91
Views
0
CrossRef citations to date
0
Altmetric
Research Article

The impact of delayed fixed-price payment in the decentralised project supply chain

, &
Article: 2308584 | Received 06 Feb 2023, Accepted 16 Jan 2024, Published online: 05 Feb 2024

Reference

  • Aghdam, S. S., Fattahi, P., Hosseini, S. M. H., Babaeimorad, S., & Sana, S. S. (2023). Joint optimisation of the maintenance and buffer stock policies considering back orders. International Journal of Systems Science-Operations & Logistics, https://doi.org/10.1080/23302674.2023.2169054
  • Atan, Z., Ahmadi, T., Stegehuis, C., de Kok, T., & Adan, I. (2017). Assemble-to-order systems: A review. European Journal of Operational Research, 261(3), 866–879. https://doi.org/10.1016/j.ejor.2017.02.029
  • Atan, Z., de Kok, T., Dellaert, N. P., van Boxel, R., & Janssen, F. (2016). Setting planned leadtimes in customer-order-driven assembly systems. M&Som-Manufacturing & Service Operations Management, 18(1), 122–140. https://doi.org/10.1287/msom.2015.0565
  • Axsäter, S. (2005). Planning order releases for an assembly system with random operation times. Or Spectrum, 27(2-3), 459–470.
  • Bajari, P., & Tadelis, S. (2001). Incentives versus transaction costs: A theory of procurement contracts. The RAND Journal of Economics, 32(3), 387–407.
  • Ben-Ammar, O., Castagliola, P., Dolgui, A., & Hnaien, F. (2020). A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times. Computers & Industrial Engineering, 149, Article 106794. https://doi.org/10.1016/j.cie.2020.106794
  • Ben-Ammar, O., & Dolgui, A. (2018). Optimal order release dates for two-level assembly systems with stochastic lead times at each level. International Journal of Production Research, 56(12), 4226–4242. https://doi.org/10.1080/00207543.2018.1449268
  • Ben-Ammar, O., Dolgui, A., & Wu, D. D. (2018). Planned lead times optimization for multi-level assembly systems under uncertainties. Omega-International Journal of Management Science, 78, 39–56. https://doi.org/10.1016/j.omega.2017.11.004
  • Cachon, G. P. (2003). Supply chain coordination with contracts. Handbooks in Operations Research and Management Science, 11(11), 227–339.
  • Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., & Wong, J. M. W. (2011). An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction. International Journal of Project Management, 29(5), 577–590. https://doi.org/10.1016/j.ijproman.2010.04.002
  • Chauhan, S. S., Dolgui, A., & Proth, J. M. (2009). A continuous model for supply planning of assembly systems with stochastic component procurement times. International Journal of Production Economics, 120(2), 411–417. https://doi.org/10.1016/j.ijpe.2008.11.015
  • Chen, S., & Lee, H. (2017). Incentive alignment and coordination of project supply chains. Management Science, 63(4), 1011–1025.
  • Chen, T., Klastorin, T., & Wagner, M. R. (2015). Incentive contracts in serial stochastic projects. M&Som-Manufacturing & Service Operations Management, 17(3), 290–301. https://doi.org/10.1287/msom.2015.0528
  • Chu, C., Proth, J. M., & Xie, X. (1993). Supply management in assembly systems. Naval Research Logistics (NRL), 40(7), 933–949.
  • Dean, B. V., Mantel, S. J., & Roepcke, L. A. (1969). Research project cost distributions and budget forecasting. Engineering Management, IEEE Transactions on, 16(4), 176–189.
  • Demeulemeester, E. L., & Herroelen, W. S. (2002). Project scheduling: A research handbook. Kluwer Academic Publishers.
  • DeValve, L., Pekec, S., & Wei, Y. H. (2020). A primal-dual approach to analyzing ATO systems. Management Science, 66(11), 5389–5407. https://doi.org/10.1287/mnsc.2019.3486
  • Giri, B. C., Bardhan, S., & Maiti, T. (2016). Coordinating a three-layer supply chain with uncertain demand and random yield. International Journal of Production Research, 54(8), 2499–2518. https://doi.org/10.1080/00207543.2015.1119324
  • Guan, X., Li, G., & Yin, Z. (2016). The implication of time-based payment contract in the decentralized assembly system. Annals of Operations Research, 240(2), 641–659.
