76
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Optimal bivariate spare ordering policy for a system with imperfect maintenance

&

References

  • Barlow, R. E., & Hunter, L. C. (1960). Optimum preventive maintenance policies. Operations Research, 8(1), 90–100. https://doi.org/10.1287/opre.8.1.90
  • Barlow, R. E., & Proschan, F. (1965). Mathematical theory of reliability. John Wiley & Sons.
  • Beichelt, F. (1993). A unifying treatment of replacement policies with minimal repair. Naval Research Logistics, 40(1), 51–67. https://doi.org/10.1002/1520-6750(199302)40:1<51::AID-NAV3220400104>3.0.CO;2-V
  • Brown, M., & Proschan, F. (1983). Imperfect repair. Journal of Applied Probability, 20, 851–859.
  • Chang, C. C. (2018). Optimal age replacement scheduling for a random work system with random lead time. International Journal of Production Research, 56(16), 5511–5521. https://doi.org/10.1080/00207543.2018.1425017
  • Chang, C. C., Chen, Y. L., Yin, X., & Zhang, Z. G. (2019). Generalized multi-parameter preventive replacement policy for systems with random processing times. INFOR: Information Systems and Operational Research, 57(2), 187–203. https://doi.org/10.1080/03155986.2018.1533210
  • Cheng, G., & Li, L. (2012). Collaborative optimization of replacement and spare ordering of a deteriorating system with two failure types. Applied Mechanics and Materials, 220–223, 210–214. https://doi.org/10.4028/www.scientific.net/AMM.220-223.210
  • Chien, Y. H. (2009). A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times. Applied Mathematical Modelling, 33(3), 1708–1718. https://doi.org/10.1016/j.apm.2008.03.014
  • Chien, Y. H., Chang, C. C., & Sheu, S. H. (2010). Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy. Annals of Operations Research, 181(1), 723–744. https://doi.org/10.1007/s10479-009-0679-0
  • Chien, Y. H., & Chen, J. A. (2010). Optimal spare ordering policy for preventive replacement under cost effectiveness criterion. Applied Mathematical Modelling, 34(3), 716–724. https://doi.org/10.1016/j.apm.2009.06.017
  • Mizutani, S., Dong, W., Zhao, X., & Nakagawa, T. (2020). Preventive replacement policies with products update announcements. Communications in Statistics - Theory and Methods, 49(15), 3821–3833. https://doi.org/10.1080/03610926.2019.1710762
  • Nakagawa, T. (2006). Maintenance theory of reliability. Springer Science & Business Media.
  • Nakagawa, T., & Osaki, S. (1974). Optimum replacement policies with delay. Journal of Applied Probability, 11(1), 102–110. https://doi.org/10.2307/3212587
  • Pham, H., & Wang, H. (1996). Imperfect maintenance. European Journal of Operational Research, 94(3), 425–438. https://doi.org/10.1016/S0377-2217(96)00099-9
  • Sarada, Y., & Shenbagam, R. (2021). Optimization of a repairable deteriorating system subject to random threshold failure using preventive repair and stochastic lead time. Reliability Engineering & System Safety, 205. https://doi.org/10.1016/j.ress.2020.107229
  • Sheu, S. H., & Chien, Y. H. (2004). Optimal age-replacement policy of a system subject to shocks with random lead-time. European Journal of Operational Research, 159(1), 132–144. https://doi.org/10.1016/S0377-2217(03)00409-0
  • Sheu, S. H., & Griffith, W. S. (2001). Optimal age-replacement policy with age-dependent minimal-repair and random-leadtime. IEEE Transactions on Reliability, 50(3), 302–309. https://doi.org/10.1109/24.974128
  • Sheu, S. H., & Liou, C. T. (1993). Optimum ordering policies with age-replacement minimal repair and two types of lead times. International Journal of Systems Science, 24(2), 253–264. https://doi.org/10.1080/00207729308949486
  • Sheu, S. H., Zhang, Z. G., Chien, Y. H., & Huang, T. H. (2013). Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks. Applied Mathematical Modelling, 37(14-15), 7717–7725. https://doi.org/10.1016/j.apm.2013.03.017
  • Wiggins, A. D. (1967). A minimum cost model of spare parts inventory control. Technometrics, 9(4), 661–665. https://doi.org/10.1080/00401706.1967.10490514
  • Zhang, X., Liao, H., Zeng, J., Shi, G., & Zhao, B. (2021). Optimal condition-based opportunistic maintenance and spare parts provisioning for a two-unit system using a state space partitioning approach. Reliability Engineering & System Safety, 209. https://doi.org/10.1016/j.ress.2021.107451
  • Zhao, X., Qian, C., & Nakagawa, T. (2017). Comparisons of replacement policies with periodic times and repair numbers. Reliability Engineering & System Safety, 168, 161–170. https://doi.org/10.1016/j.ress.2017.05.015

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.