Mitigating the effects of delay risk in building construction projects in Ghana

, &
Article: 2345522 | Received 09 Oct 2023, Accepted 16 Apr 2024, Published online: 02 May 2024

References

  • Abdelnaser, O., Peter, J. N., Mahmood, A., Hussin, A., & Aziz, A. (2005). Causes of construction delays case studies in Langkawi Island, Malaysia. In International Conference on Built Environmental in Kuala Lumpur organized by University of Malaya, Kuala Lumpur.
  • Abedi, M., Fathi, M. S., & Mohammad, M. F. (2011). Major mitigation measures for delays in construction projects [Paper presentation]. In The First Iranian Students Scientific Conference in Malaysia (Vol. 9).
  • Agyakwa-Baah, A. (2007). Stakeholders’ perceptions of the causes of delay on construction projects [unpublished B.Sc, dissertation]. Kwame Nkrumah University of Science and Technology.
  • Agyakwa-Baah, A. (2009). A study into risk assessment and management practices within Ghanaian medium and large construction organisations. Unpublished MSc Project.
  • Agyekum-Mensah, G., & Knight, A. D. (2017). The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), 828–841. https://doi.org/10.1108/ECAM-03-2016-0085
  • Ahmed, S. M., S., & Castillo, M. (2000). Construction delays in Florida: An empirical study. A Report submitted to Department of Community Affairs, Florida State.
  • Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5
  • Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), 667–677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
  • Al-Kharashi, A., & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), 3–23. https://doi.org/10.1080/01446190802541457
  • Alkass, S., Mazerolle, M., & Harris, F. (1996). Construction delay analysis techniques. Construction Management and Economics, 14(5), 375–394. https://doi.org/10.1080/014461996373250
  • Alotaibi, N. O., Sutrisna, M., & Chong, H. Y. (2016). Guidelines of using project management tools and techniques to mitigate factors causing delays in public construction projects in kingdom of Saudi Arabia. Journal of Engineering, Project, and Production Management, 6(2), 90–103. https://doi.org/10.32738/JEPPM.201607.0003
  • Alsuliman, A. J. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801–808. https://doi.org/10.1016/j.aej.2019.07.002
  • Amoatey, C. T., & Ankrah, A. N. O. (2017). Exploring critical road project delay factors in Ghana. Journal of Facilities Management, 15(2), 110–127. https://doi.org/10.1108/JFM-09-2016-0036
  • Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 8(1), 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035
  • Arantes, A., & Ferreira, L. M. D. (2021). A methodology for the development of delay mitigation measures in construction projects. Production Planning & Control, 32(3), 228–241. https://doi.org/10.1080/09537287.2020.1725169
  • Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010
  • Aydin, D., & Mihlayanlar, E. (2018). Causes and effects of construction project delays: A local case study in Edirne City Centre. In 5th International Project and Construction Management Conference (IPCMC 2018). https://www. researchgate. net/publication/329415192_Causes_and_Effects_of_Construction_Project_Delays_A_Local_Case_Study_in_Edirne_City_Centre.
  • Baah, F. (2010). Use of children and the issue of child labour in Ghanaian cocoa farm activities. Journal of Agricultural Extension and Rural Development, 2(9), 198–204.
  • Bashir, H., Ojiako, U., & Mota, C. (2019). Modeling and analyzing factors affecting project delays using an integrated social network-fuzzy MICMAC approach. 26–36. https://doi.org/10.1080/10429247.2019.1656595
  • Berggren, C., Söderlund, J., & Anderson, C. (2001). Clients, contractors, and consultants: The consequences of organizational fragmentation in contemporary project environments. Project Management Journal, 32(3), 39–48. https://doi.org/10.1177/875697280103200306
  • Berko, P. (2007). Project cost overrun in the road construction industry in Ghana [Unpublished M.Sc. Project Management dissertation]. Sheffield Hallam University.
