zhao, M., Li, X., Parsafard, M., & An, S. (2016). Reliable design of an integrated supply chain with expedited shipments under disruption risks. Transportation Research Part E: Logistics and Transportation Review, 95, 143–163.
  • Danese, P., & Romano, P. (2011). Supply chain integration and efficiency performance: A study on the interactions between customer and supplier integration. Supply Chain Management: An International Journal, 16(4), 220–230. https://doi.org/10.1108/13598541111139044
  • Das, B. C., Das, B., & Mondal, S. K. (2013). Integrated supply chain model for a deteriorating item with procurement cost dependent credit period. Computers & Industrial Engineering, 64(3), 788–796. https://doi.org/10.1016/j.cie.2012.12.020
  • Duan, C., Deng, C., Gharaei, A., Wu, J., & Wang, B. (2018). Selective maintenance scheduling under stochastic maintenance quality with multiple maintenance actions. International Journal of Production Research, 56(23), 7160–7178. https://doi.org/10.1080/00207543.2018.1436789
  • Ensafian, H., Yaghoubi, S., & Yazdi, M. M. (2017). Raising quality and safety of platelet transfusion services in a patient-based integrated supply chain under uncertainty. Computers and Chemical Engineering, 106, 355–372.
  • Fu, Y. C., & Yeh, C. W. (2017). An integrated producer–buyer supply chain with delivery cost under stochastic transportation time. Applied Mathematical Modelling, 44, 676–687.
  • Gharaei, A., Hoseini Shekarabi, S. A., & Karimi, M. (2020). Modelling and optimal lot-sizing of the replenishments in constrained, multi-product and bi-objective EPQ models with defective products: Generalised cross decomposition. International Journal of Systems Science: Operations & Logistics, 7(3), 262–274. https://doi.org/10.1080/23302674.2019.1574364
  • Gharaei, A., Hoseini Shekarabi, S. A., Karimi, M., Pourjavad, E., & Amjadian, A. (2019a). An integrated stochastic EPQ model under quality and Green policies: Generalised cross decomposition under the separability approach. International Journal of Systems Science: Operations & Logistics, 1–13. https://doi.org/10.1080/23302674.2019.1656296
  • Gharaei, A., Karimi, M., & Hoseini Shekarabi, S. A. (2019b). Joint economic lot-sizing in multi-product multi-level integrated supply chains: Generalized benders decomposition. International Journal of Systems Science: Operations & Logistics, 7(4), 309–325. https://doi.org/10.1080/23302674.2019.1585595
  • Gharaei, A., Karimi, M., & Hoseini Shekarabi S. A. (2019c). An integrated multi-product, multi-buyer supply chain under penalty, Green, and quality control polices and a vendor managed inventory with consignment stock agreement: The outer approximation with equality relaxation and augmented penalty algorithm. Applied Mathematical Modelling, 69, 223–254. https://doi.org/10.1016/j.apm.2018.11.035
  • Gharaei, A., Naderi, B., & Mohammadi, M. (2015). Optimization of rewards in single machine scheduling in the rewards-driven systems. Management Science Letters, 5(6), 629–638. https://doi.org/10.5267/j.msl.2015.4.002
  • Ghorui, N., Ghosh, A., Algehyne, E. A., Mondal, S. P., & Saha, A. K. (2020). AHP-TOPSIS inspired shopping mall site selection problem with fuzzy data. Mathematics, 8(8), 1380. https://doi.org/10.3390/math8081380
  • Ghosh, A., Ghorui, N., Mondal, S. P., Kumari, S., Mondal, B. K., Das, A., & Gupta, M. S. (2021). Application of hexagonal fuzzy MCDM methodology for site selection of electric vehicle charging station. Mathematics, 9(4), 393. https://doi.org/10.3390/math9040393
  • Glavic, M. (2004). Interior point methods: A survey, short survey of applications to power systems, and research opportunities. University of Liege.
