76
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Cyber-physical internet based intelligent operation platform for off-site construction supply chain management

, , , , &
Article: 2346743 | Received 21 Jan 2024, Accepted 20 Apr 2024, Published online: 28 Apr 2024

References

  • Ahn, S. J., S. Han, M. Sadiq Altaf, and M. Al-Hussein. 2022. “Integrating Off-Site and On-Site Panelized Construction Schedules Using Fleet Dispatching.” Automation in Construction 137:104201. https://doi.org/10.1016/j.autcon.2022.104201.
  • Almashaqbeh, M., and K. El-Rayes. 2021. “Optimizing the Prefabrication Finishing Level in Modular Construction.” Canadian Journal of Civil Engineering 48 (11): 1534–24. https://doi.org/10.1139/cjce-2020-034.
  • Anderl, R., S. Haag, K. Schützer, and E. Zancul. 2018. “Digital Twin Technology–An Approach for Industrie 4.0 Vertical and Horizontal Lifecycle Integration.” IT-Information Technology 60 (3): 125–132. https://doi.org/10.1515/itit-2017-0038.
  • Anumba, C. J., A. Akanmu, X. Yuan, and C. Kan. 2021. “Cyber-Physical Systems Development for Construction Applications.” Frontiers of Engineering Management 8 (1): 72–87. https://doi.org/10.1007/s42524-020-0130-4.
  • Arashpour, M., R. Wakefield, N. Blismas, and T. Maqsood. 2015. “Autonomous Production Tracking for Augmenting Output in Off-Site Construction.” Automation in Construction 53:13–21. https://doi.org/10.1016/j.autcon.2015.03.013.
  • Bao, J., D. Guo, J. Li, and J. Zhang. 2019. “The Modelling and Operations for the Digital Twin in the Context of Manufacturing.” Enterprise Information Systems 13 (4): 534–556. https://doi.org/10.1080/17517575.2018.1526324.
  • Bataglin, F. S., D. D. Viana, C. T. Formoso, and I. R. Bulhões. 2020. “Model for Planning and Controlling the Delivery and Assembly of Engineer-To-Order Prefabricated Building Systems: Exploring Synergies Between Lean and BIM.” Canadian Journal of Civil Engineering 47 (2): 165–177. https://doi.org/10.1139/cjce-2018-0462.
  • Bortolini, R., C. Torres Formoso, and D. D. Viana. 2019. “Site Logistics Planning and Control for Engineer-To-Order Prefabricated Building Systems Using BIM 4D Modeling.” Automation in Construction 98:248–264. https://doi.org/10.1016/j.autcon.2018.11.031.
  • Cheng, M.-Y., and N.-W. Chang. 2019. “Dynamic Construction Material Layout Planning Optimization Model by Integrating 4D BIM.” Engineering with Computers 35 (2): 703–720. https://doi.org/10.1007/s00366-018-0628-0.
  • Chen, K., G. Xu, F. Xue, R. Y. Zhong, D. Liu, and W. Lu. 2018. “A Physical Internet-Enabled Building Information Modelling System for Prefabricated Construction.” International Journal of Computer Integrated Manufacturing 31 (4–5): 349–361. https://doi.org/10.1080/0951192X.2017.1379095.
  • Daclin, N., D. Chen, and B. Vallespir. 2016. “Developing Enterprise Collaboration: A Methodology to Implement and Improve Interoperability.” Enterprise Information Systems 10 (5): 467–504. https://doi.org/10.1080/17517575.2014.932013.
  • Ellwein, C., A. Reichle, M. Herschel, and A. Verl. 2021. “Integrative Data Processing for Cyber-Physical Off-Site and On-Site Construction Promoting Co-Design.” Procedia CIRP 100:451–456. https://doi.org/10.1016/j.procir.2021.05.103.
  • Esmaeili, I., and D. Simeone. 2023. “A General Contractor’s Perspective on Construction Digital Twin: Implementation, Impacts and Challenges.” Buildings 13 (4): 978. https://doi.org/10.3390/buildings13040978.
  • Ezzeddine, A., and B. G. de Soto. 2021. “Connecting Teams in Modular Construction Projects Using Game Engine Technology.” Automation in Construction 132:103887. https://doi.org/10.1016/j.autcon.2021.103887.
  • Fei, T., H. Zhang, A. Liu, and A. Y. Nee. 2018. “Digital Twin in Industry: State-Of-The-Art.” IEEE Transactions on Industrial Informatics 15 (4): 2405–2415. https://doi.org/10.1109/TII.2018.2873186.
