102
Views
0
CrossRef citations to date
0
Altmetric
Research Article

An assessment of barriers to integrate lean six sigma and industry 4.0 in manufacturing environment: case based approach

, , , , &
Received 06 Mar 2023, Accepted 25 Mar 2024, Published online: 15 Apr 2024

References

  • Aggarwal, S., and M. K. Srivastava. 2019. “A Grey-Based DEMATEL Model for Building Collaborative Resilience in Supply Chain.” International Journal of Quality & Reliability Management 36 (8): 1409–1437. https://doi.org/10.1108/IJQRM-03-2018-0059.
  • Alnadi, M., and P. McLaughlin. 2021. “Critical Success Factors of Lean Six Sigma from leaders’ Perspective.” International Journal of Lean Six Sigma 12 (5): 1073–1088. https://doi.org/10.1108/IJLSS-06-2020-0079.
  • Ambekar, S., and M. Hudnurkar. 2017. “Factorial Structure for Six Sigma Project Barriers in Indian Manufacturing and Service Industries.” The TQM Journal 29 (5): 744–759. https://doi.org/10.1108/TQM-02-2017-0021.
  • Amjad, M. S., M. Z. Rafique, and M. A. Khan. 2021. “Modern Divulge in Production Optimization: An Implementation Framework of LARG Manufacturing with I4.0.” International Journal of Lean Six Sigma 12 (5): 992–1016. https://doi.org/10.1108/IJLSS-07-2020-0099.
  • Anvari, F., R. Edwards, and H. Agung. 2020. “Lean Six Sigma in Smart Factories Based on Industry 4.0.” International Journal of Emerging Trends in Electrical and Electronics 1:1–26. http://globalpublisher.org/ijetee-volume-1-issue-1/http://globalpublisher.org/journals-1002/www.globalpublisher.org.
  • Bai, C., and J. Sarkis. 2013. “A Grey-Based DEMATEL Model for Evaluating Business Process Management Critical Success Factors.” International Journal of Production Economics 146 (1): 281–292. https://doi.org/10.1016/j.ijpe.2013.07.011.
  • Bhat, V. S., S. Bhat, and E. V. Gijo. 2020. “Simulation-Based Lean Six Sigma for I4.0: An Action Research in the Process Industry.” International Journal of Quality & Reliability Management 38 (5): 1215–1245. https://doi.org/10.1108/IJQRM-05-2020-0167.
  • Buer, S. V., J. O. Strandhagen, and F. T. Chan. 2018. “The Link Between I4.0 and Lean Manufacturing: Mapping Current Research and Establishing a Research Agenda.” International Journal of Production Research 56 (8): 2924–2940. https://doi.org/10.1080/00207543.2018.1442945.
  • Chandra, M., F. Shahab, K. E. K. Vimal, and S. Rajak. 2022. “Selection for Additive Manufacturing Using Hybrid MCDM Technique Considering Sustainable Concepts.” Rapid Prototyping Journal 28 (7): 1297–1311. https://doi.org/10.1108/RPJ-06-2021-0155.
  • Chen, G., P. Wang, B. Feng, Y. Li, and D. Liu. 2020. “The Framework Design of Smart Factory in Discrete Manufacturing Industry Based on Cyber-Physical System.” International Journal of Computer Integrated Manufacturing 33 (1): 79–101. https://doi.org/10.1080/0951192X.2019.1699254.
  • Chiarini, A., and M. Kumar. 2021. “Lean Six Sigma and I4.0 Integration for Operational Excellence: Evidence from Italian Manufacturing Companies.” Production Planning and Control 32 (13): 1084–1101. https://doi.org/10.1080/09537287.2020.1784485.
  • Da Silva, V. L., J. L. Kovaleski, R. N. Pagani, J. D. M. Silva, and A. Corsi. 2020. “Implementation of Industry 4.0 Concept in Companies: Empirical Evidences.” International Journal of Computer Integrated Manufacturing 33 (4): 325–342. https://doi.org/10.1080/0951192X.2019.1699258.
  • Dwivedi, A., V. Shardeo, and A. Patil. 2021. “Analysis of Recovery Measures for Sustainable Freight Transportation.” Journal of Asia Business Studies 16 (3): 495–514. (In press). https://doi.org/10.1108/JABS-05-2021-0191.