  • Hoetker, G., Swaminathan, A., & Mitchell, W. (2007). Modularity and the impact of buyer–supplier relationships on the survival of suppliers. Management Science, 53(2), 178–191. https://doi.org/10.1287/mnsc.1060.0630
  • Hoseini Shekarabi, S. A., Gharaei, A., & Karimi, M. (2019). Modelling and optimal lot-sizing of integrated multi-level multi-wholesaler supply chains under the shortage and limited warehouse space: Generalised outer approximation. International Journal of Systems Science: Operations & Logistics, 6(3), 237–257. https://doi.org/10.1080/23302674.2018.1435835
  • Hsiao, Y. C. (2008). Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. International Journal of Production Economics, 115(1), 229–235. https://doi.org/10.1016/j.ijpe.2008.06.004
  • Jespersen, B. D., & Skjott-Larsen, T. (2005). Supply chain management: In theory and practice. Copenhagen Business School Press DK.
  • Jiao, Z., Ran, L., Zhang, Y., Li, Z., & Zhang, W. (2018). Data-driven approaches to integrated closed-loop sustainable supply chain design under multiuncertainties. Journal of Cleaner Production.
  • Kahn, K. A., & Mentzer, J. T. (1998). Marketing’s integration with other departments. Journal of Business Research, 42(1), 53–62. https://doi.org/10.1016/S0148-2963(97)00068-4
  • Khalifehzadeh, S., Seifbarghy, M., & Naderi, B. (2015). A four-echelon supply chain network design with shortage: Mathematical modeling and solution methods. Journal of Manufacturing Systems, 35, 164–175. https://doi.org/10.1016/j.jmsy.2014.12.002
  • Khan, M., Jaber, M. Y., & Ahmad, A. R. (2014). An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42(1), 16–24. https://doi.org/10.1016/j.omega.2013.02.002
  • Lambert, D. M. (2008). An executive summary of supply chain management: Processes. Partnerships, performance. Supply Chain Management Institute.
  • Mangoni, D., Tasora, A., & Garziera, R. (2018). A primal–dual predictor–corrector interior point method for non-smooth contact dynamics. Computer Methods in Applied Mechanics and Engineering, 330, 351–367. https://doi.org/10.1016/j.cma.2017.10.030
  • Mazdeh, M. M., Zaerpour, F., Zareei, A., & Hajinezhad, A. (2010). Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs. Applied Mathematical Modelling, 34(6), 1498–1510. https://doi.org/10.1016/j.apm.2009.08.023
  • Mohammadi, A., Abbasi, A., Alimohammadlou, M., Eghtesadifard, M., & Khalifeh, M. (2017). Optimal design of a multi-echelon supply chain in a system thinking framework: An integrated financial-operational approach. Computers and Industrial Engineering, 114, 297–315.
  • Najmi, A., Shakouri, H., & Nazari, S. (2016). An integrated supply chain: A large scale complementarity model for the biofuel markets. Biomass and Bioenergy, 86, 88–104.
  • Narasimhan, R., & Jayaram, J. (1998). Causal linkages in supply chain management: An exploratory study of north American manufacturing firms. Decision Sciences, 29(3), 579–605. https://doi.org/10.1111/j.1540-5915.1998.tb01355.x
  • Nasab, N. M., & Amin-Naseri, M. R. (2016). Designing an integrated model for a multi-period, multi-echelon and multi-product petroleum supply chain. Energy, 114, 708–733.
  • Pagell, M. (2004). Understanding the factors that enable and inhibit the integration of operations, purchasing and logistics. Journal of Operations Management, 22(5), 459–487. https://doi.org/10.1016/j.jom.2004.05.008
  • Pasandideh, S. H. R., Niaki, S. T. A., & Gharaei, A. (2015). Optimization of a multiproduct economic production quantity problem with stochastic constraints using sequential quadratic programming. Knowledge-Based Systems, 84, 98–107. https://doi.org/10.1016/j.knosys.2015.04.001
  • Paulo, H., Barbosa-Póvoa, A. P. F., & Relvas, S. (2013). Modeling integrated biorefinery supply chains. Computer aided chemical Engineering, 32, 79–84. https://doi.org/10.1016/B978-0-444-63234-0.50014-2
  • Pedram, A., Yusoff, N. B., Udoncy, O. E., Mahat, A. B., Pedram, P., & Babalola, A. (2017). Integrated forward and reverse supply chain: A tire case study. Waste Management, 60, 460–470.