  • Bird, D., & Dominey-Howes, D. (2008). Testing the use of a ‘questionnaire survey instrument’ to investigate public perceptions of tsunami hazard and risk in Sydney, Australia. Natural Hazards, 45(1), 99–122. https://doi.org/10.1007/s11069-007-9172-8
  • Braimah, N., & Ndekugri, I. (2009). Consultants’ perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), 1279–1288. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000096
  • Buertey, J. I. T., Miezah, A. K., & Adjei-Kumi, T. (2014). Delays to large construction projects in Ghana: A risk overview. In Proceedings: 5th West Africa Built Environment Research (WABER) Conference (pp. 367–380). WABER Conference.
  • Chan, D. W., & Kumaraswamy, M. M. (2014). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23–35.
  • Cheung, C. M., Zhang, R. P., Wang, R., Hsu, S. C., & Manu, P. (2022). Group-level safety climate in the construction industry: Influence of organizational, group, and individual factors. Journal of Management in Engineering, 38(1), 04021080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000978
  • Cordesman, A. H. (2003). Saudi Arabia enters the twenty-first century: The political, foreign policy, economic, and energy dimensions (Vol. 2). Praeger Publishers.
  • Cronbach, L. J. (1951). Coefficient alpha and the internal structure of tests. Psychometrika, 16(3), 297–334. https://doi.org/10.1007/BF02310555
  • Culfik, M., Sarikaya, O., & Altun, H. (2014). Causes of delays in construction projects in Turkey [Paper presentation]. 11th International Congress on Advances in Civil Engineering.
  • Dada, J. O., & Jagboro, G. O. (2007). An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), 37–44. https://doi.org/10.1108/13664380780001092
  • Denini, F. (2009 Delays on large construction projects in Libya [Paper presentation]. Proceedings: The 3rd International Conference on Built Environment in Development Countries.
  • Dissanayaka, S. M., & Kumaraswamy, M. M. (1999). Reconstructing procurement systems and team relationships. International Journal of Computer Integrated Design and Construction, 1(2), 10–19.
  • Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 13(1), 20–46. https://doi.org/10.1108/IJMPB-09-2018-0178
  • Edwards, P. J., & Bowen, P. A. (1998). Risk and risk management in construction: A review and future directions for research. Engineering, Construction and Architectural Management, 5(4), 339–349. https://doi.org/10.1108/eb021087
  • Enshassi, A., Mohamed, S., & Abushaban, S. (2009). Factors affecting the performance of construction projects in the Gaza strip. Journal of Civil Engineering and Management, 15(3), 269–280. https://doi.org/10.3846/1392-3730.2009.15.269-280
  • Farris, J. A., Groesbeck, R. L., Van Aken, E. M., & Letens, G. (2006). Evaluating the relative performance of engineering design projects: A case study using data envelopment analysis. IEEE Transactions on Engineering Management, 53(3), 471–482. https://doi.org/10.1109/TEM.2006.878100
  • Fawzy, S. A., El-Adaway, I. H., Perreau-Saussine, L., Abdel Wahab, M. S., & Hamed, T. H. (2018). Claims for extension of time and additional payment under common law FIDIC: Civil law analysis. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(4), 06518002–06518008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000276
  • Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8
  • Fugar, F. D., & Agyakwah-Baah, A. B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2), 103. https://doi.org/10.5130/ajceb.v10i1/2.1592
  • Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., & Ani, A. C. (2011). Cause of construction delay-Theoretical framework. Procedia Engineering, 20, 490–495. https://doi.org/10.1016/j.proeng.2011.11.192
  • Hassanein, A. A., & Afify, H. M. (2007). A risk identification procedure for construction contracts—A case study of power station projects in Egypt. Civil Engineering and Environmental Systems, 24(1), 3–14. https://doi.org/10.1080/10286600600910104
  • Ibbs, W., Nguyen, L. D., & Lee, S. (2007). Quantified impacts of project change. Journal of Professional Issues in Engineering Education and Practice, 133(1), 45–52. https://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(45)
  • Jerie, S. (2012). Occupational health and safety problems among workers in the wood processing industries in Mutare. Zimbabwe. Journal of Emerging Trends in Economics and Management Sciences, 3(3), 278–285.
  • Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), 83–94. https://doi.org/10.1080/014461997373132
  • Kazaz, A., & Ulubeyli, S. (2009). Cost and time focused risk analysis in Turkish construction industry [Paper presentation]. Collaboration and Integration in Engineering, Management and Technology (pp. 340–347).
  • Kheni, N. A., & Ackon, F. (2015). Impact of total quality management practices (TQMPS) on construction project quality performance in developing countries: Study of construction businesses in Ghana. International Journal of Management Science, 2(3), 35–51.
  • Kikwasi, G. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building - Conference Series, 1(2), 52–59. (https://doi.org/10.5130/ajceb-cs.v1i2.3166
  • Li, H., Love, P. E. D., & Drew, D. S. (2000). Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), 211–220. https://doi.org/10.1108/eb021146
  • McGraw, R. L. (2009). Project time management: The foundation for effective resource management. Cognitive Technologies Inc.
  • Molner, B. (2007). Project Delays, Disruptions, and Changes. Ater Wynne LLP.
  • Moodley-Nyide, T., & Haupt, T. C. (2020). Integrated project delivery systems as an alternative procurement method to reduce project delays. Journal of Construction, 12(2), 5.
  • Mpofu, B., Ochieng, E. G., Moobela, C., & Pretorius, A. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), 346–376. https://doi.org/10.1108/ECAM-05-2015-0072
  • Musarrat, M. A., Inderyas, O., Khan, S., & Shah, A. A. (2016). Causes of delay in the execution phase of construction projects in Khyber Pukhtoonkhwa Pakistan. Sarhad University International Journal of Basic and Applied Sciences, 4(1), 62–70.
  • Mydin, M. O., Sani, N. M., Taib, M., & Alias, N. M. (2014 Imperative causes of delays in construction projects from developers’ outlook [Paper presentation]. In MATEC Web of Conferences (Vol. 10, p. 06005). EDP Sciences. https://doi.org/10.1051/matecconf/20141006005
  • Nguyen, L. D., Ogunlana, S. O., & Lan, D. T. (2004). A study on project success factors on large construction projects in Vietnam. Engineering, Construction and Architectural Management, 11(6), 404–413. https://doi.org/10.1108/09699980410570166
  • Noulmanee, A., Wachirathamrojn, J., Tantichattanont, P., & Sittivijan, P. (1999). Internal causes of delays in highway construction projects in Thailand. International Journal of Project Management, 17, 149–159.
  • Nwachukwu, C. C. (2009). Client’s constraining factors to construction project management success in Nigeria: A systems analytical approach. International Journal of Development and Management Review, 4(1), 207–219.
  • Ofori, G. (2012). Developing the Construction Industry in Ghana: The case for a central agency. A concept paper prepared for improving the construction industry in Ghana. National University of Singapore, 13(1), 3–18.
  • Ofori, G. (2018). Developing the Construction Industry in Ghana: the case for a central agency. A concept paper prepared for improving the construction industry in Ghana. National University of Singapore, 13(1), 3–18.
  • Ogweno, B., Muturi, W., & Rambo, C. (2016). Determinants of timely completion of road construction projects financed by Kenya Roads board in Kisumu County. International Journal of Economic Governance and Management, 4(11), 360–402.
  • Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalations: Causes and effects in Nigeria. In Proceedings of the 6th International Postgraduate Research Conference in the Built and Human Environment (pp. 79–93). University of Salford.