  • Dyer, G. W., and A. L. Wilkins. 1991. “Better Stories, Not Better Constructs, to Generate Better Theory: A Rejoinder to Eisenhardt.” Academy of Management Journal 16 (3): 613–619. https://doi.org/10.5465/amr.1991.4279492.
  • Eisenhardt, K. M. 1989. “Building Theories from Case Study Research.” The Academy of Management Review 14 (4): 532–550. https://doi.org/10.2307/258557.
  • Frank, A. G., L. S. Dalenogare, and N. F. Ayala. 2019. “I4.0 Technologies: Implementation Patterns in Manufacturing Companies.” International Journal of Production Economics 210:15–26. https://doi.org/10.1016/j.ijpe.2019.01.004.
  • Gandhi, J., S. Thanki, and J. J. Thakkar. 2021. “An Investigation and Implementation Framework of Lean Green and Six Sigma (LG&Ss) Strategies for the Manufacturing Industry in India.” The TQM Journal 33 (8): 1705–1734. https://doi.org/10.1108/TQM-12-2020-0289.
  • Ghobakhloo, M., and M. Fathi. 2019. “Corporate Survival in I4.0 Era: The Enabling Role of Lean-Digitized Manufacturing.” Journal of Manufacturing Technology Management 31 (1): 1–30. https://doi.org/10.1108/JMTM-11-2018-0417.
  • Gupta, A., P. Sharma, A. Jain, H. Xue, S. C. Malik, and P. C. Jha. 2019. “An Integrated DEMATEL Six Sigma Hybrid Framework for Manufacturing Process Improvement.” Annals of Operations Research 322 (2): 713–753. https://doi.org/10.1007/s10479-019-03341-9.
  • Gutierrez-Gutierrez, L., S. de Leeuw, and R. Dubbers. 2016. “Logistics Services and Lean Six Sigma Implementation: A Case Study.” International Journal of Lean Six Sigma 7 (3): 324–342. https://doi.org/10.1108/IJLSS-05-2015-0019.
  • Karadayi-Usta, S. 2020. “An Interpretive Structural Analysis for I4.0 Adoption Challenges.” IEEE Transactions on Engineering Management 67 (3): 973–978. https://doi.org/10.1109/TEM.2018.2890443.
  • Ketokivi, M., and T. Choi. 2014. “Renaissance of Case Research as a Scientific Method.” Journal of Operations Management 32 (5): 232–240. https://doi.org/10.1016/j.jom.2014.03.004.
  • Khanzode, A. G., P. R. S. Sarma, and M. Goswami. 2021. “Modelling Interactions of Select Enablers of Lean Six-Sigma Considering Sustainability Implications: An Integrated Circular Economy and I4.0 Perspective.” Production Planning & Control 1–17. https://doi.org/10.1080/09537287.2021.1980908.
  • Kirkire, M. S., and S. B. Rane. 2017. “Evaluation of Success Factors for Medical Device Development Using Grey DEMATEL Approach.” Journal of Modelling in Management 12 (2): 204–223. https://doi.org/10.1108/JM2-09-2015-0062.
  • Kolberg, D., J. Knobloch, and D. Zühlke. 2017. “Towards a Lean Automation Interface for Workstations.” International Journal of Production Research 55 (10): 2845–2856. https://doi.org/10.1080/00207543.2016.1223384.
  • Letchumanan, L. T., H. Gholami, N. M. Yusof, N. H. A. B. Ngadiman, A. A. Salameh, D. Štreimikienė, and F. Cavallaro. 2022. “Analyzing the Factors Enabling Green Lean Six Sigma Implementation in the I4.0 Era.” Sustainability 14 (6): 3450. https://doi.org/10.3390/su14063450.
  • Li, S., G. C. Peng, and F. Xing. 2019. “Barriers of Embedding Big Data Solutions in Smart Factories: Insights from SAP Consultants.” Industrial Management & Data Systems Management 16 (2): 728–764. https://doi.org/10.1108/JM2-07-2019-0155.