  • Hsu, P.-Y., M. Aurisicchio, and P. Angeloudis. 2020. “Optimal Logistics Planning for Modular Construction Using Multi-Stage Stochastic Programming.” Transportation Research Procedia 46:245–252. https://doi.org/10.1016/j.trpro.2020.03.187.
  • Huang, G. Q. 2022, Jul 12. “SynchroHub: Cyber-Physical Internet for Synchronizing Cross-Border Logistics Hubs in the Greater Bay Area (GBA).” University Grants Committee. Accessed January 1, 2024. https://www.ugc.edu.hk/eng/rgc/funding_opport/trs/funded_research/trs12_lay_sum.html#707_22.
  • Irizarry, J., E. P. Karan, and F. Jalaei. 2013. “Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management.” Automation in Construction 31:241–254. https://doi.org/10.1016/j.autcon.2012.12.005.
  • Jang, J. Y., J. In Kim, C. Koo, and T. Wan Kim. 2022. “Automated Components–Vehicle Allocation Planning for Precast Concrete Projects.” Journal of Management in Engineering 38 (6): 04022059. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001086.
  • Jiang, Y. S., X. Lai Liu, K. Kang, Z. Cheng Wang, R. Y. Zhong, and G. Q. Huang. 2021. “Blockchain-Enabled Cyber-Physical Smart Modular Integrated Construction.” Computers in Industry 133:103553. https://doi.org/10.1016/j.compind.2021.103553.
  • Jiang, F., L. Ma, T. Broyd, and K. Chen. 2021. “Digital Twin and Its Implementations in the Civil Engineering Sector.” Automation in Construction 130:103838. https://doi.org/10.1016/j.autcon.2021.103838.
  • Jiang, W. G., L. Yun Ding, and C. Zhou. 2021. “Cyber Physical System for Safety Management in Smart Construction Site.” Engineering, Construction & Architectural Management 28 (3): 788–808. https://doi.org/10.1108/ECAM-10-2019-0578.
  • Koubâa, A., and B. Andersson. 2009. “A Vision of Cyber-Physical Internet.” Paper presented at the 8th International Workshop on Real-Time Networks, Dublin, Ireland.
  • Lee, J., B. Bagheri, and H.-A. Kao. 2015. “A Cyber-Physical Systems Architecture for Industry 4.0-Based Manufacturing Systems.” Manufacturing Letters 3:18–23. https://doi.org/10.1016/j.mfglet.2014.12.001.
  • Lee, G. H., J. In Kim, C. Koo, and T. Wan Kim. 2022. “Automated Generation of Precast Concrete Slab Stacks for Transportation in Offsite Construction Projects.” Journal of Construction Engineering and Management 148 (8): 04022072. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002333.
  • Lee, D., and S. Lee. 2021. “Digital Twin for Supply Chain Coordination in Modular Construction.” Applied Sciences 11 (13): 5909. https://doi.org/10.3390/app11135909.
  • Lee, D., S. Lee, N. Masoud, M. S. Krishnan, and V. C. Li. 2021. “Integrated Digital Twin and Blockchain Framework to Support Accountable Information Sharing in Construction Projects.” Automation in Construction 127:103688. https://doi.org/10.1016/j.autcon.2021.103688.
  • Li, L. 2024. “Unveiling the Effects of Supply Chain Relationship Types on Enterprise Performance.” Enterprise Information Systems 18 (2). https://doi.org/10.1080/17517575.2023.2274141.
  • Lien, L.-C., and M.-Y. Cheng. 2014. “Particle Bee Algorithm for Tower Crane Layout with Material Quantity Supply and Demand Optimization.” Automation in Construction 45 (2014): 25–32. https://doi.org/10.1016/j.autcon.2014.05.002
  • Li, J., D. Greenwood, and M. Kassem. 2019. “Blockchain in the Built Environment and Construction Industry: A Systematic Review, Conceptual Models and Practical Use Cases.” Automation in Construction 102:288–307. https://doi.org/10.1016/j.autcon.2019.02.005.
  • Lindén, S., and P. Josephson. 2013. “In‐Housing or Out‐Sourcing On‐Site Materials Handling in Housing?” Journal of Engineering, Design & Technology 11 (1): 90–106. https://doi.org/10.1108/17260531311309152.
  • Lin, K., Y.-L. Xu, X. Lu, Z. Guan, and J. Li. 2021. “Digital Twin-Based Collapse Fragility Assessment of a Long-Span Cable-Stayed Bridge Under Strong Earthquakes.” Automation in Construction 123:103547. https://doi.org/10.1016/j.autcon.2020.103547.
