References
- Alessandrini, S. 1998. “Transition and Democracy in Romania: The Pains of a Gradualist Restructuring.” In Entrepreneurship and Economic Transition in Central Europe, edited by J. P. Larçon. Boston, MA: Springer. https://doi.org/10.1007/978-1-4615-6401-0_8
- Benjamin, L. M., and J. C. Greene. 2009. “From Program to Network: The Evaluator’s Role in Today’s Public Problem-Solving Environment.” American Journal of Evaluation 30 (3): 296–309.
- Benson, A. G. 2020. “Global Divergence in Nuclear Power Plant Construction: Their Role of Political Decentralization”, Working paper. Department of Economics, University of California, Irvine. https://cpb-us-e2.wpmucdn.com/sites.uci.edu/dist/3/3737/files/2020/12/AGB_JMP.pdf
- Berthelemy, M., and L. E. Rangel. 2015. “Nuclear Reactors’ Construction Costs: The Role of Lead-Time, Standardization and Technological Progress.” Energy Policy 82: 118–130.
- Brookes, N. J., and G. Locatelli. 2015. “Power Plants as Megaprojects: Using Empirics to Shape Policy, Planning, and Construction Management.” Utilities Policy 36: 57–66.
- Carajilescov, P., and J. Moreira. 2011. “Construction Time of PWRs”, 2011 International Nuclear Atlantic Conference. https://inis.iaea.org/collection/NCLCollectionStore/_Public/42/105/42105221.pdf
- Cohn, S. 1997. Too Cheap to Meter: An Economic and Philosophical Analysis of the Nuclear Dream. Albany, New York, NY: State University of New York Press, 127.
- Cooper, M. 2010. “Policy Challenges of Nuclear Reactor Construction, Cost Escalation and Crowding Out Alternatives.” http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.175.2423&rep=rep1&type=pdf
- Council of Europe Assembly. 2001. “Fifteen Years After Chernobyl: Financing a Lasting Solution.” http://assembly.coe.int/nw/xml/XRef/X2H-Xref-ViewHTML.asp?FileID=9241
- Csereklyei, Z., P. W. Thurner, A. Bauer, and H. Küchenhoff. 2016. “The Effect of Economic Growth, Oil Prices, and the Benefits of Reactor Standardization: Duration of Nuclear Power Plant Construction Revisited.” Energy Policy 91: 49–59.
- Dimitriou, H. T., E. J. Ward, and P. G. Wright. 2017. “Megaprojects and Mega Risks: Lessons for Decision-Makers of Large-Scale Transport Projects OMEGA Centre Lessons Derived from European, US and Asia-Pacific Case Studies.” In Socioeconomic Evaluation of Megaprojects: Dealing with Uncertainties, edited by M. Lehtonen, P.-B. Joly, and L. Aparicio, 44–61. Milton Park, Abingdon: Routledge.
- Grübler, A. 2010. “The Costs of the French Nuclear Scale-Up: A Case of Negative Learning by Doing.” Energy Policy 38: 5174–5188.
- Gunton, T. 2003. “Megaprojects and Regional Development: Pathologies in Project Planning.” Regional Studies 37 (5): 505–519.
- Flyvbjerg, B. 2014. “What You Should Know about Megaprojects and Why: An Overview.” Project Management Journal 45 (2): 6–19.
- International Atomic Energy Agency (IAEA). 1999. “Management of Delayed Nuclear Power Plant Projects.” IAEA-TECDOC-1110. https://www-pub.iaea.org/MTCD/Publications/PDF/te_1110_prn.pdf
- International Atomic Energy Agency (IAEA). 2008. “Restarting Delayed Nuclear Power Plant Projects.” IAEN Nuclear Energy Series No. NP.T-3.4. https://www-pub.iaea.org/MTCD/Publications/PDF/P_1324_web.pdf
- International Atomic Energy Agency (IAEA). 2021. Power Reactor Information System (PRIS) Database.
