Integrating exploratory factor analysis and fuzzy AHP models for assessing the factors affecting the performance of building construction projects: The case of Ethiopia

ORCID Icon, &
Article: 2243724 | Received 06 Apr 2023, Accepted 29 Jul 2023, Published online: 25 Aug 2023

References

  • Abay, A., Barbieri, G., & Woldearegay, K. (2019). GIS-based landslide susceptibility evaluation using Analytical Hierarchy Process (AHP) approach: The case of Tarmaber District, Ethiopia. Momona Ethiopian Journal of Science, 11(1), 14–38. https://doi.org/10.4314/mejs.v11i1.2
  • Abdellatif, H., & Alshibani, A. (2019). Major factors causing delay in the delivery of manufacturing and building Projects in Saudi Arabia. https://doi.org/10.3390/buildings9040093
  • Acebes, F., Poza, D. J., Pajares, J., Pajares, J., & Galán, J. M. (2015). Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. International Journal of Project Management, 33(7), 1597–1609. https://doi.org/10.1016/j.ijproman.2015.06.012
  • Aidan, I. A., Jaber, F. K., Al-Jeznawi, D., & Al-Zwainy, F. M. S. (2020, March). Predicting earned value indexes in residential complexes ’ construction projects using artificial neural network model. 1–13. https://doi.org/10.20944/preprints202003.0363.v1
  • Akali, T., & Sakaja, Y. Influence of contractors ’ financial capacity on performance of road construction in Kakamega County. 34–50.
  • Akomah, B. B., Justice, W., Mustapha, Z., & Kottey, S. (2018). Cost impacts of variations on building construction projects. MOJ Civil Engineering, 4(5), 403–408. https://doi.org/10.15406/mojce.2018.04.00133
  • Al-Zwainy, F. M. S., Jasim, N. A., & Al-Zwainy, F. M. (2020). Forecasting techniques in construction industry: Earned value indicators and performance models. Scientific Review Engineering and Environmental Studies (SREES), 29(2), 234–243. https://doi.org/10.22630/PNIKS.2020.29.2.20
  • Albtoush, A. M. F., Rahman, S. I. D. R. A., Al Momani, A. H., & Al-Momani, A. H. (2022). Critical success factors of construction projects in Jordan: An empirical investigation. Asian Journal of Civil Engineering, 23(7), 1087–1099. https://doi.org/10.1007/s42107-022-00470-8
  • Annals, S. (2017). Ranking alternatives by pairwise comparisons matrix and priority vector Jaroslav Ramík. Scientific Annals of Economics and Business, 64(s1), 85–95. https://doi.org/10.1515/saeb-2017-0040
  • Aslam, M., Baffoe-Twum, E., & Saleem, F. (2019). Design changes in construction projects – causes and impact on the cost. Civil Engineering Journal, 5(7), 1647–1655. https://doi.org/10.28991/cej-2019-03091360
  • Ayalew, G. G., Meharie, M. G., & Worku, B. (2022). A road maintenance management strategy evaluation and selection model by integrating Fuzzy AHP and Fuzzy TOPSIS methods: The case of Ethiopian roads authority. Cogent Engineering, 9(1). https://doi.org/10.1080/23311916.2022.2146628
  • Ayalew, G. M., Meharie, M. G., & Ayalew, G. G. (2023). Regression modeling for prediction of earned value indexes in public building construction projects: The case of Ethiopia. Cogent Engineering, 10(1). https://doi.org/10.1080/23311916.2023.2220497
  • Azim Eirgash, M. (2019). Earned value analysis for construction projects using project management scheduling engine. American Journal of Civil Engineering, 7(5), 121. https://doi.org/10.11648/j.ajce.20190705.11
  • Basahel, A., & Taylan, O. (2016a). Using Fuzzy AHP and fuzzy TOPSIS approaches for assessing safety conditions at worksites in construction industry. International Journal of Safety and Security Engineering, 6(4), 728–745. https://doi.org/10.2495/SAFE-V6-N4-728-745
  • Basahel, A., & Taylan, O. (2016b). Using fuzzy AHP and fuzzy TOPSIS approaches for assessing safety conditions at worksites in construction industry. International Journal of Safety and Secure Engineering, 6(4), 728–745. https://doi.org/10.2495/SAFE-V6-N4-728-745
  • Bekr, G. A. (2017). Factors affecting performance of construction projects in unstable political and economic situations. ARPN Journal of Engineering Applied Science, 12(19), 5384–5395.
