1,914
Views
0
CrossRef citations to date
0
Altmetric
Production & Manufacturing

A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Perú

, , , , ORCID Icon &
Article: 2236838 | Received 22 Oct 2022, Accepted 11 Jul 2023, Published online: 30 Jul 2023

References

  • Abioye, S. O., Oyedele, L. O., Akanbi, L., Ajayi, A., Davila Delgado, J. M., Bilal, M., Akinade, O. O., & Ahmed, A. (2021). Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges. Journal of Building Engineering, 44, 103299. https://doi.org/10.1016/J.JOBE.2021.103299
  • Adesta, E. Y. T., Prabowo, H. A., & Agusman, D. (2018). Evaluating 8 pillars of total productive maintenance (TPM) implementation and their contribution to manufacturing performance. IOP Conference Series: Materials Science and Engineering. https://doi.org/10.1088/1757-899X/290/1/012024
  • Ansah, R., Sorooshian, S., & Shariman, M. (2016). Lean construction tools. Science and Engineering Ethics, 23(4), 1237–21. https://doi.org/10.1007/s11948-016-9815-9
  • Aslam, M., Gao, Z., & Smith, G. (2020). Exploring factors for implementing lean construction for rapid initial successes in construction. Journal of Cleaner Production, 277, 123295. https://doi.org/10.1016/j.jclepro.2020.123295
  • Bajaj, M., Zwemer, D., & Cole, B. (2016). Architecture to geometry - Integrating system models with mechanical design. AIAA Space and Astronautics Forum and Exposition, SPACE 2016. https://doi.org/10.2514/6.2016-5470
  • Bajjou, M. S., Chafi, A., Ennadi, A., & El Hammoumi, M. (2017). The practical relationships between lean construction tools and sustainable development: A literature review. Journal of Engineering Science and Technology Review, 10(4), 170–177. https://doi.org/10.25103/JESTR.104.20
  • Bhoir, S., & Esmaeili, B. (2015). State-of-the-art review of virtual reality environment applications in construction safety. AEI 2015: Birth and Life of the Integrated Building - Proceedings of the AEI Conference 2015, 457–468. https://doi.org/10.1061/9780784479070.040
  • Bigham, G. F., Adamtey, S., Onsarigo, L., & Jha, N. (2018). Artificial intelligence for construction safety: mitigation of the risk of fall. Advances in Intelligent Systems & Computing, 869, 1024–1037. https://doi.org/10.1007/978-3-030-01057-7_76/COVER
  • Brady, D. A., Tzortzopoulos, P., Rooke, J., Formoso, C. T., & Tezel, A. (2018). Improving transparency in construction management: A visual planning and control model. Engineering, Construction & Architectural Management, 25(10), 1277–1297. https://doi.org/10.1108/ECAM-07-2017-0122
  • Cabrera, O., Tejeda, J., Llontop, J., Alvarez, J., & Demirkesen, S. (2022). Conceptual model to reduce non-contributory time based on Lean tools in the construction industry. Proceedings of the 8th International Engineering, Sciences and Technology Conference (IESTEC), 19-21 October, Panama. https://doi.org/10.1109/IESTEC54539.2022.00026
  • Chen, A., Golparvar-Fard, M., & Kleiner, B. (2014). SAVES: An Augmented virtuality strategy for training construction hazard recognition. https://doi.org/10.1061/9780784413517.238
  • Cortez, M. M., & Alan Ittyeipe, J. (2021). Construction waste production in macroeconomic context. IOP Conference Series: Materials Science & Engineering, 1203(2), 22080. https://doi.org/10.1088/1757-899X/1203/2/022080
  • Dakhli, Z., & Lafhaj, Z. (2018). Considering materials management in construction: An exploratory study. Logistics, 2(1), 7. https://doi.org/10.3390/logistics2010007
  • Demirkesen, S., & Gokberk Bayhan, H. (2019). Critical success factors of lean implementation in the construction industry. IEEE Transactions on Engineering Management, PP, 1–17. https://doi.org/10.1109/TEM.2019.2945018
  • Demirkesen, S., Sadikoglu, E., & Jayamanne, E. (2020). Investigating effectiveness of time studies in lean construction projects: Case of Transbay Block 8. https://doi.org/10.1080/09537287.2020.1859151
  • El Peruano. (2021, May). El sector construcción genera más de un millón de empleos al año. https://elperuano.pe/noticia/121379-el-sector-construccion-genera-mas-de-un-millon-de-empleos-al-ano