  • Osei-Asibey, D., Ayarkwa, J., Acheampong, A., Adinyira, E., & Amoah, P. (2021). An examination of causes of accidents and hazards in the Ghanaian construction industry. Open Journal of Safety Science and Technology, 11(2), 66–88. https://doi.org/10.4236/ojsst.2021.112006
  • Pall, G. K., Bridge, A. J., Gray, J., & Skitmore, M. (2019). Causes of delay in power transmission projects: An empirical study. Energies, 13(1), 17. https://doi.org/10.3390/en13010017
  • Pandey, G., Burugu, S. K., & Singh, P. (2016). Efficient strategy for the construction of both enantiomers of the octahydropyrroloquinolinone ring system: Total synthesis of (+)-aspidospermidine. Organic Letters, 18(7), 1558–1561. https://doi.org/10.1021/acs.orglett.6b00374
  • Pinamang, P. A., Adu Gyamfi, T., Danso, H., & Ampofo Kwame, J. (2018). Schedule delay analysis of construction projects in Ghana: objectives, importance and effects. Civil and Environmental Research, 10(4), 25–30.
  • PMI. (2013). A guide to the Project Management Body of Knowledge (PMBOK guide) (5th ed.). PMI.
  • Pourrostam, T., Ismail, A., & Mansournejad, M. (2011). Identification of success factors in minimizing delays on construction projects in IAU-Shoushtar Branch-Iran. Applied Mechanics and Materials, 94-96, 2189–2193. (Trans Tech Publications Ltd. https://doi.org/10.4028/www.scientific.net/AMM.94-96.2189
  • Saeed, S. A. A. (2009). Delay to Projects-cause, effect and measures to reduce/eliminate delay by mitigation/acceleration [Doctoral dissertation]. British University in Dubai.
  • Salifu, Z., Osei, K. A., & Adjasi, C. K. (2007). Foreign exchange risk exposure of listed companies in Ghana. The Journal of Risk Finance, 8(4), 380–393. https://doi.org/10.1108/15265940710777324
  • Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
  • Song, J., Fu, Y., & Bagaya, O. (2016). Compensation mechanism for early termination of highway BOT projects based on ARIMA model. International Journal of Architecture, Engineering and Construction, 5(1), 53–60.
  • Sunjka, B. P., & Jacob, U. (2013). Significant causes and effects of project delays in the Niger delta region, Nigeria (pp. 641–614). Southern African Institute of Industrial Engineering.
  • Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009
  • Talukhaba, A. A. (1999). An investigation into factors causing construction project delays in Kenya case study of high rise building projects in Nairobi [Doctoral dissertation]. University of Nairobi.
  • Tamimi, A. A., Ansari, A. A., Kashwani, G., & Sajwani, A. (2017). Application of “TQM” and “TSM” in UAE construction safety management. Industrial Engineering & Management, 6(3), 2169. https://doi.org/10.4172/2169-0316.1000220
  • Toor, S. U. R., & Ogunlana, S. O. (2008). Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395–408. https://doi.org/10.1080/01446190801905406
  • Tse, R. Y., & Love, P. E. (2003). An economic analysis of the effect of delays on project costs. Journal of Construction Research, 04(02), 155–160. https://doi.org/10.1142/S1609945103000376
  • Ulusoy, G., & Cebelli, S. (2000). An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research, 127(2), 262–278. https://doi.org/10.1016/S0377-2217(99)00499-3
  • Umar, T. (2018). Causes of delay in construction projects in Oman. Middle East J. of Management, 5(2), 121–136. 2018 https://doi.org/10.1504/MEJM.2018.091132
  • Walliman, N. (2005). Your research project: a step-by-step guide for the first-time researcher. Sage Publications, NewYork.
  • Wang, T.-K., Ford, D. N., Chong, H.-Y., & Zhang, W. (2018). Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), 1534–1551. https://doi.org/10.1108/ECAM-10-2016-0227
  • Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717–1729. https://doi.org/10.1016/j.aej.2020.11.021
  • Zailani, S., Ariffin, H. A. M., Iranmanesh, M., Moeinzadeh, S., & Iranmanesh, M. (2016). The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance. Journal of Science and Technology Policy Management, 7(3), 346–368. https://doi.org/10.1108/JSTPM-12-2015-0041