115
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Impact of uncertainty ascribed to defective products on supply chains

ORCID Icon &
Received 13 Mar 2023, Accepted 02 Apr 2024, Published online: 10 Apr 2024

References

  • Almaraj, I. I., & Trafalis, T. B. (2019). An integrated multi-echelon robust closed-loop supply chain under imperfect quality production. International Journal of Production Economics, 218, 212–227. https://doi.org/10.1016/j.ijpe.2019.04.035
  • Almaraj, I. I., & Trafalis, T. B. (2022). A robust optimization approach in a multi-objective closed-loop supply chain model under imperfect quality production. Annals of Operations Research, 319(2), 1479–1505. https://doi.org/10.1007/s10479-021-04286-8
  • Arizono, I., & Takemoto, Y. (2012). A solution of contract problem in book trade supply chain systems based on distribution free approach. In T. Blecker, W. Kersten, & M. R. Christian (Eds.), Pioneering supply chain design: A comprehensive insight into emerging trends, technologies and applications (pp. 75–87). Josef Eul Verlag GmbH.
  • Cachon, G. P. (2003). Supply chain coordination with contract. In: Handbooks in operations research and management science, Vol. 11, 227–339. Amsterdam: Elsevier. https://doi.org/10.1016/S0927-0507(03)11006-7.
  • Cachon, G. P., & Lariviere, M. A. (2005). Supply chain coordination with revenue-sharing contracts: Strengths and limitations. Management Science, 51(1), 30–44. https://doi.org/10.1287/mnsc.1040.0215
  • Chao, G. H., Iravani, S. M. R., & Savaskan, R. C. (2009). Quality improvement incentive and product recall cost sharing contracts. Management Science, 55(7), 1122–1138. https://doi.org/10.1287/mnsc.1090.1008
  • Cogollo-Flórez, J. M., & Correa-Espinal, A. A. (2019). Analytical modelling of supply chain quality management coordination and integration: A literature review. Quality Management Journal, 26(2), 72–83. https://doi.org/10.1080/10686967.2019.1580553
  • Eroglu, G., & Ozdemir, G. (2007). An economic order quantity model with defective items and shortage. International Journal of Production Economics, 106(2), 544–549. https://doi.org/10.1016/j.ijpe.2006.06.015
  • Gao, C., Cheng, T. C. E., Shen, H., & Xu, L. (2016). Incentives for quality improvement effort coordination in supply chain with partial cost allocation contract. International Journal of Production Research, 54(20), 6216–6231. https://doi.org/10.1080/00207543.2016.1191691
  • Gu, B., Fu, Y., & Ye, J. (2021). Joint optimization and coordination of fresh product supply chains with quality-improvement effort and fresh-keeping effort. Quality Technology & Quantitative Management, 18(1), 20–38. https://doi.org/10.1080/16843703.2020.1748260
  • Hsu, J. T., & Hsu, L. F. (2013). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales return. International Journal of Production Economics, 143(1), 162–170. https://doi.org/10.1016/j.ijpe.2012.12.025
  • Hsu, J. T., & Hsu, L. F. (2014). A supplement to an EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales return. International Journal of Industrial Engineering Computations, 5(2), 199–210. https://doi.org/10.5267/j.ijiec.2014.2.001
  • Huang, C. K. (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning & Control, 13(4), 355–361. https://doi.org/10.1080/09537280110112424
  • Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics, 91(1), 91–98. https://doi.org/10.1016/S0925-5273(03)00220-2
  • Hu, H., Wu, Q., Zhang, Z., & Han, S. (2019). Effect of the manufacturer quality inspection policy on the supply chain decision-making and profits. Advances in Production Engineering & Management, 14(4), 472–482. https://doi.org/10.14743/apem2019.4.342
  • Kato, W., Arizono, I., & Takemoto, Y. (2018). A proposal of bargaining solution for cooperative contract in a supply chain. Journal of Intelligent Manufacturing, 29(3), 559–567. https://doi.org/10.1007/s10845-015-1140-7