  • Emuze, F., Masoga, T., & Sebetlele, C. (2017). Lean opportunity assessment of contractors’ supply chain in South Africa. IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction, 789–796. https://doi.org/10.24928/2017/0052
  • Enshassi, A., Saleh, N., & Mohamed, S. (2019). Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction, 24(3), 274–293. https://doi.org/10.1108/JFMPC-08-2018-0047
  • Gabor, T., Belzner, L., Kiermeier, M., Beck, M. T., & Neitz, A. (2016). A simulation-based architecture for smart cyber-physical systems. Proceedings - 2016 IEEE International Conference on Autonomic Computing, ICAC 2016, 374–379. https://doi.org/10.1109/ICAC.2016.29
  • Gjerde, M. R. D., Ratnayake, R. M. C., & Samarakoon, S. M. S. M. K. (2019). Effective implementation of last planner system® in construction projects: A case study. IEEE International Conference on Industrial Engineering and Engineering Management, 1139–1144. https://doi.org/10.1109/IEEM44572.2019.8978719
  • Goh, M., & Goh, Y. M. (2019). Lean production theory-based simulation of modular construction processes. Automation in Construction, 101, 227–244. https://doi.org/10.1016/j.autcon.2018.12.017
  • Grieves, M. W. (2019). Virtually intelligent product systems: Digital and physical twins. Complex Systems Engineering: Theory and Practice, 175–200. https://doi.org/10.2514/5.9781624105654.0175.0200
  • Heravi, G., Kebria, M. F., & Rostami, M. (2019). Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction & Architectural Management, 28(1), 174–195. https://doi.org/10.1108/ECAM-03-2019-0133
  • Hossain, M. A., Bissenova, A., & Kim, J. R. (2019). Investigation of wasteful activities using lean methodology: In perspective of kazakhstan’s construction industry. Buildings, 9(5), 113. https://doi.org/10.3390/BUILDINGS9050113
  • INEI. (2020). Producción y Empleo Informal en el Perú. 59.
  • INEI. (2021). Ocupados a nivel nacional alcanza 16 millones 848 mil 600 personas en el II trimestre de 2021. https://www.inei.gob.pe/prensa/noticias/ocupados-a-nivel-nacional-alcanza-16-millones-848-mil-600-personas-en-el-ii-trimestre-de-2021-13058/
  • Isikdag, U. (2019). An Evaluation of Barriers to E-Procurement in Turkish Construction Industry. https://www.researchgate.net/publication/331331543_An_evaluation_of_barriers_to_E-Procurement_in_Turkish_construction_industry
  • Janani, R., & Kaveri, V. (2020). A critical literature review on reuse and recycling of construction waste in construction industry. Materials Today: Proceedings, 37(Part 2), 3077–3081. https://doi.org/10.1016/J.MATPR.2020.09.015
  • Jiménez, M., Romero, L., Fernández, J., Espinosa, M. D. M., & Domínguez, M. (2019). Extension of the lean 5S methodology to 6S with an additional layer to ensure occupational safety and health levels. Sustainability, 11(14), 3827. https://doi.org/10.3390/su11143827
  • Kaewunruen, S., & Xu, N. (2018). Digital twin for sustainability evaluation of railway station buildings. Frontiers in Built Environment, 4, 77. https://doi.org/10.3389/fbuil.2018.00077
  • Kan, C., & Anumba, C. J. (2019). Digital twins as the next phase of cyber-physical systems in construction. Computing in Civil Engineering 2019: Data, Sensing, and Analytics - Selected Papers from the ASCE International Conference on Computing in Civil Engineering 2019, 256–264. https://doi.org/10.1061/9780784482438.033
  • Krafcik, J. F. (1998). Triumph of the Lean Production System. https://edisciplinas.usp.br/pluginfile.php/5373958/mod_resource/content/4/krafcik_TEXTO_INTEGRAL.pdf
  • Le, Q. T., Pedro, A., & Park, C. S. (2015). A social virtual reality based construction safety education system for experiential learning. Journal of Intelligent and Robotic Systems: Theory and Applications, 79(3–4), 487–506. https://doi.org/10.1007/s10846-014-0112-z
  • Liu, M., Fang, S., Dong, H., & Xu, C. (2021). Review of digital twin about concepts, technologies, and industrial applications. Journal of Manufacturing Systems, 58, 346–361. https://doi.org/10.1016/J.JMSY.2020.06.017
  • Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, W. (2019). Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability, 11(13), 3638. https://doi.org/10.3390/SU11133638
