REFERENCES
- Canadian Institute of Mining, Metallurgy and Petroleum. (2014). CIM definition standards for mineral resources & mineral reserves. https://mrmr.cim.org/media/1128/cim-definition-standards_2014.pdf
- Canadian Institute of Mining, Metallurgy and Petroleum. (2018). CIM mineral exploration best practice guidelines. https://mrmr.cim.org/media/1130/cim-mineral-exploration-bp-guidelines_2018.pdf
- Canadian Institute of Mining, Metallurgy and Petroleum. (2019). CIM estimation of mineral resources and mineral reserves best practices guidelines. https://mrmr.cim.org/media/1129/cim-mrmr-bp-guidelines_2019.pdf
- Carr, J. C., Beatson, R. K., Cherrie, J. B., Mitchell, T. J., Fright, W. R., McCallum, B. C., & Evans, T. R. (2001). Reconstruction and representation of 3D objects with radial basis functions. In Proceedings of the 28th Annual Conference on Computer Graphics and Interactive Techniques (pp. 67–76). Association for Computing Machinery. https://dl.acm.org/doi/10.1145/383259.383266
- Coombes, J. (2008). The art and science of resource estimation. Coombes Capability.
- Cowan, E. J. (2014). Overview - Geological interpretation and geological modelling, In Mineral resource and ore reserve estimation- The AusIMM guide to good practice (2nd ed.), Vol. 30, pp. 137–143. Monograph.
- Cowan, E. J., Beatson, R. K., Ross, H. J., Fright, W. R., McLennnan, T. J., Evans, T. R., Carr, J. C., Lane, R. G., Bright, D. V., Gillman, A. J., Oshust, P. A., & Titley, M. (2003). Practical implicit geological modelling. https://www.researchgate.net/publication/281685127_Practical_Implicit_Geological_Modelling.
- Dominy, S. C., Annels, A. E., Camm, G. S., Wheeler, P., & Barr, S. P. (1999). Geology in the resource and reserve estimation of narrow vein deposits. Explor Mining Geol, 6(4), 317–333.
- Dubé, B., Williamson, K., & Malo, M. (2002). Geology of the goldcorp Inc. high-grade zone, red lake mine, ontario: An update. Geological Survey of Canada. Current Research 2002-C26.
- Duke, J. H., & Hanna, P. J. (2014). Geological interpretation for resource modelling and estimation; in mineral resource and ore reserve estimation - the AusIMM guide to good practice, second addition. Monograph, 30, 144–153.
- Evans, L. (2014, June 25). How to critique resource estimates and where they “go off the rails” – part 2, potential mining pitfalls executive short course [Paper presentation]. PowerPoint Presentation.
- Glacken, I., Rondon, O., & Levett, J. (2023). Drill hole spacing analysis for classification and cost optimization – A critical review of techniques. In Proceedings of the Mineral Resource Estimation Conference (pp. 179–191). Aus Imm.
- Hall, B. (2014). Cut-off grades and optimising the strategic mine plan. Aus Imm Spectrum Series, 20.
- Isaaks, E. H., & Srivastava, R. M. (1989). An introduction to applied geostatistics. Oxford University Press.
- Karora Resources Inc. (2023). Beta hunt “golden button” in drill hole. Retrieved June 16, 2023, from https://www.karoraresources.com/beta-hunt-photo-gallery?o=0#gallery_gallery_0:160
- Lane, K. F. (1988). The economic definition of ore – cut-off grades in theory and practice. Mining Journal Books, Ltd.
- Potter, L. (2022). Snakes, ladders and seduction. A resource geologist’s perilous journey. https://www.youtube.com/watch?v=rA_LgShgowM
- Pressacco, R., Evans, L., & Postle, J. (2023a). “Reasonable prospects” in mineral resource estimation and reporting. CIM Journal, 14(2), 75–96. https://doi.org/10.1080/19236026.2022.2148594
- Pressacco, R., Landry, P., & Evans, L. (2023b, March 28). 26 common flaws encountered in mineral resource estimation. Presentation to the Professional Geoscientists of Ontario. https://register.gotowebinar.com/register/5775201749817977944
- Pressacco, R., & Roscoe, W. E. (2021). The checkerboard effect and mineral resource reporting of underground mineral resources. CIM Journal, 12(2), 47–59. https://doi.org/10.1080/19236026.2021.1902203
- Rendu, J. M. (2008). An introduction to cut-off grade estimation. Society for Mining, Metallurgy, and Exploration.
- Roscoe, W. E. (1996, April 29). Cutting curves for grade estimation and grade control in gold mines. Presentation to the 98th Annual CIM Annual General Meeting, Edmonton, Alberta.
- Roscoe, W. E. (2012). Cutting or capping of high assay values. Presentation to the Toronto Geological Discussion Group. Retrieved February 7, 2012, from https://www.tgdg.net/Resources/Documents/Roscoe_TGDG%20Feb%202012%20Roscoe.pdf
- Rossi, M. E., & Deutsch, C. V. (2014). Mineral resource estimation. Springer.
- Sinclair, A. J., & Blackwell, G. H. (2002). Applied mineral inventory estimation. Cambridge University Press.
- Webster, R. (2015). When is a mineral resource not a resource? CIM Magazine. https://mrmr.cim.org/en/library/magazine-articles/when-is-a-mineral-resource-not-a-resource/