103
Views
1
CrossRef citations to date
0
Altmetric
Articles

Inspection strategies for quality products with rewards in a multi-stage production

ORCID Icon &
Pages 596-609 | Received 19 Mar 2021, Accepted 11 Oct 2022, Published online: 24 Oct 2022

References

  • Alagoz, O., & Ayvaci, M. (2011). Uniformization in Markov decision processes. Wiley Online Library.
  • Askin, R., & Standridge, C. (1993). Modeling and analysis of manufacturing systems. New York: Wiley.
  • Bellman, R. E. (1957). Dynamic programming. Princeton University Press.
  • Berman, O., & Kim, E. (1999). Stochastic models for inventory management at service facilities. Communications in Statistics. Stochastic Models, 15(4), 695–718. https://doi.org/10.1080/15326349908807558
  • Berman, O., & Sapna, K. (2001). Optimal control of service for facilities holding inventory. Computers & Operations Research, 28(5), 429–441. https://doi.org/10.1016/S0305-0548(99)00128-8
  • Bertsekas, D. P. (2001). Dynamic programming and stochastic control. Athena Scientific.
  • Bettayeb, B., Bassetto, S.J., & Tollenaere, M. (2016). Simulation-based optimization of sampling plans to reduce inspections while mastering the risk exposure in semiconductor manufacturing. Journal of Intelligent Manufacturing, 27(6), 1335–1349. https://doi.org/10.1007/s10845-014-0956-x
  • Bhattacharya, R., & Kaur, A. (2014). Single stage closed loop manufacturing-remanufacturing system profitability with different combinations of internal and external return flows: An analytical study. International Journal of Logistics Systems and Management, 17(4), 416–446. https://doi.org/10.1504/IJLSM.2014.061014
  • Britney, R. R. (1972). Optimal screening plans for nonserial production systems. Management Science, 18(9), 550–559. https://doi.org/10.1287/mnsc.18.9.550
  • Bustamam, F. L., Teng, S. S., & Abdullah, F. Z. (2014). Reward management and job satisfaction among frontline employees in hotel industry in Malaysia. Procedia -- Social and Behavioral Sciences, 144, 392–402. https://doi.org/10.1016/j.sbspro.2014.07.308
  • Buzacott, J. A., & Shanthikumar, J. G. (1992). Design of manufacturing systems using queueing models. Queueing Systems, 12(1-2), 135–213. https://doi.org/10.1007/BF01158638
  • Chen, T. J., & Thornton, A. C. (1999). Quantitative selection of inspection plans. ASME 1999 Design Engineering Technical Conferences, 3, 175–185.
  • Cinlar, E. (1975). Introduction to stochastic processes. Englewood Cliffs, NJ: Prentice Hall.
  • Cohen, J. (1969). The single server queue. Amsterdam: NorthHolland.
  • Conway, A., & Georganas, N. (1988). Queueing networks -- Exact computational algorithms: A unified theory based on decomposirion and aggregation. Cambridge, MA: MIT Press.
  • Dev, N., Shankar, R., & Choudhary, A. (2016). Strategic design for inventory and production planning in closed-loop hybrid systems. International Journal of Production Economics, 183, 345–353. https://doi.org/10.1016/j.ijpe.2016.06.017
  • Dobos, I., & Richter, K. (2003). A production/recycling model with stationary demand and return rates. Central European Journal of Operations Research, 11, 35–46.
  • El Saadany, A. M., & Jaber, M. Y. (2008). The eoq repair and waste disposal model with switching costs. Computers & Industrial Engineering, 55(1), 219–233. https://doi.org/10.1016/j.cie.2008.01.016
  • El Saadany, A. M., & Jaber, M. Y. (2011). A production/remanufacture model with returns' subassemblies managed differently. International Journal of Production Economics, 133(1), 119–126. https://doi.org/10.1016/j.ijpe.2010.08.014
  • Enrick, N. (1975). Towards optimization of inspection allocation part i and ii. Industrial Management, 17, 7–11.
  • Ercan, S. S. (1972). Systems approach to the multistage manufacturing connected unit situation. Naval Research Logistics Quarterly, 19(3), 493–500. https://doi.org/10.1002/(ISSN)1931-9193
  • Glock, C. H. (2017). Decision support models for managing returnable transport items in supply chains: A systematic literature review. International Journal of Production Economics, 183, 561–569. https://doi.org/10.1016/j.ijpe.2016.02.015
  • Glock, C. H., & Jaber, M. Y. (2013). A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Computers and Industrial Engineering, 64(2), 708–720. https://doi.org/10.1016/j.cie.2012.08.018
  • Govindan, K., Soleimani, H., & Kannan, D. (2015). Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future. European Journal of Operational Research, 240(3), 603–626. https://doi.org/10.1016/j.ejor.2014.07.012
  • Gross, D., & Harris, C. (1985). Fundamentals of queueing theory. 2nd ed, New York: Wiley.