  • Li, Y., J. Stephens, and A. Ryba. 2014. “Four-Dimensional Modelling on Tottenham Court Road Station, London, UK.” Proceedings of the Institution of Civil Engineers: Civil Engineering 167 (5): 33–40. https://doi.org/10.1680/cien.13.00019.
  • Mendhurwar, S., and R. Mishra. 2023. “‘Un’-Blocking the Industry 4.0 Value Chain with Cyber-Physical Social Thinking.” Enterprise Information Systems 17 (2). https://doi.org/10.1080/17517575.2021.1930189.
  • Mohamed, H., A. Darko, A. E. Eltoukhy, and T. Zayed. 2022. “Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach.” Journal of Construction Engineering and Management 148 (6): 04022022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002273.
  • Mohamed, H., A. Karam, A. E. Eltoukhy, A. Darko, and T. Zayed. 2023. “Optimized Multimodal Logistics Planning of Modular Integrated Construction Using Hybrid Multi-Agent and Metamodeling.” Automation in Construction 145:104637. https://doi.org/10.1016/j.autcon.2022.104637.
  • Moselhi, O., and T. Salama. 2015. “Near optimum selection of module configuration for efficient modular construction.” Modular and Offsite Construction (MOC) Summit Proceedings, 95–104. https://doi.org/10.29173/mocs50.
  • Rippon, J. A. 2011. “The Benefits and Limitations of Prefabricated Home Manufacturing in North America.” https://doi.org/10.14288/1.0103127.
  • Taherdoost, H., and M. Madanchian. 2023. “Using PROMETHEE Method for Multi-Criteria Decision Making: Applications and Procedures.” Iris Journal of Economics & Business Management 1 (1). https://doi.org/10.33552/IJEBM.2023.01.000502.
  • Tan, Y., B. Xue, and Y. Ting Cheung. 2017. “Relationships Between Main Contractors and Subcontractors and Their Impacts on Main Contractor Competitiveness: An Empirical Study in Hong Kong.” Journal of Construction Engineering and Management 143 (7): 05017007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001311.
  • Tao, G., H. Feng, J. Feng, and T. Wang. 2022. “Dynamic Multi-Objective Construction Site Layout Planning Based on BIM.” KSCE Journal of Civil Engineering 26 (4): 1522–1534. https://doi.org/10.1007/s12205-022-0708-y.
  • Teng, Y., C. Mao, G. Liu, and X. Wang. 2017. “Analysis of Stakeholder Relationships in the Industry Chain of Industrialized Building in China.” Journal of Cleaner Production 152:387–398. https://doi.org/10.1016/j.jclepro.2017.03.094.
  • Tsang, Y. P., C. K. M. L. Youqing Fan, and H. C. W. Lau. 2024. “Blockchain Sharding for E-Commerce Supply Chain Performance Analytics Towards Industry 5.0.” Enterprise Information Systems. https://doi.org/10.1080/17517575.2024.2311807.
  • Wang, Q., Z. G. Chuxiong Shen, K. Zhu, J. Zhang, and M. Huang. 2023. “Research on the Barriers and Strategies to Promote Prefabricated Buildings in China.” Buildings 13 (5): 1200. https://doi.org/10.3390/buildings13051200.
  • Wang, J., P. Gao, J. Zhang, C. Lu, and B. Shen. 2023. “Knowledge Augmented Broad Learning System for Computer Vision Based Mixed-Type Defect Detection in Semiconductor Manufacturing.” Robotics and Computer-Integrated Manufacturing 81:102513. https://doi.org/10.1016/j.rcim.2022.102513.
  • Wang, Z., H. Hu, and J. Gong. 2018. “Simulation Based Multiple Disturbances Evaluation in the Precast Supply Chain for Improved Disturbance Prevention.” Journal of Cleaner Production 177:232–244. https://doi.org/10.1016/j.jclepro.2017.12.188.
  • Wang, Z., H. Hu, J. Gong, X. Ma, and W. Xiong. 2019. “Precast Supply Chain Management in Off-Site Construction: A Critical Literature Review.” Journal of Cleaner Production 232:1204–1217. https://doi.org/10.1016/j.jclepro.2019.05.229.
  • Wang, Z., T. Wang, H. Hu, J. Gong, X. Ren, and Q. Xiao. 2020. “Blockchain-Based Framework for Improving Supply Chain Traceability and Information Sharing in Precast Construction.” Automation in Construction 111:103063. https://doi.org/10.1016/j.autcon.2019.103063.
