284
Views
3
CrossRef citations to date
0
Altmetric
Research Article

The return and remanufacturing rates in a multi-stage green supply chain system with rework, variable shipping cost and ordering cost reduction

& ORCID Icon
Article: 2113174 | Received 07 Jan 2022, Accepted 09 Aug 2022, Published online: 24 Aug 2022

References

  • Arkan, A., & Hejazi, S. R. (2012). Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Computers and Industrial Engineering, 62(1), 56–69. https://doi.org/10.1016/j.cie.2011.08.016
  • Cardenas-Barron, L. E. (2009). On optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 196(3), 1238–1244. https://doi.org/10.1016/j.ejor.2008.04.015
  • Chan, W. M., Ibrahim, R. N., & Lochert, P. B. (2003). A new EOQ model: Integrating lower pricing, rework and reject situations. Production Planning and Control, 14(7), 588–595. https://doi.org/10.1080/09537280310001626179
  • Chang, H.-C., Ouyang, L.-Y., Wu, K.-S., & Ho, C.-H. (2006). Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170(2), 481–495. https://doi.org/10.1016/j.ejor.2004.06.029
  • Chiu, Y. S. P., Lin, H., & Cheng, F. (2006). Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. Proceedings of the Institution of Mechanical Engineers. Part B. Journal of Engineering Manufacture, 220(9), 1559–1563. https://doi.org/10.1243/09544054JEM308
  • Choi, D. W., Hwang, H., & Koh, S. G. (2007). A generalized ordering and recovery policy for reusable items. European Journal of Operational Research, 182(2), 764–774. https://doi.org/10.1016/j.ejor.2006.08.048
  • Das Roy, M. (2020a). Combine effect of quality, setup and ordering cost control in a three-stage multi-item supply chain model with transportation discounts. The International Journal of Analytical and Experimental Modal Analysis, XII(VI), 470–479.
  • Das Roy, M. (2020b). Lead-time dependent ordering cost reduction and trade-credit: A supply chain model with stochastic demand and rework. International Journal of Recent Technology and Engineering, 8(5), 1–5. https://doi.org/10.46564/ijraet.2020.v08i05.001
  • Das Roy, M., & Sana, S. (2017). Random sales price-sensitive stochastic demand: An imperfect production model with free repair warranty. Journal of Advancesin Management Research, 14(4), 408–424. https://doi.org/10.1108/JAMR-10-2016-0086
  • Das Roy, M., & Sana, S. (2021a). Inter-dependent lead-time and ordering cost reduction strategy - a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand. Opsearch, 58(3), 690–710. https://doi.org/10.1007/s12597-020-00499-w
  • Das Roy, M., & Sana, S. (2021b). Production rate and lot size-dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing. RAIRO Operations Research, 55, S1469–S1485. https://doi.org/10.1051/ro/2020112
  • Das Roy, M., Sana, S., & Chaudhuri, K. (2011a). An economic order quantity model of imperfect quality items with partial backlogging. International Journal of Systems Science, 42(8), 1409–1419. https://doi.org/10.1080/00207720903576498
  • Das Roy, M., Sana, S., & Chaudhuri, K. (2011b). An optimal shipment strategy for imperfect items in a stock-out situation. Mathematical and Computer Modelling, 54(9-10), 2528–2543. https://doi.org/10.1016/j.mcm.2011.06.015
  • Das Roy, M., Sana, S., & Chaudhuri, K. (2012). An integrated producer - buyer relationship in the environment of EMQ and JIT production systems. International Journal of Production Research, 50(19), 5597–5614. https://doi.org/10.1080/00207543.2011.650866
  • Das Roy, M., Sana, S., & Chaudhuri, K. (2014). An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA Journal of Management Mathematics, 25(2), 159–183. https://doi.org/10.1093/imaman/dpt001
  • Das Roy, M., & Sana, S. S. (2021c). Multi-echelon green supply chain model with random defectives, remanufacturing and rework under setup cost reduction and variable transportation cost. Sādhanā, 46(4), 1–18. https://doi.org/10.1007/s12046-021-01716-y
