97
Views
0
CrossRef citations to date
0
Altmetric
Articles

BIM-based task planning method for wheeled-legged rebar binding robot

, , , , &
Pages 656-672 | Received 30 Nov 2023, Accepted 04 Mar 2024, Published online: 11 Mar 2024

References

  • Albers, J. T., & Hudock, S. D. (2007). Biomechanical assessment of three rebar tying techniques. International Journal of Occupational Safety and Ergonomics, 13, 279–289. https://doi.org/10.1080/10803548.2007.11076728
  • Bock, T. (2007). Construction robotics. Autonomous Robots, 22, 201–209. https://doi.org/10.1007/s10514-006-9008-5
  • Carpo, M. (2017). The second digital turn: Design beyond intelligence. London: MIT Press.
  • Cortsen, J., Rytz, J. A., Ellekilde, L.-P., Sølvason, D., & Petersen, H. G. (2014). Automated fabrication of double curved reinforcement structures for unique concrete buildings. Robotics and Autonomous Systems, 62, 1387–1397. https://doi.org/10.1016/j.robot.2014.06.004
  • Davtalab, O., Kazemian, A., & Khoshnevis, B. (2018). Perspectives on a BIM-integrated software platform for robotic construction through contour crafting. Automation in Construction, 89, 13–23. https://doi.org/10.1016/j.autcon.2018.01.006
  • Ding, L., Jiang, W., Zhou, Y., Zhou, C., & Liu, S. (2020). BIM-based task-level planning for robotic brick assembly through image-based 3D modeling. Advanced Engineering Informatics, 43, 100993. https://doi.org/10.1016/j.aei.2019.100993
  • Eastman, C. M. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. N J: Hoboken: John Wiley & Sons.
  • Gil, J. Y., & Kimmel, R. (2002). Efficient dilation, erosion, opening, and closing algorithms. IEEE Transactions on Pattern Analysis and Machine Intelligence, 24, 1606–1617. https://doi.org/10.1109/TPAMI.2002.1114852
  • Jin, J., Zhang, W., Li, F., Li, M., Shi, Y., Guo, Z., & Huang, Q. (2021). Robotic binding of rebar based on active perception and planning. Automation in Construction, 132, 103939. https://doi.org/10.1016/j.autcon.2021.103939
  • Kim, S., Peavy, M., Huang, P.-C., & Kim, K. (2021). Development of BIM-integrated construction robot task planning and simulation system. Automation in Construction, 127, 103720. https://doi.org/10.1016/j.autcon.2021.103720
  • Lee, K. C., Zheng, B., Li, H., & Lee, W.-C. (2007). Approaching the skyline in Z order. In Lee K. C, Zheng B, Li H, & Lee W.C (Eds.), VLDB (pp. 279–290).
  • Merat, F. (1987). Introduction to robotics: Mechanics and control. IEEE Journal on Robotics and Automation, 3, 166–166. https://doi.org/10.1109/JRA.1987.1087086
  • Mestre, J., Pupyrev, S., & Umboh, S. W. (2021). On the Extended TSP problem. https://doi.org/10.48550/arXiv.2107.07815
  • Momeni, M., Relefors, J., Khatry, A., Pettersson, L., Papadopoulos, A. V., & Nolte, T. (2022). Automated fabrication of reinforcement cages using a robotized production cell. Automation in Construction, 133, 103990. https://doi.org/10.1016/j.autcon.2021.103990
  • Ofori, G. (2000). Challenges of construction industries in developing countries: Lessons from various countries. In 2nd international conference on construction in developing countries: Challenges facing the construction industry in developing countries (pp. 15–17). Gaborone: Department of Building, National University of Singapore.
  • Poirier, E. A., Staub-French, S., & Forgues, D. (2015). Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research. Automation in Construction, 58, 74–84. https://doi.org/10.1016/j.autcon.2015.07.002
  • Potvin, J.-Y. (1996). Genetic algorithms for the traveling salesman problem. Annals of Operations Research, 63, 337–370. https://doi.org/10.1007/BF02125403
  • Shu, Zhan, Liu, Wenhao, Fu, Bailu, Li, Zheng, & He, Minjuan. (2022). Blockchain-enhanced trading systems for construction industry to control carbon emissions. Clean Technologies and Environmental Policy, 24(6), 1851–1870. http://doi.org/10.1007/s10098-022-02292-3
  • Sweet, R. (2018). The contractor who invented a construction robot. Construction Research and Innovation, 9, 9–12. https://doi.org/10.1080/20450249.2018.1442702
  • Turner, C. J., Oyekan, O., Stergioulas, L., & Griffin, D. (2021). Utilizing Industry 4.0 on the construction site: Challenges and opportunities. Ieee Transactions on Industrial Informatics, 17, 746–756. https://doi.org/10.1109/TII.2020.3002197
  • Vanlande, R., Nicolle, C., & Cruz, C. (2008). IFC and building lifecycle management. Automation in Construction, 18, 70–78. https://doi.org/10.1016/j.autcon.2008.05.001
  • Xie, D.-J., Zeng, L.-D., Xu, Z., Guo, S., Cui, G.-H., & Song, T. (2023). Base position planning of mobile manipulators for assembly tasks in construction environments. Advances in Manufacturing, 11, 93–110. https://doi.org/10.1007/s40436-022-00411-3
  • Zhao, X. (2017). A scientometric review of global BIM research: Analysis and visualization. Automation in Construction, 80, 37–47. https://doi.org/10.1016/j.autcon.2017.04.002

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.