  • Hegedus, M. G., & Hopp, W. J. (2001). Setting procurement safety lead-times for assembly systems. International Journal of Production Research, 39(15), 3459–3478.
  • Herroelen, W., & Leus, R. (2004). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289–306.
  • Hnaien, F., Dolgui, A., & Wu, D. D. (2016). Single-period inventory model for one-level assembly system with stochastic lead times and demand. International Journal of Production Research, 54(1), 186–203. https://doi.org/10.1080/00207543.2015.1066518
  • Hopp, W. J., & Spearman, M. L. (1993). Setting safety leadtimes for purchased components in assembly systems. IIE Transactions, 25(2), 2–11.
  • Hou, C. F., Lu, M. S., Deng, T. H., & Shen, Z. J. M. (2021). Coordinating project outsourcing through bilateral contract negotiations. M&Som-Manufacturing & Service Operations Management, 23(6), 1543–1561. https://doi.org/10.1287/msom.2020.0911
  • Hu, Y., Guan, Y., & Liu, T. (2010). Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games. European Journal of Operational Research, 210(2), 231–240.
  • Huang, Y. S., Fang, C. C., & Sun, W. J. (2023). Capacity coordination under uncertain yield for supply chains with a single supplier and two competing retailers. International Journal of Systems Science-Operations & Logistics, 10(1), https://doi.org/10.1080/23302674.2022.2085341
  • Jansen, S., Atan, Z., Adan, I., & de Kok, T. (2019). Setting optimal planned leadtimes in configure-to-order assembly systems. European Journal of Operational Research, 273(2), 585–595. https://doi.org/10.1016/j.ejor.2018.08.036
  • Kankt, J. J., & Chfusty, D. P. (1984). Manufacturing systems with forbidden early order departure. International Journal of Production Research, 22(1), 41–50.
  • Khan, M. A., Shaikh, A. A., Panda, G. C., Bhunia, A. K., & Konstantaras, I. (2020). Non-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backlogging. Annals of Operations Research, 289(2), 243–275. https://doi.org/10.1007/s10479-020-03568-x
  • Konstantaras, I., Skouri, K., & Benkherouf, L. (2021). Optimizing inventory decisions for a closed-loop supply chain model under a carbon tax regulatory mechanism. International Journal of Production Economics, 239, Article 108185. https://doi.org/10.1016/j.ijpe.2021.108185
  • Kouvelis, P., Chen, X. X., & Xia, Y. (2023). Managing material shortages in project supply chains: Inventories, time buffers, and supplier flexibility. Production and Operations Management, https://doi.org/10.1111/poms.14059
  • Kumar, A. (1989). Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Transactions, 21(2), 112–121.
  • Kwon, H. D., Lippman, S. A., McCardle, K. F., & Tang, C. S. (2010a). Project management contracts with delayed payments. Manufacturing & Service Operations Management, 12(4), 692–707.
  • Kwon, H. D., Lippman, S. A., & Tang, C. S. (2010b). Optimal time-based and cost-based coordinated project contracts with unobservable work rates. International Journal of Production Economics, 126(2), 247–254.
  • Leng, M. M., & Zhu, A. (2009). Side-payment contracts in two-person nonzero-sum supply chain games: Review, discussion and applications. European Journal of Operational Research, 196(2), 600–618. https://doi.org/10.1016/j.ejor.2008.03.029
  • Liu, L. M., Xu, H., & Zhu, S. X. (2020). Push verse pull: Inventory-leadtime tradeoff for managing system variability. European Journal of Operational Research, 287(1), 119–132. https://doi.org/10.1016/j.ejor.2020.04.033
  • Louly, M. A., & Dolgui, A. (2011). Optimal time phasing and periodicity for MRP with POQ policy. International Journal of Production Economics, 131(1), 76–86. https://doi.org/10.1016/j.ijpe.2010.04.042
  • Louly, M. A., Dolgui, A., & Hnaien, F. (2008a). Optimal supply planning in MRP environments for assembly systems with random component procurement times. International Journal of Production Research, 46(19), 5441–5467. https://doi.org/10.1080/00207540802273827
  • Louly, M. A., Dolgui, A., & Hnaien, F. (2008b). Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint. International Journal of Production Economics, 115(1), 236–247. https://doi.org/10.1016/j.ijpe.2008.06.005