  • Potra, F. A., & Wright, S. J. (2000). Interior-point methods. Journal of Computational and Applied Mathematics, 124(1-2), 281–302. https://doi.org/10.1016/S0377-0427(00)00433-7
  • Power, D. (2005). Supply chain management integration and implementation: A literature review. Supply Chain Management, 10(4), 252–263. https://doi.org/10.1108/13598540510612721
  • Rahaman, M., Mondal, S. P., Alam, S., & Goswami, A. (2021). Synergetic study of inventory management problem in uncertain environment based on memory and learning effects. Sādhanā, 46(1), 1–20. https://doi.org/10.1007/s12046-021-01562-y
  • Rahaman, M., Mondal, S. P., Shaikh, A. A., Pramanik, P., Roy, S., Maiti, M. K., … De, D. (2020). Artificial bee colony optimization-inspired synergetic study of fractional-order economic production quantity model. Soft Computing, 24(20), 15341–15359. https://doi.org/10.1007/s00500-020-04867-y
  • Rosenzweig, E. D., Roth, A. V., & Dean Jr, J. W. (2003). The influence of an integration strategy on competitive capabilities and business performance: An exploratory study of consumer products manufacturers. Journal of Operations Management, 21(4), 437–456. https://doi.org/10.1016/S0272-6963(03)00037-8
  • Samani, M. R. G., Torabi, S. A., & Hosseini-Motlagh, S. M. (2018). Integrated blood supply chain planning for disaster relief. International Journal of Disaster Risk Reduction, 27, 168–188.
  • Sheu, J. B. (2003). Locating manufacturing and distribution centers: An integrated supply chain-based spatial interaction approach. Transportation Research Part E: Logistics and Transportation Review, 39(5), 381–397. https://doi.org/10.1016/S1366-5545(03)00018-8
  • Suzanne, E., Absi, N., Borodin, V., & Heuvel, W. (2020). A single-item lot-sizing problem with a by-product and inventory capacities. European Journal of Operational Research, 287(3), 844–855.
  • Vickery, S. K., Jayaram, J., Droge, C., & Calantone, R. (2003). The effects of an integrative supply chain strategy on customer service and financial performance: An analysis of direct versus indirect relationships. Journal of Operations Management, 21(5), 523–539. https://doi.org/10.1016/j.jom.2003.02.002
  • Wook Kim, S. (2006). Effects of supply chain management practices, integration and competition capability on performance. Supply Chain Management, 11(3), 241–248. https://doi.org/10.1108/13598540610662149
  • Yao, M. J., & Chiou, C. C. (2004). On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers. European Journal of Operational Research, 159(2), 406–419. https://doi.org/10.1016/j.ejor.2003.08.024
  • Yu, J., Mungan, D., & Sarker, B. R. (2011). An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease. Computers & Industrial Engineering, 61(1), 118–130. https://doi.org/10.1016/j.cie.2011.03.002
  • Zahiri, B., Zhuang, J., & Mohammadi, M. (2017). Toward an integrated sustainable-resilient supply chain: A pharmaceutical case study. Transportation Research Part E: Logistics and Transportation Review, 103, 109–142.
  • Zhao, S. T., Wu, K., & Yuan, X. M. (2016). Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demand. European Journal of Operational Research, 255(2), 364–379.
  • Zhu, Z. (2005). An efficient sequential quadratic programming algorithm for nonlinear programming. Journal of Computational and Applied Mathematics, 175(2), 447–464. https://doi.org/10.1016/j.cam.2004.07.001

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.