  • Wang, L., and Y. Zhang. 2021. “Linear Approximation Fuzzy Model for Fault Detection in Cyber-Physical System for Supply Chain Management.” Enterprise Information Systems 15 (7): 966–983. https://doi.org/10.1080/17517575.2020.1791361.
  • Wei, W., L. Shen, Z. Zhao, A. Rachana Harish, R. Y. Zhong, and G. Q. Huang. 2023. “Internet of Everything and Digital Twin Enabled Service Platform for Cold Chain Logistics.” Journal of Industrial Information Integration 33:100443–100443. https://doi.org/10.1016/j.jii.2023.100443.
  • Xiao, J., W. Zhang, and R. Y. Zhong. 2023. “Blockchain-Enabled Cyber-Physical System for Construction Site Management: A Pilot Implementation.” Advanced Engineering Informatics 57:102102. https://doi.org/10.1016/j.aei.2023.102102.
  • Xia, M., L. Zhao, Y. Qiao, Z. Yuan, Y. Cui, L. Zhao, and J. Li. 2021. “Analysis of Factors Affecting the Quality of Precast Components Based on Structural Equation Modeling.” Arabian Journal for Science & Engineering 47 (4): 4171–4185. https://doi.org/10.1007/s13369-021-05991-z.
  • Xu, G., M. Li, L. Luo, C.-H. Chen, and G. Q. Huang. 2019. “Cloud-Based Fleet Management for Prefabrication Transportation.” Enterprise Information Systems 13 (1): 87–106. https://doi.org/10.1080/17517575.2018.1455109.
  • Yang, Y., M. Pan, W. Pan, and Z. Zhang. 2021. “Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects.” Journal of Management in Engineering 37 (3): 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905.
  • Yi, W., R. Phipps, and H. Wang. 2020. “Sustainable Ship Loading Planning for Prefabricated Products in the Construction Industry.” Sustainability 12 (21): 8905. https://doi.org/10.3390/su12218905.
  • Yitmen, I., S. Alizadehsalehi, İ. Akıner, and M. Ernur Akıner. 2021. “An Adapted Model of Cognitive Digital Twins for Building Lifecycle Management.” Applied Sciences 11 (9): 4276. https://doi.org/10.3390/app11094276.
  • Yi, W., S. Wang, and A. Zhang. 2020. “Optimal Transportation Planning for Prefabricated Products in Construction.” Computer‐Aided Civil and Infrastructure Engineering 35 (4): 342–353. https://doi.org/10.1111/mice.12504.
  • Yi, W., S. Wu, L. Zhen, and G. Chawynski. 2021. “Bi-Level Programming Subsidy Design for Promoting Sustainable Prefabricated Product Logistics.” Cleaner Logistics and Supply Chain 1:100005. https://doi.org/10.1016/j.clscn.2021.100005.
  • Yu, T., Q. Man, Y. Wang, G. Qiping Shen, J. Hong, J. Zhang, and J. Zhong. 2019. “Evaluating Different Stakeholder Impacts on the Occurrence of Quality Defects in Offsite Construction Projects: A Bayesian-Network-Based Model.” Journal of Cleaner Production 241:118390. https://doi.org/10.1016/j.jclepro.2019.118390.
  • Zhai, Y., R. Y. Zhong, and G. Q. Huang. 2015. “Towards Operational Hedging for Logistics Uncertainty Management in Prefabrication Construction.” IFAC-Papersonline 48 (3): 1128–1133. https://doi.org/10.1016/j.ifacol.2015.06.235.
  • Zhang, S., X. Rong, B. Bakhtawar, S. Tariq, and T. Zayed. 2021. “Assessment of Feasibility, Challenges, and Critical Success Factors of MiC Projects in Hong Kong.” Journal of Architectural Engineering 27 (1). https://doi.org/10.1061/(ASCE)AE.1943-5568.0000452.
  • Zhang, H., and L. Yu. 2020. “Dynamic Transportation Planning for Prefabricated Component Supply Chain.” Engineering, Construction & Architectural Management 27 (9): 2553–2576. https://doi.org/10.1108/ECAM-12-2019-0674.
  • Zhao, S., R. Y. Zhong, J. Wang, C. Xu, and J. Zhang. 2023. “Unsupervised Fabric Defects Detection Based on Spatial Domain Saliency and Features Clustering.” Computers & Industrial Engineering 185:109681. https://doi.org/10.1016/j.cie.2023.109681.
  • Zhou, Y., X. Wei, and Y. Peng. 2021. “The Modelling of Digital Twins Technology in the Construction Process of Prefabricated Buildings.” Advances in Civil Engineering 2021:1–11. https://doi.org/10.1155/2021/2801557.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.