- Kasperski, T. 2018. “Ukraine Shor Country Report.” History of Nuclear Energy and Society Deliverable 3.6. http://www.honest2020.eu/sites/default/files/deliverables_24/UA.pdf.
- Kịbaroğlu, M. 2007. “Iran's Nuclear Ambitions from a Historical Perspective and the Attitude of the West.” Middle Eastern Studies 43 (2): 223–245.
- Koomey, J., and N. E. Hultman. 2007. “A Reactor-Level Analysis of Busbar Costs for US Nuclear Plants, 1970–2005.” Energy Policy 35 (11): 5630–5642.
- Komanoff, C. 1981. Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics. New York, NY: Van Norstrand Reinhold Company.
- Krautmann, A. C., and J. L. Solow. 1988. “Economies of Scale in Nuclear Power Generation.” Southern Economic Journal 55 (1): 70–85.
- Lehtonen, M., Joly, P.-B., and Aparicio, L. eds. 2017. Socioeconomic Evaluation of Megaprojects: Dealing with Uncertainties. Abingdon: Routledge.
- Lehtonen, M. 2019. “Ecological Economics and Megaproject Appraisal: Lessons from Megaproject Scholarship and Topics for a Research Programme.” Ecological Economics 159 (May): 148–156.
- Lehtonen, M. 2021. “NEA Framing Nuclear Megaproject ‘Pathologies’: Vices of the Modern Western Society?” Nuclear Technology 207 (9): 1329–1350.
- Lovering, J., A. Yip, and T. Nordhaus. 2016. “Historical Construction Costs of Global Nuclear Power Reactors.” Energy Policy 91: 371–382.
- NEA-OECD. 2020. “Unlocking Reduction in the Construction Costs of Nuclear: A Practical Guide for Stakeholders.” Nuclear Technology Development and Economics N°7530. https://www.oecd-nea.org/jcms/pl_30653/unlocking-reductions-in-the-construction-costs-of-nuclear
- Nuclear Engineering International. 2010. “How Rostov-2 Started Up.” World Survey: Russia. https://www.neimagazine.com/features/featurehow-rostov-2-started-up/
- NTI. 2008. “Russia Nuclear Power Chronology.” https://media.nti.org/pdfs/russia_power_development.pdf
- McClanahan, A. 2019. “The Case for Safe and Affordable Energy: The Community Fight against the William Zimmer Nuclear Power Plant, 1969–1985.” Ohio Valley History 19 (1): 44–72.
- Madureira, N. L. 2014. Key Concepts in Energy. New York, NY: Springer.
- Morgan, K. O. 2017. “Britain in the Seventies – Our Unfinest Hour?” Revue française de civilisation britannique 22 [Online], XXII-Hors série. https://doi.org/10.4000/rfcb.1662
- Ocampo, J. A. 2014. “The Latin American Debt Crisis in Historical Perspective” In Life After Debt. International Economic Association Series, edited by J. E. Stiglitz, and D. Heymann. London: Palgrave Macmillan.
- O’Donell, G. 1988. “Challenges to Democratization in Brazil.” World Policcy Journal 5 (2): 281–300. https://www.jstor.org/stable/pdf/40209083.pdf
- Priemus, H. 2010. “Mega-Projects: Dealing with Pitfalls.” European Planning Studies 18 (7): 1023–1039.
- Portugal-Pereira, J., P. Ferreira, J. C. Cunha, A. Szklo, R. Schaeffer, and M. Araujo. 2018. “Better Late Than Never, but Never Late is Better: Risk Assessment of Nuclear Power Construction Projects.” Energy Policy 120: 158–166.
- Posey, J. 1987. “Cloud Over Comanche Peak”, DMagazine. https://www.dmagazine.com/publications/d-magazine/1987/december/cloud-over-comanche-peak/
- Rubio-Varas, MdM., and J. De la Torre. 2016. “Spain- Eximbamk’s Billion Dollar Client: The Role of the US Financing the Spanish Nuclear Program.” In Electric Worlds. Creations, Circulations, Tensions, and Transitions, 19th-21st Centuries, edited by A. Beltran, L. Laborie, P. Lanthier, and S. Le Gallic, 245–270. Bern: Peter Lang.