  • Mahraj, U., Golam, S., & Mohammad, M. (2021). Enhancing OEE as a key metric of TPM approach-a practical analysis in garments industries. European Journal of Engineering and Technology Research, 5–6. https://www.ejers.org/index.php/ejers/article/view/2376/1055
  • Martim, B., Da, B., & Etges, S. (2018). Value-adding activities level in Brazilian infrastructure construction companies-9 cases study. Proceedings of the 26th Annual Conference of the International Group for Lean Construction (pp. 1323–1333). https://do.org//10.24928/2018/0252
  • Mateev, M. (2020). Industry 4.0 and the digital twin for building industry. International Scientific Journals. https://stumejournals.com/journals/i4/2020/1/pdf
  • Moussaoui, S. E., Lafhaj, Z., Leite, F., Fléchard, J., & Linéatte, B. (2021). Construction logistics centres proposing kitting service: Organization analysis and cost mapping. 11(3), 105. https://doi.org/10.3390/buildings
  • Özdemir, V., & Hekim, N. (2018). Birth of Industry 5.0: Making sense of big data with artificial intelligence, “the internet of things” and next-generation technology policy. OMICS: A Journal of Integrative Biology, 22(1), 65–76. https://doi.org/10.1089/omi.2017.0194
  • Palomino, V., Tokumori, W., Castro, R., Raymundo, I., & Dominguez, F. (2022). TPM maintenance management model focused on reliability that enables the increase of the availability of heavy equipment in the construction sector. https://doi.org/10.1088/1757-899X/796/1/012008
  • Palomino-Valles, A., Tokumori-Wong, M., Castro-Rangel, P., Raymundo-Ibañez, C., & Dominguez, F. (2020). TPM maintenance management model focused on reliability that enables the increase of the availability of heavy equipment in the construction sector. IOP Conference Series: Materials Science & Engineering, 796(1).
  • Park, C. S., & Kim, H. J. (2013). A framework for construction safety management and visualization system. Automation in Construction, 33, 95–103. https://doi.org/10.1016/J.AUTCON.2012.09.012
  • Pekarcikova, M., Trebuna, P., Kliment, M., Mizerak, M., & Kral, S. (2021). Simulation testing of the e-kanban to increase the efficiency of logistics processes. International Journal of Simulation Modelling, 20(1), 134–145. https://doi.org/10.2507/IJSIMM20-1-551
  • Pekarcikova, M. ;, Trebuna, P. , Kliment, M., Rosocha, L. (2020). MATERIAL FLOW OPTIMIZATION THROUGH E-KANBAN SYSTEM SIMULATION. International Journal of Simulation Modelling, 19(2), 243–254. https://doi.org/10.2507/IJSIMM19-2-513
  • Piew, F. (2020). Business sustainability through technology management approach for construction company. International Journal of Emerging Trends in Engineering Researc, 8(11), 22–26. https://doi.org/10.30534/ijeter/2020/0481.12020
  • Pinto, G., Silva, F. J. G., Fernandes, N. O., Casais, R., Baptista, A., & Carvalho, C. (2020). Implementing a maintenance strategic plan using TPM methodology. International Journal of Industrial Engineering and Management, 11(3), 192–204. https://doi.org/10.24867/IJIEM-2020-3-264
  • Pons, J. F., & Rubio, I. (2019). Lean construction y la planificación colaborativa metodología del last planner system ( Consejo General de la Arquitectura Técnica de España (ed.)). https://www.cgate.es/pdf/LEANCONSTRUCTIONPDFWeb.pdf
  • Rizkya, I., Sari, R. M., Syahputri, K., & Tarigan, U. (2021). Evaluation of total productive maintenance implementation in manufacture. IOP Conference Series: Materials Science & Engineering, 1122(1), 012059. https://doi.org/10.1088/1757-899X/1122/1/012059
  • Rojas, A., & Gisbert, V. (2017). Lean Manufacturing: Tools to improve productivity in businesses. 3C Empresa, 116–124. http://dx.doi.org/10.17993/3cemp.2017.especial.116-124
  • Rubio, I., & Pons, J. F. (2021). LEAN CONSTRUCTION, LAS 10 CLAVES DEL ÉXITO PARA SU IMPLANTACIÓN (Consejo General de la Arquitectura Técnica (1era Edicióned)., de España (Ed.). https://www.cgate.es/pdf/LEANCONSTRUCTIONII.pdf
  • Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020). Construction with digital twin information systems. Data-Centric Engineering, 1(6), e14. https://doi.org/10.1017/DCE.2020.16