  • Bhosekar, S. K., & Vyas, G. (2012). Cost controlling using earned value analysis in construction industries. 1(4), 324–332.
  • Boateng, E. Y., & Abaye, D. A. (2019). A review of the logistic regression model with emphasis on medical research. https://doi.org/10.4236/jdaip.2019.74012
  • Bourassa, D., Gauthier, F., Abdul-Nour, G., Bourassa, D., Gauthier, F., and Abdul-Nour, G. Equipment failures and their contribution to industrial incidents and accidents in the manufacturing industry. no. March 2018 2015. https://doi.org/10.1080/10803548.2015.1116814
  • Faremi, J., & Ogunsanmi, O. (2019, November). Factors affecting cost and time.
  • Fu, H., Chen, Y., & Wang, G. (2020). Using a fuzzy analytic hierarchy process to formulate an Effectual Tea Assessment System. Sustainability, 12(15), 6131. https://doi.org/10.3390/su12156131
  • Gituro, W., & Mwawasi, S. Time and cost overruns in road construction projects in Kenya under Kenya national highways authority. Operation Resources Society East Africa Journal. 6: 1 117–156.
  • Hassan, K., & Ali, N. (2020, June). The causes of variation orders and their effects on cost and time of projects in Sulaimani Governorate. https://doi.org/10.24017/science.2020.1.16
  • Heale, R., & Twycross, A. (2015). Validity and reliability in quantitative studies. Evidence Based Nursing, 18(3), 66–67. https://doi.org/10.1136/eb-2015-102129
  • Huang, H., & Ho, C. (2013, February). Applying the Fuzzy analytic hierarchy process to consumer decision-making regarding home stays. International Journal of Advancements in Computing Technology, 5(4), 981–990. https://doi.org/10.4156/ijact.vol5.issue4.119
  • Hummel, J. M., Bridges, J. F. P., & IJzerman, M. J. (2014). Group decision making with the analytic hierarchy process in benefit-risk assessment: A tutorial. The Patient - Patient-Centered Outcomes Research, 7(2), 129–140. https://doi.org/10.1007/s40271-014-0050-7
  • Jasper, I. C., Zhao, L., Mbachu, J., & Domingo, N. (2017). A better modelling and assessment of key factors affecting cost performance of building projects: The case of New Zealand. 6(5), 187–196. https://doi.org/10.5923/j.ijcem.20170605.01
  • Journal, S. A., & May, I. E. (2020). Study on factors affecting the performance of construction projects in the Democratic Republic of the Congo. South African Journal of Industrial Engineering, 31(1), 12–25. https://doi.org/10.7166/30-4-2193
  • Jugessur, Y. S. M. F. (2022). Dimension reduction, factor analysis, scree plot in educational research and academic performance. 11(4). https://doi.org/10.35629/7722-1104031528
  • Kandil, M. (2009). Exchange rate fluctuations and the balance of payments: Channels of interaction in developing. 24(March), 151–174.
  • Keng, T. C. (2015). The application of earned value management (Evm) in construction project management. Journal of Technology Management Business, 2(2).
  • Kil, S., Lee, D. K., Kim, J., Li, M., & Newman, G. (2016). Utilizing the analytic hierarchy process to establish weighted values for evaluating the stability of slope revegetation based on hydroseeding applications in South Korea. https://doi.org/10.3390/su8010058
  • Kumar, M., Jayaswal, P., & Kushwah, K. (2013) Exploring fuzzy SAW method for maintenance strategy selection problem of material handling equipment. 2008, 600–605.
  • Labor, B. P., Effect of land acquisition and compensation on the livelihoods of people in Quang Ninh District, Quang. no. 2000 2019.