  • Das Roy, M., Sana, S. S., & Chaudhuri, K. S. (2011c). An EOQ model for imperfect quality products with partial backlogging - a comparative study. International Journal of Services and Operations Management, 9(1), 83–110.
  • Das Roy, M., & Sarker, B. R. (2021). Optimizing a supply chain problem with nonlinear penalty costs for early and late delivery under generalized lead time distribution. Computers & Industrial Engineering, 160, 107536. https://doi.org/10.1016/j.cie.2021.107536
  • El Saadany, A. M. A., & Jaber, M. Y. (2010). A production/remanufacturing inventory model with price and quality dependant return rate. Computers & Industrial Engineering, 58(3), 352–362. https://doi.org/10.1016/j.cie.2009.01.017
  • Feng, Y., & Viswanathan, S. (2014). Heuristics with guaranteed performance bounds for a manufacturing system with product recovery. European Journal of Operational Research, 232(2), 322–329. https://doi.org/10.1016/j.ejor.2013.07.006
  • Hasanov, P., Jaber, M. Y., & Zolfaghari, S. (2012). Production, remanufacturing and waste disposal models for the cases of a pure and partial backorder. Applied Mathematical Modelling, 36(11), 5249–5261. https://doi.org/10.1016/j.apm.2011.11.066
  • Hemapriya, S., & Uthayakumar, R. (2016). Ordering cost dependent lead time in integrated inventory model. Communications in Applied Analysis, 20(3), 411–439.
  • Hsueh, C.-F. (2011). An inventory control model with consideration of remanufacturing and product life cycle. International Journal of Production Economics, 133(2), 645–652. https://doi.org/10.1016/j.ijpe.2011.05.007
  • Jaber, M. Y., & El Saadany, A. M. A. (2011). An economic production and remanufacturing model with learning effects. International Journal of Production Economics, 131(1), 115–127. https://doi.org/10.1016/j.ijpe.2009.04.019
  • Jaber, M. Y., & Rosen, M. A. (2008). The economic order quantity repair and waste disposal model with entropy cost. European Journal of Operational Research, 188(1), 109–120. https://doi.org/10.1016/j.ejor.2007.03.016
  • Jauhari, W. A., & Wangsa, I. D. (2022). A manufacturer-retailer inventory model with remanufacturing, stochastic demand, and green investments. Process Integration and Optimization for Sustainability, 6(2), 253–273. https://doi.org/10.1007/s41660-021-00208-0
  • Khara, B., Dey, J. K., & Mondal, S. K. (2020). Sustainable recycling in an imperfect production system with acceptance quality level dependent development cost and demand. Computers & Industrial Engineering, 142, 106300. https://doi.org/10.1016/j.cie.2020.106300
  • Kiesmuller, G. P. (2003). A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different lead-times. European Journal of Operational Research, 147(1), 62–71. https://doi.org/10.1016/S0377-2217(02)00351-X
  • Kiesmuller, G. P., & van der Laan, E. (2001). An inventory model with dependent ¨ product demands and returns. International Journal of Production Economics, 72(1), 73–87. https://doi.org/10.1016/S0925-5273(00)00080-3
  • Kim, M., & Sarkar, B. (2017a). Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. Journal of Cleaner Production, 144, 572–590. https://doi.org/10.1016/j.jclepro.2016.11.052
  • Kim, S. J., & Sarkar, B. (2017b). Supply chain model with stochastic lead time, trade-credit financing, and transportation discount. Mathematical Problems in Engineering, 2017, 1–14. https://doi.org/10.1155/2017/6465912
  • Konstantaras, I., & Papachristos, S. (2006). Lot-sizing for a single-product recovery system with backordering. International Journal of Production Research, 44(10), 2031–2045. https://doi.org/10.1080/00207540500380924
  • Konstantaras, I., & Papachristos, S. (2008). Note on: An optimal ordering and recovery policy for reusable items. Computers and Industrial Engineering, 55(3), 729–734. https://doi.org/10.1016/j.cie.2008.02.007
  • Malleeswarn, B., & Uthayakumar, R. (2022). A single-manufacturer multi-retailer sustainable reworking model for green and environmental sensitive demand under discrete ordering cost reduction. Journal of Management Analytics, https://doi.org/10.1080/23270012.2022.2030255