  • Khan, M., & Jaber, M. Y. (2009, May 13-15). A simple three level supply chain with defective items”. Proceedings of International Conference on Industrial Engineering and Systems Management (IESM’09), Montreal, Canada.
  • Khan, M., Jaber, M. Y., Guiffrida, A. L., & Zolfaghari, S. (2011). A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132(1), 1–12. https://doi.org/10.1016/j.ijpe.2011.03.009
  • Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43(4), 546–558. https://doi.org/10.1287/mnsc.43.4.546
  • Lee, C. H., Rhee, B. D., & Cheng, T. C. E. (2013). Quality uncertainty and quality-compensation contract for supply chain coordination. European Journal of Operational Research, 228(3), 582–591. https://doi.org/10.1016/j.ejor.2013.02.027
  • Moinzadeh, K., & Lee, H. L. (1987). Continuous inventory model with constant resupply time and defective items. Naval Research Logistics, 34, 457–467. https://doi.org/10.1002/1520-6750(198708)34:4<457:AID-NAV3220340402>3.0.CO;2-O
  • Nagaraja, M., & Sosic, G. (2008). Game theoretic analysis of cooperation among supply chain agents: Review and extensions. European Journal of Operational Research, 187(3), 719–745. https://doi.org/10.1016/j.ejor.2006.05.045
  • Nash, J. F. (1950). The bargaining problem. Econometrica, 18(2), 155–162. https://doi.org/10.2307/1907266
  • Paknejad, M. K., Nasri, F., & Affisco, J. F. (1995). Defective units in a continuous rivew (s, Q) system. International Journal of Production Research, 33(10), 2767–2777. https://doi.org/10.1080/00207549508904844
  • Park, M. (2021). Optimal production policy for economic production lot-sizing model with preventive maintenance. Quality Technology & Quantitative Management, 18(1), 83–100. https://doi.org/10.1080/16843703.2020.1766740
  • Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34(1), 137–144. https://doi.org/10.1287/opre.34.1.137
  • Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production process. IIE Transactions, 18(1), 48–55. https://doi.org/10.1080/07408178608975329
  • Roth, A. (1979). Axiomatic models in bargaining. Springer-Verlag.
  • Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64(1–3), 59–64. https://doi.org/10.1016/S0925-5273(99)00044-4
  • Takemoto, Y., & Arizono, I. (2013). Collaborative sale contract in publishing supply chain. Innovation and Supply Chain Management, 7(2), 52–57. https://doi.org/10.14327/iscm.7.52
  • Takemoto, Y., & Arizono, I. (2020). Moral hazard problem and collaborative coordination in supply chain with capacity reservation contract. International Journal of Production Research, 58(8), 2510–2526. https://doi.org/10.1080/00207543.2019.1633027
  • Wu, K. S., & Ouyang, L. Y. (2001). Q, r, L) inventory model with defective items. Computer and Industrial Engineering, 39(1–2), 173–185. https://doi.org/10.1016/S0360-8352(00)00077-2
  • Xie, X., Dai, B., Du, Y., & Wang, C. (2021). Contract design in a supply chain with product recall and demand uncertainty. IEEE Transactions on Engineering Management, 70(1), 232–248. https://doi.org/10.1109/TEM.2021.3062279
  • Yoo, S. H., & Cheong, T. (2018). Quality improvement incentive strategies in a supply chain. Transportation Research Part E: Logistics & Transportation Review, 114, 331–342. https://doi.org/10.1016/j.tre.2018.01.005
  • Yu, H. F., & Chen, Y. (2018). An integrated inventory model for items with acceptable defective items under warranty and quality improvement investment. Quality Technology & Quantitative Management, 15(6), 702–715. https://doi.org/10.1080/16843703.2017.1335490
  • Zhang, N., Tian, S., Liu, B., & Zhang, J. (2023). Joint optimization of production lot-sizing and condition-based maintenance in an imperfect production process with dependent indicators. Quality Technology & Quantitative Management, 20(4), 511–527. https://doi.org/10.1080/16843703.2022.2126263