112
Views
0
CrossRef citations to date
0
Altmetric
Research Articles

Prediction of geological composition using recurrent neural networks and shield tunnel boring machine data

, ORCID Icon, , , , & show all
Pages 252-266 | Received 12 Oct 2021, Accepted 16 Nov 2023, Published online: 23 Nov 2023

References

  • Chen, H., C. Xiao, Z. Yao, H. Jiang, T. Zhang, and Y. Guan. 2019. “Prediction of TBM Tunneling Parameters Through an LSTM Neural Network.” 2019 IEEE International Conference on Robotics and Biomimetics (ROBIO), pp. 702-707, IEEE.
  • Claesen, M., and B. De Moor. 2015. “Hyperparameter search in machine learning.” arXiv preprint arXiv:1502.02127.
  • Ding, C., and X. He. 2004. “K-Means Clustering via Principal Component Analysis.” Proceedings of the Twenty-First International Conference on Machine Learning. (p. 29). ACM.
  • Gao, X., M. Shi, X. Song, C. Zhang, and H. Zhang. 2019. “Recurrent Neural Networks for Real-Time Prediction of TBM Operating Parameters.” Automation in Construction 98: 225–235. https://doi.org/10.1016/j.autcon.2018.11.013.
  • Grasmick, J. G., M. A. Mooney, W. Trainor-Guitton, and G. Walton. 2020. “Global Versus Local Simulation of Geotechnical Parameters for Tunneling Projects.” Journal of Geotechnical and Geoenvironmental Engineering 146: 04020048. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002262.
  • Kaus, A., and W. Boening. 2008. “BEAM-Geoelectrical Ahead Monitoring for TBM-Drives.” Geomechanics and Tunnelling 1 (5). https://doi.org/10.1002/geot.200800048.
  • Kavoura, K., M. Kordouli, K. Nikolakopoulos, P. Elias, O. Sykioti, V. Tsagaris, and V. Anastasopoulos. 2014, August. “Subsurface Geological Modeling Using GIS and Remote Sensing Data: A Case Study from Platanos Landslide, Western Greece.” Second International Conference on Remote Sensing and Geoinformation of the Environment (RSCy2014) (Vol. 9229, p. 92290C). International Society for Optics and Photonics.
  • Kingma, D. P., and J. Ba. 2014. “Adam: A Method for Stochastic Optimization.” arXiv preprint arXiv:1412.6980.
  • Kneib, G., A. Kassel, and K. Lorenz. 2000. “Automatic Seismic Prediction Ahead of the Tunnel Boring Machine.” First Break 18 (7). https://doi.org/10.1046/j.1365-2397.2000.00079.x.
  • Leng, S., J. R. Lin, Z. Z. Hu, and X. Shen. 2020. “A Hybrid Data Mining Method for Tunnel Engineering Based on Real-Time Monitoring Data from Tunnel Boring Machines.” IEEE Access 8: 90430–90449. https://doi.org/10.1109/ACCESS.2020.2994115.
  • Ma, J., Y. Ding, V. J. Gan, C. Lin, and Z. Wan. 2019. “Spatiotemporal Prediction of PM2.5 Concentrations at Different Time Granularities Using IDW-BLSTM.” IEEE Access 7: 107897–107907. https://doi.org/10.1109/ACCESS.2019.2932445.
  • Mokhtari, S., W. Navidi, and M. A. Mooney. 2020. “White Box Regression (Elastic Net) Modeling of Earth Pressure Balance Shield Machine Advance Rate.” Automation in Construction 115 (103208).
  • Mooney, M. A., B. Walter, and C. Frenzel. 2012. “Real-time Tunnel Boring Machine Monitoring: A State of the art Review.” North American Tunnelling, 2012 proceedings, 73-81.
  • Northlink Tunnel Partners. 2009. “Geotechnical Baseline Report - Univerity Link 230.” Seattle, WA, Northlink Tunnel Partners. 6: 66.
  • Oliver, M. A., and R. Webster. 1990. “Kriging: A Method of Interpolation for Geographical Information Systems.” International Journal of Geographical Information System 4 (3): 313–332. https://doi.org/10.1080/02693799008941549.
  • Ozmutlu, S., and R. Hack. 2003. “3D Modeling System for Ground Engineering.” In New Paradigms in Subsurface Prediction: Characterization of the Shallow Subsurface Implications for Urban Infrastructure and Environmental Assessment, 253–226. Berlin, Heidelberg: Springer.
  • Schaeffer, K., and M. A. Mooney. 2016. “Examining the Influence of TBM-Ground Interaction on Electrical Resistivity Imaging Ahead of the TBM.” Tunnelling and Underground Space Technology 58: 82–98. https://doi.org/10.1016/j.tust.2016.04.003.
  • Shi, M., X. Song, and W. Sun. 2018. “Geology Prediction Based on Operation Data of TBM: Comparison between Deep Neural Network and Statistical Learning Methods.” arXiv preprint arXiv:1809.06688.
  • Sound Transit. 2016. “Northgate Link Extension Light Rail Project Contract N125: EPBM Tunnels - Geotechnical Baseline Report.” Folio for Northgate Link Extension. Retrieved from https://www.soundtransit.org/system-expansion/northgate-link-extension/documents (Accessed date: May 2019).
  • Sun, J., T. Li, M. Yu, and H. M. Zhang. 2018. “Exploring the Congestion Pattern at Long-Queued Tunnel sag and Increasing the Efficiency by Control.” IEEE Transactions on Intelligent Transportation Systems 19 (12): 3765–3774. https://doi.org/10.1109/TITS.2017.2780103.
  • Xiong, Z., J. Guo, Y. Xia, H. Lu, M. Wang, and S. Shi. 2018. “A 3D Multi-Scale Geology Modeling Method for Tunnel Engineering Risk Assessment.” Tunnelling and Underground Space Technology 73: 71–81. https://doi.org/10.1016/j.tust.2017.12.003.
  • Zhao, J., M. Shi, G. Hu, X. Song, C. Zhang, D. Tao, and W. Wu. 2019. “A Data-Driven Framework for Tunnel Geological-Type Prediction Based on TBM Operating Data.” IEEE Access 7: 66703–66713. https://doi.org/10.1109/ACCESS.2019.2917756.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.