  • McCutcheon, D. M., and J. R. Meredith. 1993. “Conducting Case Study Research in Operations Management.” Journal of Operations Management 11 (3): 239–256. https://doi.org/10.1016/0272-6963(93)90002-7.
  • Meredith, J. 1998. “Building Operations Management Theory Through Case and Field Research.” Journal of Operations Management 16 (4): 441–454. https://doi.org/10.1016/S0272-6963(98)00023-0.
  • Mrugalska, B., and M. K. Wyrwicka. 2017. “Towards Lean Production in I4.0.” Procedia Engineering 182:466–473. https://doi.org/10.1016/j.proeng.2017.03.135.
  • Narwane, V. S., R. D. Raut, B. B. Gardas, B. E. Narkhede, and A. Awasthi. 2022. “Examining Smart Manufacturing Challenges in the Context of Micro, Small and Medium Enterprises.” International Journal of Computer Integrated Manufacturing 35 (12): 1395–1412. https://doi.org/10.1080/0951192X.2022.2078508.
  • Nimawat, D., and B. D. Gidwani. 2021a. “Identification of Cause and Effect Relationships Among Barriers of I4.0 Using Decision-Making Trial and Evaluation Laboratory Method.” Benchmarking 28 (8): 2407–2431. https://doi.org/10.1108/BIJ-08-2020-0429.
  • Nordin, N., B. Md Deros, and D. Abd Wahab. 2010. “A Survey on Lean Manufacturing Implementation in Malaysian Automotive Industry.” International Journal of Innovation, Management and Technology 1 (4): 374–380.
  • Patel, A. S., and K. M. Patel. 2021. “Critical Review of Literature on Lean Six Sigma Methodology.” International Journal of Lean Six Sigma 12 (3): 627–674. https://doi.org/10.1108/IJLSS-04-2020-0043.
  • Pereira, A. C., J. Dinis-Carvalho, A. C. Alves, and P. Arezes. 2019. “How I4.0 Can Enhance Lean Practices.” FME Transactions 47 (4): 810–822. https://doi.org/10.5937/fmet1904810P.
  • Pongboonchai-Empl, T., J. Antony, J. A. Garza-Reyes, T. Komkowski, and G. L. Tortorella. 2023. “Integration of Industry 4.0 Technologies into Lean Six Sigma DMAIC: A Systematic Review.” Production Planning & Control 1–26. https://doi.org/10.1080/09537287.2023.2188496.
  • Prakash, S., S. Kumar, G. Soni, R. V. Mahto, and N. Pandey. 2021. “A Decade of the International Journal of Lean Six Sigma: Bibliometric Overview.” International Journal of Lean Six Sigma 13 (2): 295–341. https://doi.org/10.1108/IJLSS-12-2020-0219.
  • Rajak, S., P. Parthiban, and R. Dhanalakshmi. 2021. “Analyzing Barriers of Sustainable Transportation Systems in India Using Grey-DEMATEL Approach: A Supply Chain Perspective.” International Journal of Sustainable Engineering 14 (3): 419–432. https://doi.org/10.1080/19397038.2021.1929553.
  • Rajak, S., P. Parthiban, and R. Dhanalakshmi. 2021. “A DEA Model for Evaluation of Efficiency and Effectiveness of Sustainable Transportation Systems: A Supply Chain Perspective.” International Journal of Logistics Systems & Management 40 (2): 220–241. https://doi.org/10.1504/IJLSM.2021.118737.
  • Raj, A., G. Dwivedi, A. Sharma, A. B. Lopes de Sousa Jabbour, and S. Rajak. 2020. “Barriers to the Adoption of I4.0 Technologies in the Manufacturing Sector: An Inter-Country Comparative Perspective.” International Journal of Production Economics 224:224. https://doi.org/10.1016/j.ijpe.2019.107546.
  • Raji, I. O., E. Shevtshenko, T. Rossi, and F. Strozzi. 2021. “I4.0 Technologies As Enablers of Lean and Agile Supply Chain Strategies: An Exploratory Investigation.” International Journal of Logistics Management 32 (4): 1150–1189. https://doi.org/10.1108/IJLM-04-2020-0157.