  • Mawandiya, B. K., Jha, J. K., & Thakkar, J. (2015). Production-inventory model for two-echelon closed-loop supply chain with finite manufacturing and remanufacturing rates. International Journal of Systems Science: Operations & Logistics, 4(3), 199–218. https://doi.org/10.1080/23302674.2015.1121303
  • Mondal, C., & Giri, B. C. (2021). Investigating strategies of a green closed-loop supply chain for substitutable products under government subsidy. Journal of Industrial and Production Engineering, 39(4), 253–276. https://doi.org/10.1080/21681015.2021.1974962
  • Nahmias, S., & Rivera, H. (1979). A deterministic model for a repairable item inventory system with a finite repair rate. International Journal of Production Research, 17(3), 215–221. https://doi.org/10.1080/00207547908919609
  • Pal, B., Sana, S. S., & Chaudhuri, K. (2012). Three-layer supply chain – A production-inventory model for reworkable items. Applied Mathematics and Computation, 219(2), 530–543. https://doi.org/10.1016/j.amc.2012.06.038
  • Richter, K. (1996). The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research, 95(2), 313–324. https://doi.org/10.1016/0377-2217(95)00276-6
  • Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64(1-3), 59–64. https://doi.org/10.1016/S0925-5273(99)00044-4
  • Saxena, N., Sarkar, B., & Singh, S. R. (2020). Selection of remanufacturing/production cycles with an alternative market: A perspective on waste management. Journal of CleanerProduction, 245, 118935. https://doi.org/10.1016/j.jclepro.2019.118935
  • Saxena, N., Singh, S. R., & Sana, S. S. (2017). A green supply chain model of vendor and buyer for remanufacturing. RAIRO Operations Research, 51(4), 1133–1150. https://doi.org/10.1051/ro/2016077
  • Schrady, D. A. (1967). A deterministic inventory model for reparable items. Naval Research Logistics Quarterly, 14(3), 391–398. https://doi.org/10.1002/nav.3800140310
  • Taleizadeh, A. A., Alizadeh-Basban, N., & Niaki, S. T. A. (2019). A closed-loop supply chain considering carbon reduction, quality improvement effort, and return policy under two remanufacturing scenarios. Journal of Cleaner Production, 232, 1230–1250. https://doi.org/10.1016/j.jclepro.2019.05.372
  • Taleizadeh, A. A., Kalantari, S. S., & Cárdenas-Barrón, L. E. (2016). Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments. TOP, 24(1), 143–155. https://doi.org/10.1007/s11750-015-0377-9
  • Teunter, R. H. (2001). Economic ordering quantities for recoverable item inventory systems. Naval Research Logistics, 48(6), 484–495. https://doi.org/10.1002/nav.1030
  • Tsai, D. M. (2012). Optimal ordering and production policy for a recoverable item inventory system with learning effect. International Journal of Systems Science, 43(2), 349–367. https://doi.org/10.1080/00207721.2010.502261
  • Tsao, Y.-C., Zhang, Q., Zhang, X., & Vu, T.-L. (2021). Supply chain network design for perishable products under trade credit. Journal of Industrial and Production Engineering, 38(6), 466–474. https://doi.org/10.1080/21681015.2021.1937722
  • Wee, H. M., Wang, W. T., Cheng, Y. L., & Huang, Y. D. (2014). An economic production quantity model with non-synchronized screening and rework. Applied Mathematics and Computation, 233, 127–138. https://doi.org/10.1016/j.amc.2014.01.150
  • Wein, A. S. (1992). Random yield, rework and scrap in a multi-stage batch manufacturing environment. Operations Research, 40(3), 551–563. https://doi.org/10.1287/opre.40.3.551
  • Wu, J.-W., Lee, W.-C., & Lei, C.-L. (2009). Optimal inventory policy involving ordering cost reduction, back-order discounts, and variable lead time demand by minimax criterion. Mathematical Problems in Engineering, 1–19. https://doi.org/10.1155/2009/928932
  • Zhang, T., Liang, L., Yu, Y., & Yu, Y. (2007). An integrated vendor managed inventory model for a two-echelon system with order cost reduction. International Journal of Production Economics, 109(1-2), 241–253. https://doi.org/10.1016/j.ijpe.2006.12.051

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.