  • Lendo-Siwicka, M., Pawluk, K., & Pawluk, K. (2016). Identification of the interference in the investment process during the realization of a shopping centre – A case study. Archives of Civil Engineering, 62(1), 159–172. https://doi.org/10.1515/ace-2015-0058
  • Mahamid, I. (2014). Effects of project’s physical characteristics on cost deviation in road construction. Journal of King Saud University - Engineering Sciences, 25(1), 81–88. https://doi.org/10.1016/j.jksues.2012.04.001
  • Meharie, M. G., Gariy, Z. C. A., Ndisya Mutuku, R. N., & Mengesha, W. J. (2019). An effective approach to input variable selection for preliminary cost estimation of construction projects. Advances in Civil Engineering, 2019, 1–14. https://doi.org/10.1155/2019/4092549
  • Meharie, M. G., Gariy, Z. C. A., Ngumbau, R., Mutuku, N., & Mengesha, W. J. (2019). An effective approach to input variable selection for preliminary cost estimation of construction projects. Advances in Civil Engineering, 2019, 1–14. https://doi.org/10.1155/2019/4092549
  • Memon, A. H. (2014, October). Factors affecting construction cost performance in project management projects: Case of MARA large projects.
  • Memon, A. H., Rahman, I. A., Asmi, A., and Azis, A. (2012). Time and cost performance in construction projects in Southern and central regions of Peninsular Malaysia. no. February 2015. https://doi.org/10.11591/ijaas.v1i1.537
  • Molla, S., Quezon, E. T., Mekonnen, E., Ararsa, W., & Gudissa, D. (2020). Factors affecting the performance in the implementation of government building construction projects: A case study in Bole Sub- City of Addis Ababa. 14(1001), 247–256.
  • Nyangwara, P. O., & Datche, E. (2015). Factors affecting the performance of construction projects: A survey of construction projects in the Coastal Region of Kenya. International Journal of Scientific and Research Publications, 5(10), 1–43.
  • Ofori, G. (2000, November). Challenge of construction sector in developing country. 2nd International ConferenceConstruct Devire Ctries Challenges Facing Construction Industry in Developing Countries, 15–17, 1–13.
  • Oke, A., Ogungbile, A., Oyewobi, L., & Tengan, C. (2016). Economic development as a function of construction project performance. Journal of Construction Project Management, 6(2), 1447–1459.
  • Omran, A. Factors affecting cost performance in construction projects within Kelantan State in Malaysia. no. January 2010, 2017.
  • Osuizugbo, I., & Okuntade, T. F. (2020, June). Conflict management practice among stakeholders in construction project delivery. Covenant Journal of Research in the Built Environment, 8(1). https://doi.org/10.47231/ZWUX7965
  • Pookot, N. (2017). International journal of engineering sciences & research technology a comparison of different cost forecasting methods using earned value metrics. 6(6), 302–319.
  • Richardson, T., Elliott, P., Roberts, R., & Jansen, M. (2016). A longitudinal study of financial difficulties and mental health in a national sample of British undergraduate students. Community Mental Health Journal, 53(3), 344–352. https://doi.org/10.1007/s10597-016-0052-0
  • Rooshdi, R. R. R. M., Majid, M. Z. A., Sahamir, S. R., & Ismail, N. A. A. (2018). Relative importance index of sustainable design and construction activities criteria for green highway. Chemical Engineering Transaction, 63(2007), 151–156. https://doi.org/10.3303/CET1863026
  • Russo, R. D. F. S. M., & Camanho, R. (2015). Criteria in AHP: A systematic review of literature. Procedia computer science, 55(Itqm), 1123–1132. https://doi.org/10.1016/j.procs.2015.07.081
  • Sachdev, A., & Agrawal, J. (2017). Application of policy deployment and daily management in service sector. International Journal of Quality Innovation, 3(1), 0–17. https://doi.org/10.1186/s40887-017-0017-6
  • Saghafian, S., & Hejazi, S. R. (2005). Multi-criteria group decision making using a modified fuzzy TOPSIS procedure. Proc International Conference Computer Intelligence Model Control Automation CIMCA 2005 International Conference Intelligence Agents, Web Technology Internet, 2, 215–220. https://doi.org/10.1109/cimca.2005.1631471
  • Sahat, N. (2017). Causes of shortage and delay in material supply : A preliminary study: A preliminary study. https://doi.org/10.1088/1757-899X/271/1/012037
  • Salikuma, S., Minu, M., & Johny, A. (2016). Application of earned value analysis in analysing project performance. International Journal of Engineering Research, 5(9), 459–464. https://doi.org/10.17577/IJERTV5IS090341
  • Sharma, S., & Gupta, A. (2021, January). Analysis of factors affecting cost and time overruns in construction. https://doi.org/10.1007/978-981-33-6969-6
  • Shenoy, S. (2015). Project performance evaluation by earned value analysis. 2(5), 1675–1684.