  • Rathi, R., M. Singh, A. Kumar Verma, R. Singh Gurjar, A. Singh, and B. Samantha 2021. “Identification of Lean Six Sigma Barriers in Automobile Part Manufacturing Industry.” Materials Today: Proceedings, https://doi.org/10.1016/j.matpr.2021.05.221
  • Raval, S. J., R. Kant, and R. Shankar. 2021. “Analyzing the Critical Success Factors Influencing Lean Six Sigma Implementation: Fuzzy DEMATEL Approach.” Journal of Modelling in Management 16 (2): 728–764. https://doi.org/10.1108/JM2-07-2019-0155.
  • Riley, B. W., J. V. Kovach, and L. Carden. 2013. “Developing a Policies and Procedures Manual for a Consumer Lending Department: A Design for Six Sigma Case Study.” Engineering Management Journal 25 (3): 3–15. https://doi.org/10.1080/10429247.2013.11431978.
  • Ringen, G., and H. Holtskog. 2013. “How Enablers for Lean Product Development Motivate Engineers.” International Journal of Computer Integrated Manufacturing 26 (12): 1117–1127. https://doi.org/10.1080/0951192X.2011.593046.
  • Saxby, R., M. Cano-Kourouklis, and E. Viza. 2020. “An Initial Assessment of Lean Management Methods for I4.0.” The TQM Journal 32 (4): 587–601. https://doi.org/10.1108/TQM-12-2019-0298.
  • Shukla, V., V. Swarnakar, and A. R. Singh 2021. “Prioritization of Lean Six Sigma Project Selection Criteria Using the Best-Worst Method.” Materials Today: Proceedings, 47, 5749–5754.
  • Siggelkow, N. 2007. “Persuasion with Case Studies.” Academy of Management Journal 50 (1): 20–24. https://doi.org/10.5465/amj.2007.24160882.
  • Singh, M., P. Kumar, and R. Rathi. 2019. “Modelling the Barriers of Lean Six Sigma for Indian Micro-Small Medium Enterprises: An ISM and MICMAC Approach.” The TQM Journal 31 (5): 673–695. https://doi.org/10.1108/TQM-12-2018-0205.
  • Si, S. L., X. Y. You, H. C. Liu, and P. Zhang. 2018. “DEMATEL Technique: A Systematic Review of the State-Of-The-Art Literature on Methodologies and Applications.” In Mathematical Problems in Engineering, Vol.2018. Hindawi Limited. https://doi.org/10.1155/2018/3696457
  • Sony, M. 2020. “Design of Cyber Physical System Architecture for I4.0 Through Lean Six Sigma: Conceptual Foundations and Research Issues.” Production & Manufacturing Research 8 (1): 158–181. https://doi.org/10.1080/21693277.2020.1774814.
  • Sreedharan, V. R., and M. V. Sunder. 2018. “A Novel Approach to Lean Six Sigma Project Management: A Conceptual Framework and Empirical Application.” Production Planning & Control 29 (11): 895–907. https://doi.org/10.1080/09537287.2018.1492042.
  • Swarnakar, V. 2021. “Assessment of Critical Failure Factors for Implementing Lean Six Sigma in Manufacturing Industry: A Case Study.” International Journal of Industrial Engineering 3 (1): 1–17.
  • Swarnakar, V., Singh, A. R., Antony, J., Tiwari, A. K., & Cudney, E. 2021. Development of a conceptual method for sustainability assessment in manufacturing. Computers & Industrial Engineering, 158, 107403.
  • Swarnakar, V., and S. Vinodh. 2016. “Deploying Lean Six Sigma Framework in an Automotive Component Manufacturing Organization.” International Journal of Lean Six Sigma 7 (3): 267–293. https://doi.org/10.1108/IJLSS-06-2015-0023.
  • Tieng, K., C. Jeenanunta, P. Chea, and N. Rittippant. 2022. “Roles of Customers in Upgrading Manufacturing Firm Technological Capabilities Toward I4.0.” Engineering Management Journal 34 (2): 329–340. https://doi.org/10.1080/10429247.2021.1922219.
  • Tseng, M. L. 2009. “A Causal and Effect Decision Making Model of Service Quality Expectation Using Grey-Fuzzy DEMATEL Approach.” Expert Systems with Applications 36 (4): 7738–7748. https://doi.org/10.1016/j.eswa.2008.09.011.