  • Gu, Q., & Tagaras, G. (2014). Optimal collection and remanufacturing decisions in reverse supply chains with collector's imperfect sorting. International Journal of Production Research, 52(17), 5155–5170. https://doi.org/10.1080/00207543.2014.899720
  • Gurnani, H., Drezner, Z., & Akella, R. (1996). Capacity planning under different inspection strategies. European Journal of Operational Research, 89(2), 302–312. https://doi.org/10.1016/0377-2217(94)00276-2
  • Hariga, M., Asad, R., & Khan, Z. (2017). Manufacturing-remanufacturing policies for a centralized two stage supply chain under consignment stock partnership. International Journal of Production Economics, 183, 362–374. https://doi.org/10.1016/j.ijpe.2016.07.015
  • Hasanov, P., Jaber, M. Y., & Zolfaghari, S. (2012). Production, remanufacturing and waste disposal models for the cases of pure and partial backordering. Applied Mathematical Modelling, 36(11), 5249–5261. https://doi.org/10.1016/j.apm.2011.11.066
  • He, Q. M., & Neuts, M. F. (1998). Markov chains with marked transitions11this research was supported in part by grant no. dmi-930628 from the national science foundation and the K.C. Wang education foundation. Stochastic Processes and Their Applications, 74(1), 37–52. https://doi.org/10.1016/S0304-4149(97)00109-9
  • Heyman, D., & Sobel, M. (1990). Stochastic models. New York: Elsevier Science Publications.
  • Howard, R. A. (1960). Dynamic programming and Markov processes. New York: John Wiley and Sons, Inc.
  • HSU, J. I. S. (1984). A hybrid inspection system for the multistage production process. International Journal of Production Research, 22(1), 63–70. https://doi.org/10.1080/00207548408942430
  • Jaber, M. Y., & Bonney, M. (1998). The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs. Production Planning & Control, 9(1), 20–27. https://doi.org/10.1080/095372898234488
  • Jaber, M. Y., & El Saadany, A. M. (2009). The production, remanufacture and waste disposal model with lost sales. International Journal of Production Economics, 120(1), 115–124. https://doi.org/10.1016/j.ijpe.2008.07.016
  • Jaber, M. Y., & El Saadany, A. M. (2011). An economic production and remanufacturing model with learning effects. International Journal of Production Economics, 131(1), 115–127. https://doi.org/10.1016/j.ijpe.2009.04.019
  • Jaber, M. Y., Zanoni, S., & Zavanella, L. E. (2014). A consignment stock coordination scheme for the production, remanufacturing and waste disposal problem. International Journal of Production Research, 52(1), 50–65. https://doi.org/10.1080/00207543.2013.827804
  • Jauhari, W. A., Dwicahyani, A. R., & Kurdhi, N. A. (2017). Lot sizing decisions in a closed-loop supply chain system with remanufacturing. International Journal of Procurement Management, 10(3), 381–409. https://doi.org/10.1504/IJPM.2017.083469
  • Jewkes, E. M. (1995). Optimal inspection effort and scheduling for a manufacturing process with repair. European Journal of Operational Research, 85(2), 340–351. https://doi.org/10.1016/0377-2217(94)00046-F
  • Kleinrock, L. (1975). Queueing systems, volume I: Theory. New York: Wiley.
  • Konstantaras, I., & Papachristos, S. (2006). Lot-sizing for a single-product recovery system with backordering. International Journal of Production Research, 44(10), 2031–2045. https://doi.org/10.1080/00207540500380924
  • Konstantaras, I., Skouri, K., & Jaber, M. (2012). Inventory models for imperfect quality items with shortages and learning in inspection. Applied Mathematical Modelling, 36(11), 5334–5343. https://doi.org/10.1016/j.apm.2011.12.005
  • Latouche, G., & Ramaswami, V. (1999). Introduction to matrix analytic methods in stochastic modeling. Society for Industrial and Applied Mathematics.