  • Somiah, M. K., Aidoo, I., & Aidoo, I. (2015). Relative importance analysis of factors influencing unauthorized siting of residential buildings in the Metropolis of Ghana. Journal of Building Construction and Planning Research, 03(3), 117–126. https://doi.org/10.4236/jbcpr.2015.33012
  • Stief, P., Dantan, J., Etienne, A., & Siadat, A. (2018). Science direct fuzzy AHP as a tool prioritization of performance indicators CIRP for design Jüri functional the and physical architecture of existing products for an assembly oriented product family identification. Procedia CIRP, 72, 1227–1232. https://doi.org/10.1016/j.procir.2018.02.026
  • Sun, C. C. (2010). A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 37(12), 7745–7754. https://doi.org/10.1016/j.eswa.2010.04.066
  • Tahvili, S., Saadatmand, M., & Bohlin, M. (2015). Multi-criteria test case prioritization using Fuzzy Analytic Hierarchy process, 290–296.
  • Takim, R., & Akintoye, A. (2002). Performance indicators for successful. 2(September), 2–4.
  • Tochaiwat, K. (2016, April). The effect of the number of floors on the construction of the houses built by conventional system and precast technology.
  • Vahidnia, M. H., Alesheikh, A., Alimohammadi, A., & Bassiri, A. (2008). Fuzzy analytical hierarchy process in GIS application. International Archives Photogramm Remote Sensors Spat Inf Sciences, 37(B2), 593–596.
  • Vyas, A. B., & Birajdar, B. V. (2016). Tracking of construction projects by earned value management. International Journal of Engineering Resources, V5(3), 829–831. https://doi.org/10.17577/ijertv5is031318
  • Wahed, A. (2018). Statistical analysis: Internal-consistency reliability and construct validity said Taan EL Hajjar Ahlia University. 6(1), 27–38.
  • Wang, C. N., Yang, C. Y., & Cheng, H. C. (2019). A fuzzy Multicriteria Decision-Making (MCDM) model for sustainable supplier evaluation and selection based on triple bottom line approaches in the garment industry. Processes, 7(7), 1–13. https://doi.org/10.3390/pr7070400
  • Wani, S. R. (2017). Edu/research methodology/sampling. Population Sample, 1–7.
  • Xie, H., Zheng, J., Zhang, Y., & Li, H. (2019). Effects of payment delays at two links in payment chains on the progress of construction projects: System dynamic modeling and simulation. Sustainability, 11(15), 4115. https://doi.org/10.3390/su11154115
  • Yu, T., & Richardson, J. C. (2015). An exploratory factor analysis and reliability analysis of the Student Online Learning Readiness (SOLR) instrument. Online Learning, 19(5), 120–141. https://doi.org/10.24059/olj.v19i5.593
  • Zain, S. N. (2021, December). Ineffective site management practices and their impacts on project performance. https://doi.org/10.13140/RG.2.2.14697.21600
  • Zewdie, T. H. (2016). The effectiveness of project management processes on performance of construction projects: Case study analysis in selected companies in Addis Ababa. Management, 6(6), 203–212. https://doi.org/10.5923/j.mm.20160606.04