- Rubio-Varas, M., J. De la Torre, and D. P. Connors. 2021. “The Atomic Business: Structures and Strategies.” Business History 1–18. https://doi.org/10.1080/00076791.2020.1856080
- Rubio-Varas, M. 2021. “The Changing Economic Context Influencing Nuclear Decisions.” In Engaging the Atom: The History of Nuclear Energy and Society in Europe from the 1950s to the Present, edited by A. Kaijser, M. Lehtonen, J.-H. Meyer, and M. Rubio-Varas. Morgantown, WV: West Virginia University Press.
- Sanderson, J. 2012. “Risk, Uncertainty and Governance in Megaprojects: A Critical Discussion of Alternative Explanations.” International Journal of Project Management 30 (4): 432–443.
- Sovacool, B. K., D. Nugent, and A. Gilbert. 2014. “Construction Costs Overruns and Electricity Infrastructure: An Unavoidable Risk?” The Electricity Journal 27 (4): 112–120.
- Sovacool, B. K., A. Gilbert, and D. Nugent. 2014a. “Risk, Innovation, Electricity Infrastructure and Construction Cost Overruns: Testing Six Hypotheses.” Energy 74: 906–917.
- Sovacool, B. K., A. Gilbert, and D. Nugent. 2014b. “An International Comparative Assessment of Construction Cost Overruns for Electricity Infrastructure.” Energy Research & Social Science 3: 152–160.
- Surrey, J., and S. Thomas. 1999. “The Chernobyl Replacement Project.” Energy & Environment 10 (3): 325–332.
- Taylor, S. 2016. The Fall and Rise of Nuclear Power in Britain: A History. Cambridge: UIT Cambridge Ltd.
- United States. Congressional Budged Office (Ehrlich, Everett M.). 1979. “Delays in Nuclear Reactor Licensing and Construction: The Possibilities for Reform (Washington, D.C.).” https://www.cbo.gov/sites/default/files/96th-congress-1979-1980/reports/79doc643.pdf
- United States. Nuclear Regulatory Commission (US-NCR). 1974. “Oder Extending Construction Completion Dates.” https://www.nrc.gov/docs/ML0223/ML022320613.pdf
- United States. Nuclear Regulatory Commission (US-NCR). 2021. “History of Watts Bar Unit 2 Reactivation.” https://www.nrc.gov/info-finder/reactors/wb/watts-bar/history.html
- Valach, J. 2001. “Completion of Mochovce 1 and 2 Nuclear Power Plant Project, Slovakia.” Conference: NUSIM 2000, Casta-Papiernicka (Slovakia), 15–17 March 2000. https://www.osti.gov/etdeweb/biblio/20547701
- van Marrewijk, A., S. R. Clegg, T. S. Pitsis, and M. Veenswijk. 2008. “Managing Public–Private Megaprojects: Paradoxes, Complexity, and Project Design.” International Journal of Project Management 26 (6): 591–600.
- Wilson, Lord of Deaton 2009. “UK Civil Nuclear Energy: What Lessons?” British Academy Review 13: 9–19. https://www.thebritishacademy.ac.uk/documents/772/04-nuclear.pdf
- Wearne, S. H. 2015. “Evolution of UK Contract Structure for Nuclear Power New Build,” University of Manchester, Working paper. https://www.research.manchester.ac.uk/portal/files/31961807/FULL_TEXT.PDF
- World Nuclear Association. 2017. “Nuclear Power Economics and Project Structuring.”http://www.world-nuclear.org/getmedia/84082691-786c-414f-8178-a26be866d8da/REPORT_Economics_Report_2017.pdf.aspx
- World Nuclear Association. 2018. “Lesson-Learning in Nuclear Construction Projects.” Report no. 2018/002. https://world-nuclear.org/getattachment/e9c28f2a-a335-48a8-aa4f-525471a6795a/REPORT-Lesson-learning-in-Nuclear-Construction.pdf.aspx