  • Schluse, M., & Rossmann, J. (2016). From simulation to experimentable digital twins: Simulation-based development and operation of complex technical systems. ISSE 2016 - 2016 International Symposium on Systems Engineering - Proceedings Papers. https://doi.org/10.1109/SYSENG.2016.7753162
  • Semrau, J., & Horzela, A. (2021). Using tools to improve logistics and production processes in a selected construction company development strategy as an innovative tool for managing an organization view project research on corporate social responsibility (CSR) in the context of cluster activities view project using tools to improve logistics and production processes in a selected construction company. European Research Studies Journal, XXIV(1), 1211–1232. https://doi.org/10.35808/ersj/2100
  • Shinde, D. D., & Prasad, R. (2017). Application of AHP for ranking of total productive maintenance pillars. Wireless Personal Communications, 100(2), 449–462. https://doi.org/10.1007/S11277-017-5084-4
  • Tao, F., Zhang, H., Liu, A., & Nee, A. Y. C. (2019). Digital twin in industry: State-of-the-art. IEEE Transactions on Industrial Informatics, 15(4), 2405–2415. https://doi.org/10.1109/TII.2018.2873186
  • Teisserenc, B., & Sepasgozar, S. (2021). Adoption of Blockchain Technology through Digital Twins in the Construction Industry 4.0: A PESTELS. Approach Buildings, 11(12), 670. https://doi.org/10.3390/buildings11120670
  • Tetik, M., Peltokorpi, A., Seppänen, O., Leväniemi, M., & Holmström, J. (2020). Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1), 05020020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001921
  • Uscategui, P. A., Amaya, R. G., & García, N. A. (2020). Analysis of the time variable in on-site concrete production. Journal of Physics: Conference Series. https://doi.org/10.1088/1742-6596/1708/1/012002
  • Valente, C. P., Brandalise, F. M. P., & Formoso, C. T. (2019). Model for devising visual management systems on construction sites. Journal of Construction Engineering and Management, 145(2). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001596
  • Wu, P., & Low, S. P. (2012). Lean management and low carbon emissions in precast concrete factories in Singapore. Journal of Architectural Engineering, 18(2), 176–186. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000053
  • Wu, X., Yuan, H., Wang, G., Li, S., & Wu, G. (2019). Impacts of lean construction on safety systems: A system dynamics approach. International Journal of Environmental Research and Public Health, 16(2), 221. https://doi.org/10.3390/IJERPH16020221
  • Yang, X., Yu, Y., Shirowzhan, S., Sepasgozer, S., & Li, H. (2020). Automated PPE-Tool pair check system for construction safety using smart IoT. Journal of Building Engineering, 32, 101721. https://doi.org/10.1016/J.JOBE.2020.101721
  • Yeo, C. J., Yu, J. H., & Kang, Y. (2020). Quantifying the effectiveness of IoT technologies for accident prevention. Journal of Management in Engineering, 36(5), 04020054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000825
  • Zegarra, O., & Alarcón, L. F. (2019). Coordination of teams, meetings, and managerial processes in construction projects: Using a lean and complex adaptive mechanism. Production Planning and Control, 30(9), 736–763. https://doi.org/10.1080/09537287.2019.1578905
  • Zeng, W., Wang, H., Li, H., Zhou, H., Wu, P., & Le, Y. (2019). Incentive mechanisms for supplier development in mega construction projects. IEEE Transactions on Engineering Management, 66(2), 252–265. https://doi.org/10.1109/TEM.2018.2808169
  • Zhang, X., & Jeng, C. (2021). Implementing total productive maintenance in a manufacturing small or medium-sized enterprise. Journal of Industrial Engineering & Management, 14(2), 152–175. https://doi.org/10.3926/jiem.3286
  • Zhao, J., Zheng, Y., Seppänen, O., Tetik, M., & Peltokorpi, A. (2021). Using real-time tracking of materials and labor for kit-based logistics management in construction. Frontiers in Built Environment, 7, 7. https://doi.org/10.3389/FBUIL.2021.713976/FULL