  • Lindsay, G. F., & Bishop, A. B. (1964). Allocation of screening inspection effort-a dynamic-programming approach. Management Science, 10(2), 342–352. https://doi.org/10.1287/mnsc.10.2.342
  • Mandroli, S. S., Shrivastava, A. K., & Ding, Y. (2006). A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes. IIE Transactions, 38(4), 309–328. https://doi.org/10.1080/07408170500327352
  • Moeinizade, S., Hu, G., & Wang, L. (2022). A reinforcement learning approach to resource allocation in genomic selection. Intelligent Systems with Applications, 14, 200076–3053. https://doi.org/10.1016/j.iswa.2022.200076
  • Mohammadi, M., Dantan, J. Y., Siadat, A., & Tavakkoli-Moghaddam, R. (2018). A bi-objective robust inspection planning model in a multi-stage serial production system. International Journal of Production Research, 56(4), 1432–1457. https://doi.org/10.1080/00207543.2017.1363425
  • Nahmiasj, S., & Rivera, H. (1979). A deterministic model for a repairable item inventory system with a finite repair rate. International Journal of Production Research, 17(3), 215–221. https://doi.org/10.1080/00207547908919609
  • Neuts, M. (1979). A versatile Markovian point process. Journal of Applied Probability, 16(4), 764–779. https://doi.org/10.2307/3213143
  • Neuts, M. (1981). Matrix-geometric solutions in stochastic models -- An algorithmic approach. Baltimore, MD: The Johns Hopkins University Press.
  • Nobil, A. H., Afshar Sedigh, A. H., & Afshar-Nadjafi, B. (2020). Lot-sizing problem for a defective processing system with categorized items, backordering and pricing policy. Journal of Revenue and Pricing Management, 19(4), 255–265. https://doi.org/10.1057/s41272-019-00208-3
  • Nobil, A. H., Afshar Sedigh, A. H., & Cárdenas-Barrón, L. E. (2018). Multi-machine economic production quantity for items with scrapped and rework with shortages and allocation decisions. Scientia Iranica, 25(4), 2331–2346.https://doi.org/10.24200/sci.2017.4453.
  • Nobil, A. H., Afshar Sedigh, A. H., Tiwari, S., & Wee, H. M. (2019). An imperfect multi-item single-machine production system with shortage, rework, and scrap considering inspection, dissimilar deficiency levels, and non-zero setup times. Scientia Iranica, 26(1), 557–570. https://doi.org/10.24200/sci.2018.4984.1031.
  • Ogwueleka, A. C., & Udoudoh, F. P. (2018). The impact of risk and reward dynamics in incentive compensation plans in the nigerian construction industry. International Journal of Construction Management, 18(3), 247–259. https://doi.org/10.1080/15623599.2017.1315545
  • Peters, M. H., & Williams, W. W. (1984). Location of quality inspection stations: An experimental assessment of five normative heuristics. Decision Sciences, 15(3), 389–408. https://doi.org/10.1111/deci.1984.15.issue-3
  • Puterman, M. L. (1994). Markov decision processes: Discrete stochastic dynamic programming. New York: John Wiley and Sons, Inc.
  • Raz, T. (1986). A survey of models for allocating inspection effort in multistage production systems. Journal of Quality Technology, 18(4), 239–247. https://doi.org/10.1080/00224065.1986.11979018
  • Rezaei-Malek, M., Mohammadi, M., Dantan, J. Y., Siadat, A., & Tavakkoli-Moghaddam, R. (2018). A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system. The International Journal of Advanced Manufacturing Technology, 96(9-12), 3633–3650. https://doi.org/10.1007/s00170-018-1751-1
  • Richter, K. (1996a). The eoq repair and waste disposal model with variable setup numbers. European Journal of Operational Research, 95(2), 313–324. https://doi.org/10.1016/0377-2217(95)00276-6
  • Richter, K. (1996b). The extended EOQ repair and waste disposal model. International Journal of Production Economics, 45(1-3), 443–447. https://doi.org/10.1016/0925-5273(95)00143-3
  • Sabbadin, R., Spring, D., & Rabier, C. E. (2007). Dynamic reserve site selection under contagion risk of deforestation. Ecological Modelling, 201(1), 75–81. https://doi.org/10.1016/j.ecolmodel.2006.07.036
  • Salameh, M. K., Abdul-Malak, M. A. U., & Jaber, M. Y. (1993). Mathematical modelling of the effect of human learning in the finite production inventory model. Applied Mathematical Modelling, 17(11), 613–615. https://doi.org/10.1016/0307-904X(93)90070-W
  • Sarkar, B., Cardenas-Barron, L. E., Sarkar, M., & Singgih, M. L. (2014). An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, 33(3), 423–435. https://doi.org/10.1016/j.jmsy.2014.02.001
  • Satheeshkumar, R., & Elango, C. (2012). Markov decision processes in service facilities holding perishable inventory. Opsearch, 49(4), 348–365. https://doi.org/10.1007/s12597-012-0084-3
  • Schrady, D. A. (1967). A deterministic inventory model for repairable items. Naval Research Logistics, 14(3), 391–398. https://doi.org/10.1002/(ISSN)1931-9193.