  • Vinodh, S., and V. Swarnakar. 2015. “Lean Six Sigma Project Selection Using Hybrid Approach Based on Fuzzy DEMATEL–ANP–TOPSIS.” International Journal of Lean Six Sigma 6 (4): 313–338. https://doi.org/10.1108/IJLSS-12-2014-0041.
  • Voss, C., N. Tsikriktsis, and M. Frohlich. 2002. “Case Research in Operations Management.” International Journal of Operations and Production Management 22 (2): 195–219. https://doi.org/10.1108/01443570210414329.
  • Xia, X., K. Govindan, and Q. Zhu. 2015. “Analyzing Internal Barriers for Automotive Parts Remanufacturers in China Using Grey-DEMATEL Approach.” Journal of Cleaner Production 87 (1): 811–825. https://doi.org/10.1016/j.jclepro.2014.09.044.
  • Xing, F., G. Peng, J. Wang, and D. Li. 2022. “Critical Obstacles Affecting Adoption of Industrial Big Data Solutions in Smart Factories: An Empirical Study in China.” Journal of Global Information Management (JGIM) 30 (1): 1–21. https://doi.org/10.4018/JGIM.314789.
  • Yadav, G., and T. N. Desai. 2016. “Lean Six Sigma: A Categorized Review of the Literature.” International Journal of Lean Six Sigma 7 (1): 2–24. https://doi.org/10.1108/IJLSS-05-2015-0015.
  • Yadav, G., and T. N. Desai. 2017a. “Analyzing Lean Six Sigma Enablers: A Hybrid ISM-Fuzzy MICMAC Approach.” The TQM Journal 29 (3): 488–511. https://doi.org/10.1108/TQM-04-2016-0041.
  • Yadav, G., and T. N. Desai. 2017b. “A Fuzzy AHP Approach to Prioritize the Barriers of Integrated Lean Six Sigma.” International Journal of Quality and Reliability Management 34 (8): 1167–1185. https://doi.org/10.1108/IJQRM-01-2016-0010.
  • Yadav, G., A. Kumar, S. Luthra, J. A. Garza-Reyes, V. Kumar, and L. Batista. 2020. “A Framework to Achieve Sustainability in Manufacturing Organisations of Developing Economies Using Industry 4.0 technologies’ Enablers.” Computers in Industry 122:103280. https://doi.org/10.1016/j.compind.2020.103280.
  • Yadav, G., S. Luthra, D. Huisingh, S. K. Mangla, B. E. Narkhede, and Y. Liu. 2020. “Development of a Lean Manufacturing Framework to Enhance Its Adoption within Manufacturing Companies in Developing Economies.” Journal of Cleaner Production 245:118726. https://doi.org/10.1016/j.jclepro.2019.118726.
  • Yadav, N., R. Shankar, and S. P. Singh. 2021. “Hierarchy of Critical Success Factors (CSF) for Lean Six Sigma (LSS) in Quality 4.0.” International Journal of Global Business and Competitiveness 16 (1): 1–14. https://doi.org/10.1007/s42943-020-00018-0.
  • Yang, Y., and R. John 2003. “Grey Systems and Interval Valued Fuzzy Sets Computing with Words in Fuzzy Cognitive Maps View Project Multi-Fuzzy Sets View Project Grey Systems and Interval Valued Fuzzy Sets.” https://www.researchgate.net/publication/221399098.
  • Yin, R. K. 2014. Case Study Research: Design and Methods. Thousand Oaks, CA: Sage.
  • Zhang, L., B. E. Narkhede, and A. P. Chaple. 2017. “Evaluating lean manufacturing barriers: An interpretive process.” Journal of Manufacturing Technology Management 28 (8): 1086–1114. https://doi.org/10.1108/JMTM-04-2017-0071.
  • Zhu, X. Y., H. Zhang, and Z. G. Jiang. 2020. “Application of Green-Modified Value Stream Mapping to Integrate and Implement Lean and Green Practices: A Case Study.” International Journal of Computer Integrated Manufacturing 33 (7): 716–731. https://doi.org/10.1080/0951192X.2019.1667028.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.