Optimal production and non-periodic maintenance plan for a degrading serial production system with uncertain demand

, , &

References

  • Ayed, S., Hajej, Z., Turki, S., & Rezg, N. (2017). FPA method for optimal production planning under availability/degradation machine and subcontracting constraint. International Journal of Production Research, 55(8), 2135–2148. https://doi.org/10.1080/00207543.2016.1165879
  • Beheshti Fakher, H., Nourelfath, M., & Gendreau, M. (2017). A cost minimisation model for joint production and maintenance planning under quality constraints. International Journal of Production Research, 55(8), 2163–2176. https://doi.org/10.1080/00207543.2016.1201605
  • Berrichi, A., Yalaoui, F., Amodeo, L., & Mezghiche, M. (2010). Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Computers & Operations Research, 37(9), 1584–1596. https://doi.org/10.1016/j.cor.2009.11.017
  • Canto, S. P. (2011). Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling. Optimization and Engineering, 12(3), 333–347. https://doi.org/10.1007/s11081-011-9146-2
  • Chansombat, S., Pongcharoen, P., & Hicks, C. (2019). A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. International Journal of Production Research, 57(1), 61–82. https://doi.org/10.1080/00207543.2018.1459923
  • Chung, S. H., Chan, F. T., & Chan, H. K. (2009). A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling. Engineering Applications of Artificial Intelligence, 22(7), 1005–1014. https://doi.org/10.1016/j.engappai.2008.11.004
  • Cui, W., Lu, Z., Li, C., & Han, X. (2018). A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops. Computers & Industrial Engineering, 115, 342–353. https://doi.org/10.1016/j.cie.2017.11.020
  • Duffuaa, S., Kolus, A., Al-Turki, U., & El-Khalifa, A. (2020). An integrated model of production scheduling, maintenance and quality for a single machine. Computers & Industrial Engineering, 142, 106239. https://doi.org/10.1016/j.cie.2019.106239
  • Dunn, R. L. (1987). Advanced maintenance technologies. Plant Engineering, 41(12), 80–93.
  • Ebrahimipour, V., Najjarbashi, A., & Sheikhalishahi, M. (2015). Multi-objective modeling for preventive maintenance scheduling in a multiple production line. Journal of Intelligent Manufacturing, 26(1), 111–122. https://doi.org/10.1007/s10845-013-0766-6
  • Ettaye, G., El Barkany, A. E. I., Jabri, A., & El Khalfi, A. E. I. (2018). Optimizing the integrated production and maintenance planning using genetic algorithm. International Journal of Engineering Business Management, 10, 1–9. https://doi.org/10.1177/1847979018773260.
  • Fitouhi, M. C., & Nourelfath, M. (2012). Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. International Journal of Production Economics, 136(2), 344–351. https://doi.org/10.1016/j.ijpe.2011.12.021
  • Hajej, Z., Rezg, N., & Askri, T. (2020). Joint optimization of capacity, production and maintenance planning of leased machines. Journal of Intelligent Manufacturing, 31(2), 351–374. https://doi.org/10.1007/s10845-018-1450-7
  • Hajej, Z., Rezg, N., & Gharbi, A. (2018). Quality issue in forecasting problem of production and maintenance policy for production unit. International Journal of Production Research, 56(18), 6147–6163. https://doi.org/10.1080/00207543.2018.1478150
  • Hajej, Z., Rezg, N., & Gharbi, A. (2021). Joint production preventive maintenance and dynamic inspection for a degrading manufacturing system. The International Journal of Advanced Manufacturing Technology, 112(1), 221–239. https://doi.org/10.1007/s00170-020-06325-3
  • Hajej, Z., Turki, S., & Rezg, N. (2015). Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns. International Journal of Production Research, 53(15), 4694–4719. https://doi.org/10.1080/00207543.2015.1041569
  • Hnaien, F., Yalaoui, F., Mhadhbi, A., & Nourelfath, M. (2016). A mixed-integer programming model for integrated production and maintenance. IFAC-PapersOnLine, 49(12), 556–561. https://doi.org/10.1016/j.ifacol.2016.07.694
  • Holt, C. C., Modigliani, F., Muth, J. F., & Simon, H. A. (1960). Production planning, inventories, and workforce. Prentice Hall.
  • Huang, J., Chang, Q., & Arinez, J. (2020). Deep reinforcement learning based preventive maintenance policy for serial production lines. Expert Systems with Applications, 113701. https://doi.org/10.1016/j.eswa.2020.113701
  • Huang, Y. S., Chen, E., & Ho, J. W. (2013). Two-dimensional warranty with reliability-based preventive maintenance. IEEE Transactions on Reliability, 62(4), 898–907. https://doi.org/10.1109/TR.2013.2285051
  • Jin, X., Li, L., & Ni, J. (2009). Option model for joint production and preventive maintenance system. International Journal of Production Economics, 119(2), 347–353. https://doi.org/10.1016/j.ijpe.2009.03.005
  • Lee, J., Kim, B., & Ahn, S. (2019). Maintenance optimization for repairable deteriorating systems under imperfect preventive maintenance. Mathematics, 7(8), 716. https://doi.org/10.3390/math7080716
  • Lin, Z. L., Huang, Y. S., & Fang, C. C. (2015). Non-periodic preventive maintenance with reliability thresholds for complex repairable systems. Reliability Engineering & System Safety, 136, 145–156. https://doi.org/10.1016/j.ress.2014.12.010
  • Liu, Q., Dong, M., & Chen, F. F. (2018). Single-machine-based joint optimization of predictive maintenance planning and production scheduling. Robotics and Computer-Integrated Manufacturing, 51, 238–247. https://doi.org/10.1016/j.rcim.2018.01.002
  • Njike, A. N., Pellerin, R., & Kenne, J. P. (2012). Simultaneous control of maintenance and production rates of a manufacturing system with defective products. Journal of Intelligent Manufacturing, 23(2), 323–332. https://doi.org/10.1007/s10845-009-0354-y
  • Reintjes, C., & Lorenz, U. (2021). Bridging mixed integer linear programming for truss topology optimization and additive manufacturing. Optimization and Engineering, 22, 849–893. https://doi.org/10.1007/s11081-020-09541-8
  • Sarkar, B., Sana, S. S., & Chaudhuri, K. (2010). Optimal reliability, production lotsize and safety stock: An economic manufacturing quantity model. International Journal of Management Science and Engineering Management, 5(3), 192–202. https://doi.org/10.1080/17509653.2010.10671108
  • Shamsaei, F., & Van Vyve, M. (2017). Solving integrated production and condition-based maintenance planning problems by MIP modeling. Flexible Services and Manufacturing Journal, 29(2), 184–202. https://doi.org/10.1007/s10696-016-9244-8
  • Spüntrup, F. S., Dalle Ave, G., Imsland, L., & Harjunkoski, I. (2022). Integration of maintenance scheduling and planning for large-scale asset fleets. Optimization and Engineering, 23, 1255–1287. https://doi.org/10.1007/s11081-021-09647-7
  • Wang, L., Lu, Z., & Ren, Y. (2020). Joint production control and maintenance policy for a serial system with quality deterioration and stochastic demand. Reliability Engineering & System Safety, 199, 106918. https://doi.org/10.1016/j.ress.2020.106918
  • Xiao, L., Song, S., Chen, X., & Coit, D. W. (2016). Joint optimization of production scheduling and machine group preventive maintenance. Reliability Engineering & System Safety, 146, 68–78. https://doi.org/10.1016/j.ress.2015.10.013

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.