  • Ould-Louly, M.-A., & Dolgui, A. (2002). Generalized newsboy model to compute the optimal planned lead times in assembly systems. International Journal of Production Research, 40(17), 4401–4414.
  • Sana, S. S. (2020). Price competition between green and non green products under corporate social responsible firm. Journal of Retailing and Consumer Services, 55, Article 102118. <Go to ISI>://WOS:000541166100007.
  • Sana, S. S. (2022). A structural mathematical model on two echelon supply chain system. Annals of Operations Research, 315(2), 1997–2025. https://doi.org/10.1007/s10479-020-03895-z
  • Shen, J. N., & Qian, J. (2022). The impact of insufficient cash flow on payment term and supply chain contracts. International Journal of Systems Science-Operations & Logistics, 9(2), 224–240. https://doi.org/10.1080/23302674.2021.1871982
  • Shore, H. (1995). Setting safety lead-times for purchased components in assembly systems: A general solution procedure. IIE Transactions, 27(5), 634–637.
  • Singh, S., & Sarin, S. C. (2023). Modeling and analysis of a new production methodology for achieving mass customization. International Journal of Production Research, https://doi.org/10.1080/00207543.2023.2217310
  • Song, J.-S. (2003). Supply chain operations: Assemble-to-order systems. Handbooks in Operations Research and Management Science, 11, 561–596.
  • Song, J.-S., Yano, C. A., & Lerssrisuriya, P. (2000). Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing & Service Operations Management, 2(3), 287–296.
  • Tang, C. S., Zhang, K. R., & Zhou, S. X. (2015). Incentive contracts for managing a project with uncertain completion time. Production and Operations Management, 24(12), 1945–1954. https://doi.org/10.1111/poms.12387
  • Tang, O., & Grubbström, R. W. (2003). The detailed coordination problem in a two-level assembly system with stochastic lead times. International Journal of Production Economics, 81(Jan), 415–429.
  • Udayakumar, R., Geetha, K. V., & Sana, S. S. (2021). Economic ordering policy for non-instantaneous deteriorating items with price and advertisement dependent demand and permissible delay in payment under inflation. Mathematical Methods in the Applied Sciences, 44(9), 7697–7721. https://doi.org/10.1002/mma.6594
  • Whybark, D. C., & Williams, J. G. (1976). Material requirements planning under uncertainty. Decision Sciences, 7(4), 595–606.
  • Yang, H. L. (2021). Retailer's ordering policy for demand depending on the expiration date with limited storage capacity under supplier credits linked to order quantity and discounted cash flow. International Journal of Systems Science-Operations & Logistics, 8(2), 136–153. https://doi.org/10.1080/23302674.2019.1701727
  • Yano, C. A. (1987). Planned leadtimes for serial production systems. IIE Transactions, 19(3), 300–307.
  • Yano, C. A. (1987). Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33(1), 95–106.
  • Yano, C. A. (1987). Stochastic leadtimes in two-level assembly systems. IIE Transactions, 19(4), 371–378.
  • Zhai, Y., & Cheng, T. C. E. (2022). Lead-time quotation and hedging coordination in make-to-order supply chain. European Journal of Operational Research, 300(2), 449–460.
  • Zhai, Y., Fu, Y. L., Xu, G. Y., & Huang, G. (2019). Multi-period hedging and coordination in a prefabricated construction supply chain. International Journal of Production Research, 57(7), 1949–1971. https://doi.org/10.1080/00207543.2018.1512765
  • Zhai, Y., Zhong, R. Y., Li, Z., & Huang, G. (2017). Production lead-time hedging and coordination in prefabricated construction supply chain management. International Journal of Production Research, 55(14), 3984–4002. https://doi.org/10.1080/00207543.2016.1231432
  • Zhou, Y. X., Wang, X., Naim, M. M., & Gosling, J. (2022). A system dynamics archetype to mitigate rework effects in engineer-to-order supply chains. International Journal of Production Economics, 250, Article 108620. https://doi.org/10.1016/j.ijpe.2022.108620

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.