  • Shetwan, A. G., Vitanov, V. I., & Tjahjono, B. (2011). Allocation of quality control stations in multistage manufacturing systems. Computers & Industrial Engineering, 60(4), 473–484. https://doi.org/10.1016/j.cie.2010.12.022
  • Shiau, Y. R., Lin, M., & Chuang, W. (2007). Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm. The International Journal of Advanced Manufacturing Technology, 33(7-8), 746–755. https://doi.org/10.1007/s00170-006-0486-6
  • Son, Y., Kim, T., & Omar, M. (2015). The beneficial effect of information sharing in a two-stage reverse supply chain. International Journal of Procurement Management, 8(6), 688–709. https://doi.org/10.1504/IJPM.2015.072387
  • Tahirov, N., Hasanov, P., & Jaber, M. Y. (2016). Optimization of closed-loop supply chain of multi-items with returned subassemblies. International Journal of Production Economics, 174, 1–10. https://doi.org/10.1016/j.ijpe.2016.01.004
  • Takagi, H., & Boguslavsky, L. (1991). A supplementary bibliography of books on queueing analysis and performance evaluation. Queueing Systems, 8(1), 313–322. https://doi.org/10.1007/BF02412258
  • Taleizadeh, A. A., Cardenas-Barron, L. E., & Mohammadi, B. (2014). A deterministic multi product single machine epq model with backordering, scraped products, rework and interruption in manufacturing process. International Journal of Production Economics, 150, 9–27. https://doi.org/10.1016/j.ijpe.2013.11.023
  • Taleizadeh, A. A., S. T. A. Niaki, & Najafi, A. A. (2010). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 233(8), 1834–1849. https://doi.org/10.1016/j.cam.2009.09.021
  • Tang, C. S. (1991). Designing an optimal production system with inspection. European Journal of Operational Research, 52(1), 45–54. https://doi.org/10.1016/0377-2217(91)90334-R
  • Tayi, G. K., & Ballou, D. P. (1988). An integrated production-inventory model with reprocessing and inspection. International Journal of Production Research, 26(8), 1299–1315. https://doi.org/10.1080/00207548808947947
  • Tijms, H. (1994). Stochastic models: An algorirhmic approach. New York: Wiley.
  • Trippi, R. R. (1974). An on-line computational model for inspection resource allocation. Journal of Quality Technology, 6(4), 167–174. https://doi.org/10.1080/00224065.1974.11980642
  • Veatch, M. H. (2000). Inspection strategies for multistage production systems with time-varying quality. International Journal of Production Research, 38(4), 837–853. https://doi.org/10.1080/002075400189185
  • Villalobos, J. R., Foster, J. W., & Disney, R. L. (1993). Flexible inspection systems for serial multi-stage production systems. IIE Transactions, 25(3), 16–26. https://doi.org/10.1080/07408179308964287
  • Viswanadham, N., & Narahari, Y. (1992). Performance modeling of automated manufacturing systems. Englewood Cliffs, NJ: Prentice Hall.
  • Viswanadham, N., Sharma, S., & Taneja, M. (1996). Inspection allocation in manufacturing systems using stochastic search techniques. IEEE Transactions on Systems, Man, and Cybernetics -- Part A: Systems and Humans, 26(2), 222–230. https://doi.org/10.1109/3468.485748
  • White, L. (1966). The analysis of a simple class of multistage inspection plans. Management Science, 12(9), 685–693. https://doi.org/10.1287/mnsc.12.9.685
  • Wright, T. P. (1936). Factors affecting the cost of airplanes. Journal of the Aeronautical Sciences, 3(4), 122–128. https://doi.org/10.2514/8.155
  • Yi, Y., & Wang, X. (2021). A Markov decision process for response adaptive designs. Econometrics and Statistics, 2452–3062.https://doi.org/10.1016/j.ecosta.2021.10.015.
  • Yum, B. J., & McDowell, E. D. (1981). The optional allocation of inspection effort in a class of nonserial production systems. AIIE Transactions, 13(4), 285–293. https://doi.org/10.1080/05695558108974564
  • Zanoni, S., Jaber, M. Y., & Zavanella, L. E. (2012). Vendor managed inventory (vmi) with consignment considering learning and forgetting effects. International Journal of Production Economics, 140(2), 721–730. https://doi.org/10.1016/j.ijpe.2011.08.018

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.